Public Sa fe ty a nd Se c urity a round Sa skPowe r Da ms Par tne - - PowerPoint PPT Presentation

public sa fe ty a nd se c urity a round sa skpowe r da ms
SMART_READER_LITE
LIVE PREVIEW

Public Sa fe ty a nd Se c urity a round Sa skPowe r Da ms Par tne - - PowerPoint PPT Presentation

Public Sa fe ty a nd Se c urity a round Sa skPowe r Da ms Par tne r s F OR the Saskatc he wan Rive r Basin and Canadian Wate r Re sour c e s Assoc iation Saskatc he wan Br anc h 2018 Confe r e nc e T he Damme d Rive r s! Oc tobe


slide-1
SLIDE 1

Public Sa fe ty a nd Se c urity a round Sa skPowe r Da ms

Par tne r s F OR the Saskatc he wan Rive r Basin and Canadian Wate r Re sour c e s Assoc iation Saskatc he wan Br anc h 2018 Confe r e nc e – T he Damme d Rive r s! Oc tobe r 1 – 3, 2018

Prepared by: Doug Kilgour and Jeff Gienow

slide-2
SLIDE 2

Intr

  • duc tion
  • 11 fatalitie s in Canada due to public safe ty inc ide nts ar
  • und

dams fr

  • m 2012 to 2014
  • Only a total of 11 fatalitie s as a r

e sult of dam failur e in Canada with the most r e c e nt loss of life in 1963

  • Highlights the impor

tanc e of public safe ty ar

  • und dams to

Canadian dam owne r s and r e gulator s

slide-3
SLIDE 3

Bac kgr

  • und
  • Sa skPowe r owns a nd ope ra te s 19

da ms a t 11 site s a c ross Sa ska tc he wa n

  • Se ve n hydroe le c tric fa c ilitie s a nd

two c oa l fire d fa c ilitie s

  • Ash la g oon syste ms a t c oa l

fa c ilitie s inc lude 26 km of dyke s

slide-4
SLIDE 4

Sa skPowe r ’s Da m Sa fe ty Pr

  • g r

a m

  • Dam Safe ty Polic y e stablishe d in 2010
  • Polic y illustr

ate s SaskPowe r ’s c ommitme nt to managing its dams in a safe manne r in ac c or danc e with applic able r e gulator y r e quir e me nts and/ or r e c ognize d industr y pr ac tic e s

  • SaskPowe r

’s Dam Safe ty Pr

  • gr

am follows the Dam Safe ty Guide line s, 2007 (Re vise d 2013) and Guide line s fo r Public Safe ty ar

  • und Dams, 2011 as publishe d by the Canadian Dam

Assoc iation (CDA)

slide-5
SLIDE 5

Sa skPowe r ’s Da m Sa fe ty Pr

  • g r

a m

  • T

he main c ompone nts of the Dam Safe ty Pr

  • gr

am inc lude :

  • Dam Safe ty Manage me nt
  • Dam Safe ty Re vie w and Inspe c tion
  • Ope r

ation, Mainte nanc e , and Sur ve illanc e

  • E

me r ge nc y Manage me nt

  • Analysis and Asse ssme nt
  • Public Safe ty and Se c ur

ity Manage me nt

  • Suppor

t to OM&A and Capital Pr

  • je c ts
slide-6
SLIDE 6

Public Sa fe ty a nd Se c urity Issue s

  • Public ac c e ss upstr

e am and downstr e am of str uc tur e s

  • Spillwa y a nd powe rhouse ope ra tion
  • Upstre a m c urre nts
  • Downstre a m wa te r le ve l fluc tua tions a nd turbule nc e
  • Public ac c e ss ar
  • und r

e se r voir r im

  • Unauthor

ize d public ac c e ss to SaskPowe r site s

slide-7
SLIDE 7

Public Safe ty & Se c ur ity Ar

  • und Dams
  • Ide ntify pote ntia l ha za rds
  • Control ha za rds
  • E

liminate

  • Mitigate

Install bar r ie r s (fe nc e s, booms, guar dr ails)

War n the public (signs, buoys, sir e ns, e tc )

Pr

  • vide for

e me r ge nc y r e sponse (life pr e se r ve r s, e tc )

  • E

duc ate the public

  • Public Sa fe ty Ma na g e me nt Pla n

CDA Guide line s

slide-8
SLIDE 8

SaskPowe r Pr

  • c e ss
  • De te r

mine r e quir e me nts as pe r CDA guide line s

  • Comple te Public Safe ty and Se c ur

ity Asse ssme nts (PSSA)

  • Pr

e par e Public Safe ty Manage me nt Plans (PSMP)

  • Imple me nt PSMP
  • Wor

k c omple te d outside of the Dam Safe ty Pr

  • gr

am

slide-9
SLIDE 9

PSSA

  • Comple te d by inde pe nde nt c onsultants
  • De sktop study to ide ntify study are as and issue s
  • Site visit
  • Summary of e xisting c onditions
  • E

xisting infrastruc ture / hazards

  • E

xisting mitigation me asure s

  • Known public inte rac tions
  • Risk asse ssme nt
  • De taile d re port with re c omme ndations
slide-10
SLIDE 10

Sample PSSA Re c omme nde d Me asur e s

slide-11
SLIDE 11

PSMP

  • Stake holde r

e ngage me nt (ope n house s)

  • Role s and r

e sponsibilitie s

  • Re vie w of PSSA pr
  • c e ss and outc ome s
  • SaskPowe r

r e sponse to r e c omme ndations

  • Submit PSMP for

imple me ntation by othe r s

  • Pr
  • vide suppor

t dur ing imple me ntation

  • Inspe c tion and mainte nanc e
  • Re c or

d manage me nt and r e por ting

slide-12
SLIDE 12

Boundar y Dam

slide-13
SLIDE 13

Boundar y Dam

slide-14
SLIDE 14

Poplar Rive r

slide-15
SLIDE 15

Poplar Rive r

slide-16
SLIDE 16

Nipawin / E B Campbe ll

slide-17
SLIDE 17

Nipawin / E B Campbe ll

slide-18
SLIDE 18

Nipawin / E B Campbe ll

slide-19
SLIDE 19

Island F alls / White sand Dam

slide-20
SLIDE 20

Island F alls / White sand Dam

slide-21
SLIDE 21

Athabasc a

slide-22
SLIDE 22

Athabasc a

slide-23
SLIDE 23

Summar y of Pr

  • gr

e ss

Facility PSSA PSMP Implementation

Boundary Dam / Ash Lagoons Dec-2014 Dec-2015 2016 Morrison Dam / Poplar River Ash Lagoons Sep-2016 Dec-2016 2017 Coteau Creek Oct-2017 Mar-2018 2018-2020 Nipawin Jun-2017 Mar-2018 2018-2021 EB Campbell May-2017 Mar-2018 2018-2021 Island Falls Dec-2015 Dec-2015 2016-2020 Athabasca Mar-2018 Dec-2018 2019-2021

slide-24
SLIDE 24

Que stions?