public hearing public hearing
play

PUBLIC HEARING PUBLIC HEARING FARM- RM-TO-MARKET R O-MARKET ROAD - PowerPoint PPT Presentation

PUBLIC HEARING PUBLIC HEARING FARM- RM-TO-MARKET R O-MARKET ROAD (FM AD (FM) ) 664 664 ROADW ADWAY WIDENING PR Y WIDENING PROJECT OJECT FR FROM: Int OM: Inters rstat tate Highw Highway y (IH) 35 East (IH) 35 East (E) (E) TO: IH


  1. PUBLIC HEARING PUBLIC HEARING FARM- RM-TO-MARKET R O-MARKET ROAD (FM AD (FM) ) 664 664 ROADW ADWAY WIDENING PR Y WIDENING PROJECT OJECT FR FROM: Int OM: Inters rstat tate Highw Highway y (IH) 35 East (IH) 35 East (E) (E) TO: IH 45 : IH 45 Ellis County Ellis County, T , Texas xas CSJs: 1051-01-051, 1051-03-001; 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019

  2. PUBLIC PUBLIC HEARI HEARING INTR INTRODUCTI DUCTIONS NS ELECTED & PUBLIC OFFICIALS ELECTED & PUBLIC OFFICIALS TxDO TxDOT STAFF FF CONSULTANT CONSUL NTS CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 2

  3. PUBLIC HEARING PURPOSE PUBLIC HEARING PURPOSE 1. 1. Inf Inform the rm the public of public of project s project status and present atus and present recommendations recommendations 2. 2. Describe the Describe the project so the project so the public can determine ho public can determine how w the they may be ma y be af affected cted 3. 3. Pro Provide the ide the public the public the oppor opportunity to unity to of offer input r input 4. 4. De Develop a record of public par lop a record of public participation ticipation CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 3

  4. PUBLIC HEARING AGEND PUBLIC HEARING A ENDA 1 Introduction Ceason Clemens, P.E. (TxDOT) 2 Project Design Presentation Shane Walters, P.E. (HDR) 3 Environmental Presentation Sonny Kaiser (EPR) 10 Minute Recess 4 Ceason Clemens, P.E. (TxDOT) Public Comments CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 4

  5. PUBLIC PUBLIC INQUIRI INQUIRIES ES Sc Schematics ma hematics may be y be vie viewed at ed at: TxDOT Dallas District Office 4777 E. Highway 80 Mesquite, Texas 75150  Websites www.keepitmovingdallas.com/ • Under “Public Hearings/Meetings” www.txdot.gov/ • Search “Hearings and Meetings Schedule” CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 5

  6. PR PROJE OJECT L T LOCATI TION ON, NEED AND PURPOSE , NEED AND PURPOSE PR PROJECT LIMITS: OJECT LIMITS: From IH 35 E to IH 45 • Total Project length: • approximately 12.9 miles PROJECT NEED: PR OJECT NEED: Increasing population • Increasing traffic volumes • and conflicting travel movements Impaired safety and mobility • PR PROJECT PURPOSE: OJECT PURPOSE: Alleviate traffic congestion • Accommodate future traffic • Improve mobility • CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 6

  7. Existing Facility - FM 664 From IH 35E to SH 342 Four divided 12-foot travel lanes (two lanes in each direction) • Continuous left-turn lane, curb and gutter. • Existing sidewalks are located near the IH 35 interchange between Sharaf Ave and Hickory • Creek Drive. No bike accommodations • CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 7

  8. Existing Facility - FM 664 From SH 342 To N. Central St. Two undivided 12-foot travel lanes (one lane in each direction) • 10-foot outside shoulders and open ditches. • No pedestrian or bike accommodations • CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 8

  9. PR PROPOSED F OPOSED FACILI CILITY Y - FM 66 M 664 4 From rom IH 35E to IH 45 IH 35E to IH 45 Two 12-foot travel lanes and one 14-foot outside shared-use lane (in each direction) • 17-foot raised median • 5 to 6-foot sidewalks on both sides of the roadway • CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 9

  10. PR PROPOSED F OPOSED FACILI CILITY - Y - Single P ingle Point int Urban ban Int nterchange erchange (SPUI) (SPUI) at IH 35E at IH 35E CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 10

  11. PR PROPOSED F OPOSED FACILIT CILITY - Y - IH 45 H 45 Grade-Separat Grade-Separated Interchange d Interchange CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 11

  12. UTILI UTILITY AD Y ADJUSTMENT JUSTMENTS  Underground and overhead utilities – Adjustments and relocations would be required prior to construction CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 12

  13. PR PROJE OJECTED COST & TED COST & SCHEDULE SCHEDULE Anticipat Anticipated R d Ready to Let ady to Let Date Date Ma May 2023 y 2023 Cons Construction Duration truction Duration Appro Approximately 3 to 5 y imately 3 to 5 year ars s Es Estimated T timated Total Project Cos l Project Cost Appro Approximately $3 imately $370 million 70 million CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 13

  14. REVIEW AND APPR REVIE AND APPROVAL OF ENVIR OF ENVIRONMENT NMENTAL DOCUMENT L DOCUMENT The environmental re The en vironmental revie view, consultation, and other actions , consultation, and other actions required b required by applicable F applicable Federa deral en l environmental la vironmental laws for this ws for this project are being, or ha project are being, or have been, carried-out b been, carried-out by TxDO TxDOT pur T pursuant uant to 23 U.S.C. 32 to 23 U.S.C. 327 and a Memora 7 and a Memorandum ndum of Under of Understanding dated tanding dated December 1 December 16, , 20 2014, 14, and e and executed b ecuted by FHW FHWA and TxDO and TxDOT. CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 14

  15. ENVIR ENVIRONMENT NMENTAL REVIEW / L REVIEW / IMP IMPACT CTS ADDRESSED S ADDRESSED IMP IMPACT CTS ADDRESSED S ADDRESSED  Right-of-Way Acquisition  Water Resources  Hazardous Materials  Traffic Noise  Archeological Resources  Air Quality  Biological Resources  Community  Historic Resources  Indirect and Cumulative Impacts  Vegetation  Wetlands / Waters of the U.S. CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 15

  16. ENVIR ENVIRONMENT NMENTAL REVIEW – L REVIEW – RIGHT OF W IGHT OF WAY  Proposed Proposed Right of W Right of Way (R y (ROW) – Appro Approxim imat ately 1 ely 164 acres of addition 4 acres of additional R al ROW w W would be required uld be required  Proposed Easemen Proposed Easements – 8 8 acres of acres of drainage easements w drainage easements would be uld be required required  Displacements Displacements – 11 single-family residential displacements single-family residential displacements – 3 3 multi-family residential displacements multi-family residential displacements – 10 commercial displacements 10 commercial displacements All R All ROW W Acquisition would be co Acquisition would be complet mpleted in accorda d in accordance with ce with the the Uniform R iform Relocation Assis location Assistance and ance and Re Real P Property A Acquisition P quisition Policies licies Act of 19 Act of 1970, 70, as amended. as amended. CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 16

  17. ENVIR ENVIRONMENT NMENTAL REVIEW - L REVIEW - CONTINUED ONTINUED Traffic Noise Traff Noise Floodplains Floo Waters of the U.S. Waters of the U.S. Biolog Biol ogical al HAZMAT HAZ Anticipated impacts • The proposed  Two moderate risk The project  Traffic Noise • • to waters of the U.S., project would sites identified. corridor is situated Analysis 0.06 acre impact to disturb within portions the completed in  Three high risk wetlands and 2,118 approximately: of FEMA accordance with sites identified. linear feet impact to designated 100- TxDOT guidelines. 34 acres of (Three gas stations • waters of the U.S. year flood hazard that would be agriculture land Based on analysis  area associated Impacts to waters of • displaced by no noise barriers 34 acres of • with Bear Creek the U.S. associated project.) were determined disturbed prairie and Long Branch with project to be both  Further Creek and some of construction would 2 acres of mixed • reasonable and investigation their associated likely be covered woodlands and feasible. indicated that tributaries. under Nationwide forest these sites have a Permit 14, & due to The hydraulic • 22 acres of riparian low impact • anticipated impacts design for this habitat potential. to a special aquatic project would be in site (emergent 10 acres of tall • accordance with wetland), a PCN to grass prairie current TxDOT, the USACE would be policies. required. Conclusion: Co nclusion: Studies, a Studies, anal alyse yses, and e , and eval aluati uation of the n of the proposed project indicate no proposed project indicat no sig significant impa ificant impacts cts CSJs: 1051-01-051, 1051-03-001, 0442-03-042, and 0092-03-053 Thursday, June 27, 2019 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend