PROPOSED December 9, 2014 BOND REFERENDUM PRESENTATION 713 Creek - PowerPoint PPT Presentation

PROPOSED December 9, 2014 BOND REFERENDUM PRESENTATION 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com CLAYTON PUBLIC SCHOOLS TABLE OF CONTENTS 1.


  1. PROPOSED December 9, 2014 BOND REFERENDUM PRESENTATION 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com

  2. CLAYTON PUBLIC SCHOOLS TABLE OF CONTENTS 1. Clayton MS/HS Projects 2. Simmons Elementary School Projects 3. Cost Summaries 4. Bond Referendum Schedule 10-2-14

  3. CLAYTON PUBLIC SCHOOLS SITE PLAN NEW SIDWALK TO FIELD AREAS EXISTING GREENHOUSE PROPOSED 750 SEAT AUDITORIUM 17,830 S.F. H/C ACCESSIBLE RAMP DOWN TO FIELD AREAS LOADING AREA EXISTING SITE PARKING 240 SPACES PROPOSED ADDITIONAL PARKING (2) H/C + 3 SPACES 10-10-14 10-2-14

  4. CLAYTON PUBLIC SCHOOLS AUDITORIUM ADDITION Auditorium Addition 17,830 sq.ft. 10-2-14

  5. CLAYTON PUBLIC SCHOOLS 10-2-14

  6. CLAYTON PUBLIC SCHOOLS CLAYTON MS/HS PARTIAL ROOF REPLACEMENT HATCHED ROOF AREA TO BE REPLACED 74,000 S.F. Roof Plan • Remove the existing EPDM roof system to the structural deck and repair deck as required. • Install new tapered insulation to a 3.5 inch minimum, with new drains, perimeter metal, etc. This will achieve a code compliant system reflecting a ¼” per foot slope as required by the code. 10-2-14

  7. CLAYTON PUBLIC SCHOOLS NEW LIGHTING FIXTURES (2)H/C PARKING SPACES H/C VIEWING LIGHTING FIXTURE DETAIL PLATFORM W/ RAMP NEW SIDWALK TO FIELD AREAS LIGHTING FIXTURE HAUPT FIELD (TYPICAL OF 4) 10-10-14 10-2-14

  8. CLAYTON PUBLIC SCHOOLS COST SUMMARY Actual Debt Clayton MS/HS PROJECT Total Cost Local Share Service Aid MS/HS EPDM Roof Replacement $2,312,500 ($1,490,309) $822,191 74,000 SF x $25.00 plus 25% soft costs Auditorium Addition * $6,129,062 $0 $6,129,062 17,830 SF x $275.00 plus 25% soft costs Technology Infrastructure Upgrades $323,484 ($208,472) $115,012 New Haupt Field Lighting $250,000 $0 $250,000 TOTAL $9,015,046 ($1,698,781) $7,316,265 STATE SHARE 18.8438% 81.1562% Local Share Referendum $7,316,265 SIMMONS ELEMENTARY Actual Debt Total Cost Local Share SCHOOL PROJECT Service Aid Gym Floor Replacement with a Synthetic Flooring System $87,750 ($56,551) $31,199 5,200 SF x $13.50 plus 25% soft costs Technology Infrastructure Upgrades $627,939 ($404,680) $223,259 TOTAL $715,689 ($461,231) $254,458 STATE SHARE 64.4458% 35.5542% Local Share Referendum $254,458 GRAND TOTAL $9,730,735 ($2,160,012) $7,570,723 * State Share Debt Service Aid based on renovations at Architect’s estimate x 64.4458% Note: Auditorium addition is not eligible because of existing Simmons Auditorium. Net Estimated Tax Impact = $95.95 /year per home assessed at $153,952 based on borrowing rate of 3.95%, 25 year term. 10-15-14 10-2-14

  9. CLAYTON PUBLIC SCHOOLS December 9, 2014 Bond Referendum Schedule Responsible Party Architect District School Counsel Bond Other Minimal Critical Event Timing Date ● ● Building Program/Scope -- ● ● Update Enrollment Projections ● ● Schematic Design N/A May 2014 ● ● Update LRFP ● ● PEC Application August 2014 ● Architect submits to NJ DOE N/A September 2014 ● LRFP Revise and Resubmit N/A N/A ● ● ● NJDOE Issues PEC Offer N/A September 2014 NJDOE issues FEC N/A September 2014 ● Board Approves Special Election N/A September 16, 2014 Filing of Supplemental Debt Statement Auditor 60 Days October 10, 2014 ● Co-Muni Clerk, Bd of Elect Notice 60 Days October 10, 2014 ● Publication of Absentee Ballot Notices Clerk 55 days October 15, 2014 ● Certified Proposal Statement to County Clerk 18 Days November 21, 2014 ● Publication and Posting of Notice of Special Board of Elections 10 Days November 29, 2014 Election ● Furnishing of Sample Ballots Clerk 8 Days December 1, 2014 ● Obtain Certification of Grade Level Instruction 1 Day December 8, 2014 Special Election Board of Elections December 9, 2014 10-2-14

  10. CLAYTON PUBLIC SCHOOLS 750 Seat Auditorium 10-2-14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.