pressure zone 3 expansion project update gregory hill
play

Pressure Zone 3 Expansion Project Update - Gregory Hill Pump - PowerPoint PPT Presentation

Pressure Zone 3 Expansion Project Update - Gregory Hill Pump Station & Tanks Westminster City Council Meeting July 10, 2017 Discussion Outline Review the Pressure Zone 3 Project 1. Review Gregory Hill Project 2. Show Renderings 3.


  1. Pressure Zone 3 Expansion Project Update - Gregory Hill Pump Station & Tanks Westminster City Council Meeting July 10, 2017

  2. Discussion Outline Review the Pressure Zone 3 Project 1. Review Gregory Hill Project 2. Show Renderings 3. Discuss Proposed Schedule 4. Questions and Discussion 5.

  3. PZ3 Program Is The Latest Series of System Improvement Projects Correct Large Areas of Long- 1. Standing Low Pressure Zone 3 and Increase Water Storage 2. Expansion Area Connect Existing Storage to 3. More Customers Increase Redundancy to the 4. Existing Pump Stations Replace Aging Infrastructure 5.

  4. The Zone 3 Expansion Scope Includes 7 System Improvements 1. Demo Sunset Ridge Tank 20”BFV 2. 104th Transmission Main 3. 88th Transmission Main 4. Gregory Hill Area Pipelines 5. GH Site PS & Tanks 12”BFV 6. New Elevated Tank 7. Surge Protection Equipment

  5. Improvements Were Based on Extensive Analysis +$500,000 Preliminary Design 1. +40 Hydraulic Model Scenarios 2. Cost-Benefit Analysis 3. Aging Infrastructure Timing 4. Current and Future Demands 5. Project and Cost Phasing 6. Decision Support Matrices of 7. Multiple Non-Monetary Criteria

  6. Analysis Included Many Sites For Tanks and Different Layouts CROWN POINT SCHOOL DMV ELEVATION 5525 (APPROX)

  7. The Gregory Hill Site is Best for the Pump Station and Tanks Pillar of Fire Existing Gregory Hill Tanks & Pump Station Site

  8. The Gregory Hill Site was Selected for Many Reasons – Slide 1 of 2 1. Compatibility with Existing System Existing Ground Storage • Existing Elevated Storage • Existing Pump Stations • Hydraulic Proximity to Transmission Lines • Current and Future Water Demand Distribution • Geographic Diversity & Reliability • 2. Unique Necessary Elevation for Storage Tanks

  9. The Gregory Hill Site was Selected for Many Reasons – Slide 2 of 2 3. Unique Necessary Location for Pump Station Network 4. Existing Site with Adjacent Available Land 5. Northridge & Wandering View Sites Already Have Maximized Storage 6. Highest Score of Ten Non-Monetary Factors 7. Ability to Co-Address Aging Infrastructure 8. Monetary Factors

  10. The Existing Site is Too Small and Must Expand East – Slide 1 of 2

  11. The Existing Site is Too Small and Must Expand East – Slide 2 of 2

  12. Project Includes Many Site Enhancements – Slide 1 of 2

  13. Project Includes Many Site Enhancements – Slide 2 of 2

  14. Views from Newton Street Will Change – Slide 1 of 2

  15. Views from Newton Street Will Change – Slide 2 of 2

  16. The New East Tank Aligns with Newton Street – Slide 1 of 2

  17. The New East Tank Aligns with Newton Street – Slide 2 of 2

  18. Setbacks to Property Line Will Increase - Slide 1 of 2

  19. Setbacks to Property Line Will Increase - Slide 2 of 2

  20. The Gregory Hill Project Is Awaiting Next Steps 1. Bids Solicited - Currently Being Reviewed 2. Options with Neighborhood Input Site Access, Fencing, Landscaping, Other Related Ideas • 3. Target August City Council for Construction Contracts 4. 18-Month Construction

  21. Questions Dan Strietelmeier, Project Manager 303-658-2179 or dstriete@cityofwestminster.us Stephen Grooters, Utilities Engineering Manager 303-658-2194 or sgrooters@cityofwestminster.us

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.