Presentation to demonstrate our collaborative working ethos with the University of Manchester John Goudie Pre-Construction Design Manager Contents Introduction Company Ethos Building on Better Projects to date Project Collaboration Case


slide-1
SLIDE 1

John Goudie

Pre-Construction Design Manager

Presentation to demonstrate our collaborative working ethos with the University of Manchester

slide-2
SLIDE 2

Contents

Introduction

Company Ethos Building on Better

Projects to date Project Collaboration Case Study Schuster Annexe

Design Lead Project Supply Chain Partnership Quality Control Brickwork Element

Other Project Input Questions

slide-3
SLIDE 3

Introduction

Company Ethos

We are a privately-owned contracting and interior fit-out group. Founded in 1852, we are family run and dedicated to leaving a positive legacy in our communities and environment

Building on Better

“Our Building on Better strategy is about getting the best results for our customers by ensuring nothing is taken for granted, no matter how good we think it is, how excellent the project - we can always learn and improve!”

slide-4
SLIDE 4

Introduction

Building on Better

The eight behaviours embedded in our business strategy

slide-5
SLIDE 5

Introduction

Building on Better

The eight behaviours embedded in our business strategy

“Striving to astonish our customers”

slide-6
SLIDE 6

Introduction

Building on Better

The eight behaviours embedded in our business strategy

“Striving to astonish our customers” “Listening, learning and sharing to drive improvement”

slide-7
SLIDE 7

Introduction

Building on Better

The eight behaviours embedded in our business strategy

“Striving to astonish our customers” “Listening, learning and sharing to drive improvement” “Having a can do attitude, even when its hard going”

slide-8
SLIDE 8

Introduction

Building on Better

The eight behaviours embedded in our business strategy

“Striving to astonish our customers” “Listening, learning and sharing to drive improvement” “Having a can do attitude, even when its hard going” “Keeping it real – be genuine and straightforward in your dealings with people”

slide-9
SLIDE 9

Introduction

Building on Better

The eight behaviours embedded in our business strategy

“Striving to astonish our customers” “Listening, learning and sharing to drive improvement” “Having a can do attitude, even when its hard going” “Keeping it real – be genuine and straightforward in your dealings with people” “Leading by example and taking responsibility”

slide-10
SLIDE 10

Introduction

Building on Better

The eight behaviours embedded in our business strategy

“Striving to astonish our customers” “Listening, learning and sharing to drive improvement” “Having a can do attitude, even when its hard going” “Keeping it real – be genuine and straightforward in your dealings with people” “Leading by example and taking responsibility” “Working collaboratively to achieve the best results”

slide-11
SLIDE 11

Introduction

Building on Better

The eight behaviours embedded in our business strategy

“Striving to astonish our customers” “Listening, learning and sharing to drive improvement” “Having a can do attitude, even when its hard going” “Keeping it real – be genuine and straightforward in your dealings with people” “Leading by example and taking responsibility” “Working collaboratively to achieve the best results” “Recognising and respecting others”

slide-12
SLIDE 12

Introduction

Building on Better

The eight behaviours embedded in our business strategy

“Striving to astonish our customers” “Listening, learning and sharing to drive improvement” “Having a can do attitude, even when its hard going” “Keeping it real – be genuine and straightforward in your dealings with people” “Leading by example and taking responsibility” “Working collaboratively to achieve the best results” “Recognising and respecting others” “Working as one team”

slide-13
SLIDE 13

Projects to Date

Complete Schuster Annexe (Scape) On Site Student Union (Framework) Chemistry Phase 1 (Scape) Brunswick Park (Scape) Tendering Chemistry Phase 2 Museum Courtyard Jodrell Bank Visitors Centre

slide-14
SLIDE 14

Project Collaboration Case Study

Schuster Annexe

For the department of physics and astronomy

slide-15
SLIDE 15

Design Lead Project

Maintained design consistency from picking the scheme up as a priced RIBA stage 4 technical design and worked with the design team to realise necessary savings bring the project to site. The design, functionality and aesthetics were key to the success of this scheme and these we maintained throughout the process. The annexe to act as seamless link bridging old and new. It is the heart of the new ideas mill. The ground floor is a flexible space to encourage new projects, approaches to learning and teaching and cross-disciplinary collaboration.

slide-16
SLIDE 16

QUALITY MATTERS

slide-17
SLIDE 17

Supply Chain Partnerships

Our dedicated supply chain partners are willing to offer buildability advice at any stage of the design process which is fundamental in ensuring a scheme is We honour this commitment by targeting 70% local supply chain spend ensuring customer capital expenditure is re-invested locally to benefit the local economy We collaborated with UoM’s Construction Academy and Aspire to encourage local employment

slide-18
SLIDE 18

One major element of change required to achieve budgetary savings was to chain the Omnia pre-cast floor planks originally designed to a pre-cast solution. This brought programme and capital cost

  • savings. The support this change we
  • Viewed several projects where

concrete planks had been installed across campus, to ensure consistency and suggest improvements, to capture and respond to customers concerns

  • Quality and inspection visit to factory

Quality Control Embedded in our Supply Chain Ethos

slide-19
SLIDE 19

Brickwork

One key deliverable on the scheme which certainly caused the most concern initially was the brickwork facade. The architect had a clear vision for the element and bringing our expertise, together with valued input during a series of workshops from our supply chain members made the vision achievable, these were prior to being awarded a contract. These included:

slide-20
SLIDE 20

Recessed Flemish bond brickwork with protruding headers Protruding glazing Protruding frames Flush glazing Innovation- Craft, design & materials

Brickwork – Concept

slide-21
SLIDE 21

Brickwork

Bricklayers

One key deliverable on the scheme which certainly caused the most concern initially was the brickwork facade. The architect had a clear vision for the element and bringing our expertise, together with valued input during a series of workshops from our supply chain members made the vision achievable, these were prior to being awarded a contract. These included:

slide-22
SLIDE 22

Brickwork

Bricklayers Curtain Walling Specialists

One key deliverable on the scheme which certainly caused the most concern initially was the brickwork facade. The architect had a clear vision for the element and bringing our expertise, together with valued input during a series of workshops from our supply chain members made the vision achievable, these were prior to being awarded a contract. These included:

slide-23
SLIDE 23

Brickwork

Bricklayers Curtain Walling Specialists Masonry Support

One key deliverable on the scheme which certainly caused the most concern initially was the brickwork facade. The architect had a clear vision for the element and bringing our expertise, together with valued input during a series of workshops from our supply chain members made the vision achievable, these were prior to being awarded a contract. These included:

slide-24
SLIDE 24

Brickwork

Bricklayers Curtain Walling Specialists Masonry Support SFS Specialists

One key deliverable on the scheme which certainly caused the most concern initially was the brickwork facade. The architect had a clear vision for the element and bringing our expertise, together with valued input during a series of workshops from our supply chain members made the vision achievable, these were prior to being awarded a contract. These included:

slide-25
SLIDE 25

Brickwork

Bricklayers Curtain Walling Specialists Masonry Support SFS Specialists Cladding Specialists

One key deliverable on the scheme which certainly caused the most concern initially was the brickwork facade. The architect had a clear vision for the element and bringing our expertise, together with valued input during a series of workshops from our supply chain members made the vision achievable, these were prior to being awarded a contract. These included:

slide-26
SLIDE 26

Brickwork

Bricklayers Curtain Walling Specialists Masonry Support SFS Specialists Cladding Specialists Brick Manufacturers

One key deliverable on the scheme which certainly caused the most concern initially was the brickwork facade. The architect had a clear vision for the element and bringing our expertise, together with valued input during a series of workshops from our supply chain members made the vision achievable, these were prior to being awarded a contract. These included:

slide-27
SLIDE 27

One key deliverable on the scheme which certainly caused the most concern initially was the brickwork facade. The architect had a clear vision for the element and bringing our expertise, together with valued input during a series of workshops from our supply chain members made the vision achievable, these were prior to being awarded a contract. These included:

Brickwork

Bricklayers Curtain Walling Specialists Masonry Support SFS Specialists Cladding Specialists Brick Manufacturers Building Control

slide-28
SLIDE 28

Brickwork - Result

The end result of collaborative workshops, sample panels, numerous design team workshops and focus groups, resulted in a product that was buildable and maintained all the original characteristics important to the concept vision the architects held dearly and is a product we are all extremely proud of.

slide-29
SLIDE 29

Brickwork - Result

The end result of collaborative workshops, sample panels, numerous design team workshops and focus groups, resulted in a product that was buildable and maintained all the original characteristics important to the concept vision the architects held dearly and is a product we are all extremely proud of.

slide-30
SLIDE 30

Brickwork - Result

The end result of collaborative workshops, sample panels, numerous design team workshops and focus groups, resulted in a product that was buildable and maintained all the original characteristics important to the concept vision the architects held dearly and is a product we are all extremely proud of.

slide-31
SLIDE 31

Health & Safety

  • Live campus
  • Site is close to a main highway
  • High levels of pedestrian traffic
  • Adjacent to the City’s Major Hospitals
  • No major incidents
  • Fire routes through compound and

building maintained throughout

  • BREEAM built to be considerate of the

health and well being of those using the building

slide-32
SLIDE 32

Sc Schu huster ster An Anne nexe xe

Project of the Year Nominee 2018

slide-33
SLIDE 33

CONSTRUCTION NEWS AWARDS

Project of the Year 3 May 2018

slide-34
SLIDE 34

Other Project Input

On Site Student Union (Framework)

– JCT Traditional contract, I was brought in to assist in design related issues to push the build programme forward

Tendering Museum Courtyard

Attended and inputted into 4 design team consortium meetings to date assisting the customer design team with advice ad guidance prior to tendering

slide-35
SLIDE 35

Questions?