Stats:
- Total student population:
1,600
- 68% reduced/free lunch
status
- 40% minority
- LHS is one of the smallest
and most successful International Baccalaureate schools
- 1957 Gym converted into a
new state of the art Fine Arts Center
PAGE LAYOUT
Latta Elementary is 100% Montessori
PRESENTATION TITLE
The Challenges
- Needed EMS in uncontrolled
facilities
- Needed to replace a problematic,
unsupported EMS system in a new facility
- Needed to reduce energy costs
- Needed new HVAC & Lighting
- No Budget
- How can we make this
happen?
PRESENTATION TITLE
The Solutions
- Start with an energy audit
Utility payed 50%
- Develop a Project List that would
lower the payback
- Get Funding!
ConserFund Plus Utility Incentives (Over $60,000)
PRESENTATION TITLE
What made this a good project?
- Clear Goals
- Willingness to try new things
- District completed most of the
work in-house
PAGE LAYOUT
Building Summary
PAGE LAYOUT
HVAC Summary
PAGE LAYOUT
WMHPs are very common in the middle school
HVAC Summary
PAGE LAYOUT
Set Point too low and in manual “hold” Set Point too low and in manual “hold” Manual “hold” “Emergency Heat” selected There are often many issues when thermostats are accessible. These are just a few of the
- findings. A total of 15 were found with some
- issue. Many thermostats were in “hold” meaning
the HVAC system never turns off. Some had the fans in manual causing them to stay on, emergency heat selected (uses 3 times the energy of a heat pump!), and set points that were
- utside the typical ASHRAE recommended band.
An EMS could rectify all these problems.
HVAC Findings
PAGE LAYOUT
Heat Mode Cool Mode Simultaneous Heating and Cooling in the same space! There are 4 3-ton heat pump units for the band room. One thermostat is in the band director’s office with the door closed and is in cool mode. The other is out in the main practice space and is in heat mode. The thermostat should probably be moved out of the
- ffice and these interlocked to prevent this from happening. An EMS could easily address this issue.
HVAC Findings
PAGE LAYOUT
59% of all the fluorescent lighting at LMS is still T12, mostly the older section of the building (classrooms) and the hallways. The dance studio and facilities shed are also T12. LHS has T12 in the robotics and agriculture building.
Lighting Opportunities
PAGE LAYOUT
Kitchen T12 lighting is still being used in all the hallways and the older section of the building (all areas within the red outlined rectangles).
Lighting Opportunities
PAGE LAYOUT
All the T12 lighting in the middle school, with the exception of the kitchen, is 4-bulb. Not only is this very poor (and quickly becoming
- bsolete) lighting, it is far too many bulbs for the hallway applications (they can typically be 2 bulb fixtures).
Lighting Opportunities
PAGE LAYOUT
The metal halide lighting in the gym offers an excellent opportunity for an LED upgrade. The 150w “UFO” fixture would be a good upgrade, requiring no guarding, because of its rugged construction.
Lighting Opportunities
PAGE LAYOUT
Fixture Location Quantity Wattage Operating Hours Operating Days Annual Hours Total kWh
Offices, breakroom 26 112 9.5 255 2,423 7,054 Small Conference room 3 112 4 255 1,020 343 Large Conference room, kitchen 15 112 1.5 200 300 504
T8 3‐bulb
Bathrooms 2 89 9.5 255 2,423 431
T8‐2‐bulb
Offices, hallways, copy area 32 59
9.5
255 2,423 4,574
12,906 Fixture Location Quantity Wattage Annual hours Total kWh Rebate per fixture Cost per fixture Labor Net Cost per fixture
Offices, breakroom 26 48 2,423 3,023 $50 $67.36 $0 $17 Small Conference room 3 48 1,020 147 $0 $67.36 $0 $67 Large Conference room, kitchen 15 48 300 216 $0 $67.36 $0 $67
T8 LED 3‐tube
Bathrooms 2 36 2,423 174 $38 $50.52 $0 $13
T8 LED 2‐tube
Offices, hallways, copy area 32 24 2,423 1,860 $25 $33.68 $0 $8
Total 5,421 $2,184 $4,143 $0 Fixture Location kWh Dollars
Offices, breakroom 4,031 $352 $451 Small Conference room 196 $17 $202 Large Conference room, kitchen 288 $25 $1,010
T8 LED 3‐tube
Bathrooms 257 $22 $25
T8 LED 2‐tube
Offices, hallways, copy area 2,713 $237 $269
7,485 $653 $1,959 Combined Payback (in years) 3.00 Combined ROI 33%
Total avg $/kWh $0.0872 Total T8 Tube Count 246 Total Possible Rebate $2,184
88%
Total Investment (minus rebate) $1,959
Totals
Savings Investment Payback (years) ROI
T8 LED 4‐tube
1.28 78% 11.83 8% 40.23 2% 1.13 89% 1.14
T8 LED 4‐tube
Latta Admin Bldg Interior LED lighting Upgrade (IH)
Existing Fixtures Operating Cost
T8 4‐bulb
$615 $30 $44 $38 $399
Total $1,125 Proposed new fixtures
PAGE LAYOUT
Type Qty
UFO 150w 30 Wall Pack 46 T8 12w 2,730 T8 12w dimming 2,238 T8 18w 141 T5 57 Shoe Box Retro Kits 39 Ubend 2
Total LED Quantities
PAGE LAYOUT
EC motors are very efficient (50% less wattage than a typical shaded pole motor) and can offer multiple speeds Controls the speed of the 2 speed EC motors to slow down to minimum possible speed when the compressor is not running. Compressor only operates about 40% of the time, the other 60% the Frigitek controller can operate the EC motor at a much slower speed, reducing energy consumption by as much as 90%.
EC Motors
PAGE LAYOUT
The cafeteria dishwasher is no longer used. The HW load has decreased substantially, and there is a large NG water heater with a recirc pump. There is
- ne sanitizing sink in use. A condensing tankless commercial system would
be a strong choice for this application.
Tankless Water Heater
41% reduction in NG usage!
PAGE LAYOUT
3ton HPs 4-6ton NG 3ton HPs 5ton HP 5ton HP 5ton HP 5ton HP 5ton HP 18ton NG 20ton NG MAU 5ton HP 5ton HP
ARC Controllers
PAGE LAYOUT
LMS Kitchen Meter LMS Nurses Station Meter LHS Original Meter E = Electric Meter Locations = Switch Gear or MDP E E E E
X
= NG meter locations
X X X
LHS Gym Meter
SECTION TITLE
What this Section Is About
Power Monitoring
SECTION TITLE
What this Section Is About
SECTION TITLE
What this Section Is About Rebate Tracker
DLC Old EPAC Old Gym Custom Prescriptive 1 EC motors x x x N/A websit e 2 4Ton & 7.5Ton ARC controllers x x x N/A x 3 7.5Ton ARC controllers x x 0000128789 x x $1,048 x x N/A x 3/4/19 4 20Ton ARC controllers x x x N/A x 5 18T ALC controllers x 0000128392 x x $5,460 x x N/A x 2/26/19 6 T5 Lighting (library,Entry) x x 0000123893 x x 10/26/17 $461 $461 x x x x x x 3/23/18 7 T5 Lighting (library) x x 0000122781 x x 10/26/17 $285 $285 x x x x x x 3/23/18 8 LES tubes x x PSS17-0000140648 x x 12/4/17 $14,940 $14,940 x x x x x x 12/29/17 9 LES Parking Lot PSS18-0000147463 x x 2/6/18 $1,950 x x x x 4/4/18 10 LES Wall Packs PSS18-0000144299 x x 2/6/18 $2,150 $2,150 x x x x 3/1/18 11 LES remaining x x PSS18-0000151418 x x 4/15/18 $274 $274 x x X x x x 4/25/18 12 Admin Lighting x x PSS17-0000140655 x x 12/4/17 $1,476 $1,476 x x x x x x 12/29/17 13 LMS Lighting x x PSS18-0000143323 x x 1/12/18 $4,932 $4,932 x x x x x x 2/13/18 14 LMS Remaining lighting x x x PSS18-0000150306 x x 3/20/18 $708 $708 x x x x x x 4/3/18 15 LHS Lighting (Acct #5810590512) x x x PSS17-0000141943 x x 12/20/17 $10,956 $10,956 x x x x x x 1/11/18 16 LHS remaining lighting x x PSS18-0000150238 x x 3/17/18 $2,094 $2,094 x x x x x x 4/11/18 17 LHS Gym and Wall Pack Lighting (Acct #6446373026) x x PSS18-0000143324 x x 1/12/18 $6,968 $6,968 x x x x x 2/13/18 18 Vending Misers x x x x x N/A $47,194
$51,752
LMS Paid Out (Mailed) LHS Elem Admin Rebate Type **Rebate Form Sign Submitted Date Rebate Form **Proposal Quote Predicted Amount Totals *Note: Custom material cannot be ordered until the rebate is approved. **Note: Signature and quote typically occur after the work is complete for a prescriptive rebate. *Mat'l Ordered Spec sheet Present Duke Offer Amt. Mat'l Recv'd Project Custom CSS# Prescriptive # Location
Green means the rebate has been dispursed to Latta
SECTION TITLE
What this Section Is About
PAGE LAYOUT
Outcome New EMS control in 3 schools Total LED upgrade of all school buildings, the administration building and the elementary school parking lot and entrance road Upgrade to a commercial high temp tankless water heater for the kitchen, eliminating the large tank system Installation of Advanced Rooftop Controllers on selected RTUs Installation of 37 new high efficiency wall mounted heat pumps Install EC motors and controller on walk-in cooler/freezer Install Vending Misers
Cost reduction of $33,595 (14.68%) kWh reduction of 425,540 (21.25%)
Opportunity
1. Tighten the operating schedule and control strategies at EPAC 2. Institute more aggressive temperature set points, especially non-occupied (both schools) 3. Debulb LMS 4 bulb T12 Hallway fixtures and upgrade to LED 4. Upgrade LHS gym fixtures to LED 5. Install Vending Misers (both schools) 6. Upgrade LMS T8/T12 fluorescent bulbs to LED 7. Upgrade LHS T8 fluorescent bulbs to LED 8. Install synchronous belts on larger horspower motors (Gym RTUs) 9. Upgrade all T5 fixtures to LED 10. Install NG tankless water heater to replace kitchen tank heater and eliminate recirc pump 11. Install LED lighting in LES 12. Install ARC on 2 EPAC RTUs (4 and 7.5 ton) w/ OA 13. Install EC Motors in Walk-Ins 14. Install ARC on LMS library HP RTU (no OA) 15. Install LED lighting in Admin Bldg 16. Install LED Parking Lot Lighting in LES 17. Install ARC on 20Ton LHS NG RTUs w/ OA 18. Install ARC on 18Ton LHS RTUs (no OA) 19. Install Evaporator EC controller on Walk-ins 20. Install one 4ton 1ph WMHP to replace 5 ton WMHP 21. Install fourteen 2.5ton 1phase WMHPs to replace 3ton WMHP in LMS 22. Install two 2.5ton 1ph WMHPs in LHS 23. Install fourteen 2.5ton 3phase heat pumps to replace 3 ton units in LHS 24. Complete Install of EMS in LHS and implement control strategies 25. Complete Install of EMS in LMS and implement control strategies 26. Install six 2.5ton (five 3ph, one 1ph) WMHPs in LHS 27. Elementary School EMS install