Prescott Park Master Plan City of Portsmouth Weston & Sampsons Design Studio Gene Bolinger, RLA Cheri Ruane, RLA Prescott Park Master Plan DESIGN STUDIO January 11, 2017 Timeline Phases Spring / Summer Site Analysis Project


slide-1
SLIDE 1

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Prescott Park Master Plan

Weston & Sampson’s Design Studio

Gene Bolinger, RLA Cheri Ruane, RLA

City of Portsmouth

slide-2
SLIDE 2

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Phases

  • Site Analysis
  • Public Input & Participation
  • Conceptual Design
  • Master Plan & Facilities Plan

Timeline

  • Spring / Summer
  • Project Duration
  • Summer
  • Fall / Winter

January 2017 April August WE ARE HERE!

slide-3
SLIDE 3

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

The Master Plan | What it Means?

What it represents | What it doesn’t represent And what happens next

slide-4
SLIDE 4

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

1. Recognition of City‐owned nature of the park 2. Use “for park and recreational purposes” per the trust 3. Pedestrian through‐route accessibility at all times 4. Maximize waterfront connection 5. Integrate coastal resilience/adaptation strategies 6. Maintain and enhance maritime historical connection 7. Integrate into the neighborhood 8. Ensure presence for theater, dance, music and visual arts (including public art) 9. Maintain different areas for a variety of park experiences 10. Plan for gatherings (informal and formal) 11. Maintain a Public Forum area 12. Include meaningful invitations for youth to play Design Tenets

slide-5
SLIDE 5

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

The Park First Approach

  • A waterfront park for the people of Portsmouth
slide-6
SLIDE 6

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

  • A venue for all arts
slide-7
SLIDE 7

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

  • Front line defense to the impacts of climate change
slide-8
SLIDE 8

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Concept 3 – Water Connections

  • Rethinks the park/water interface
  • Expands circulation beyond current

park limits and creates new

  • pportunities
  • Widens Prescott Pier for extension
  • f parkland
  • Knits site together through new

plaza spaces

  • Relocates stage + Hovey Fountain
slide-9
SLIDE 9

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Prescott Park Master Plan

slide-10
SLIDE 10

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Prescott Park

slide-11
SLIDE 11

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Four Tree Island

slide-12
SLIDE 12

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Park Entrance at Marcy Street & State Street

slide-13
SLIDE 13

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Park Entrance at Marcy Street & State Street

slide-14
SLIDE 14

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Public Art & Play

slide-15
SLIDE 15

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Formal Garden

slide-16
SLIDE 16

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Formal Garden

slide-17
SLIDE 17

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Formal Garden

slide-18
SLIDE 18

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Formal Garden

slide-19
SLIDE 19

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Hovey Fountain Entrance on Marcy Street

slide-20
SLIDE 20

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Original Hovey Fountain at Post Office

slide-21
SLIDE 21

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Hovey Fountain Entrance on Marcy Street

slide-22
SLIDE 22

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Hovey Fountain Entrance on Marcy Street

slide-23
SLIDE 23

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Liberty Pole Entrance

slide-24
SLIDE 24

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Liberty Pole Entrance

slide-25
SLIDE 25

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Display Gardens (Former Trial Gardens)

slide-26
SLIDE 26

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Display Gardens (Former Trial Gardens)

slide-27
SLIDE 27

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Waterfront

slide-28
SLIDE 28

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Waterfront

slide-29
SLIDE 29

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Public Forum

slide-30
SLIDE 30

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Hudson River Park + Piers

slide-31
SLIDE 31

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

The Bowl

slide-32
SLIDE 32

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

A Seasonal Use Stage Facility

slide-33
SLIDE 33

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Current Stage and Lawn Conditions

slide-34
SLIDE 34

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Informal Use of The Bowl

slide-35
SLIDE 35

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Theater Performance

slide-36
SLIDE 36

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

A Moveable Stage Facility for Seasonal Use

slide-37
SLIDE 37

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

A Movable Stage Facility for Seasonal Use

  • The Shaw Warehouse would be renovated and

reconfigured to accommodate uses currently in trailers

  • The stage design process includes site‐specific

structural and environmental considerations

  • Professional companies will store, set up,

inspect, take down and transport the stage facility

  • Movable stages comply with the full building

code and are inspected by city officials

  • Movable stages are as safe as permanent

structures when designed, installed and operated properly

slide-38
SLIDE 38

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

A Movable Stage Facility for Seasonal Use

  • Earth anchors would be built into the park to provide

ballast for the movable stage.

  • The design of the stage would take into consideration

the possibility of a cover over the performance area.

  • A seasonal tent would be integrated to cover the back

stage marshalling area

slide-39
SLIDE 39

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Park Usage & Capacity Diagrams

1 2 3 4 5 6 7 8 9

1. Public Forum 2. Formal Garden 3. Hovey Fountain 4. The Bowl 5. Players Ring Lawn 6. South Pier 7. The Oval 8. Display Gardens 9. Plein Air Garden

  • 10. Four Tree Island

10

slide-40
SLIDE 40

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Hovey Garden, The Bowl & Players Ring Lawn

Hovey Garden 5,500 SF 50 person capacity The Bowl 32,000 SF 1,200 person capacity Players Ring Lawn 2,700 SF 100 person capacity Yoga

slide-41
SLIDE 41

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Cost / Phasing of Park Improvements

  • Costs will be significant (whatever plan is adopted)
  • Capital investments have been delayed until a

comprehensive plan is in place

  • Infrastructure needs are great
slide-42
SLIDE 42

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Cost / Phasing of Park Improvements

slide-43
SLIDE 43

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Cost / Phasing of Park Improvements

PHASE 1 Grand Entrance $ 3,250,000 2 The Bowl $ 1,400,000 3 North Waterfront $ 2,350,000 4 The Oval $ 2,100,000 5 Four Tree Island $ 1,250,000 6 South Waterfront $ 1,800,000 Boardwalk $ 1,000,000 Four Tree Island Ped Link $ 900,000 TOTAL $14,050,000

OPINION OF CONSTRUCTION COST

slide-44
SLIDE 44

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

$3.25 $1.40 $2.35 $1.80 $1.00 $2.10 $ .90 $1.25

Cost / Phasing of Park Improvements

slide-45
SLIDE 45

Prescott Park Master Plan January 11, 2017 DESIGN STUDIO

Cost / Phasing of Park Improvements

Total Potential Renovation Cost Averages about $30/sf Prescott Park Proper + Boardwalk: $11,900,000 Four Tree Island + Pedestrian Link: $2,150,000 Design + Permitting (15% of construction): $2,000,000