practical exercise group c
play

Practical Exercise Group C Speaker: Mr. A. Hernandez Maldonado - PDF document

Practical Exercise Group C Speaker: Mr. A. Hernandez Maldonado Members: L. S. Leopando O. Abulgasem (Answerer) I. Muhamad K. Huda L. Vinh Moderator: Mr. I. Lund Technical Meeting Legal and Regulatory Aspects of Decommissioning Research


  1. Practical Exercise Group C Speaker: Mr. A. Hernandez Maldonado Members: L. S. Leopando O. Abulgasem (Answerer) I. Muhamad K. Huda L. Vinh Moderator: Mr. I. Lund Technical Meeting Legal and Regulatory Aspects of Decommissioning Research Reactor Decommissioning Demonstration Project (R2D2P) 26 - 30 June 2006, Manila, Philippines International Atomic Energy Agency Regulatory Issues Solutions Solutions Regulatory Issues RB shall provide the following: • Set of Rules and Regulations • Basic Safety Standard (Legislative Doc) Required by • National Guidelines on the RB to support the Decommissioning of RR Decommissioning Process • Waste and Disposal Management Regulations • Transport Regulations (exist) • Radiation Protection Regulations (exist) • Environmental Quality Act (exist) • Occupational Health and Safety Regulations (?) Note : In case of the Legal Framework is not in place, the State may adopt from International Standards issued by IAEA and/or other sources. International Atomic Energy Agency 1

  2. RB Requirement for Licensing RB Requirement for Licensing Fuel Removal Authorization Waste Storage Decommissioning License (from site) • Decommissioning Plan Plan for Constructing a fuel Site storage building • Decommissioning QA & Procedures Transportation procedures Management Monitoring plan • Decommission Method / Criticality calculation Type and Capacity Strategy Safety & Security Facility layout and access • Quality Assurance Potential hazards • Financial Assurance Waste characterization • Waste Management Safety, Security &Safeguards • Responsibilities of Various Engineering structure Parties: Operator, Contractor, Other relevant parties. • Estimation of : • Time • Dose • Cost • Future plan of the Site International Atomic Energy Agency Solution for Licensing issues Solution for Licensing issues Fuel Removal Waste Storage Decommissioning Authorization License (from site) The RB shall provide : The RB shall provide : The RB shall provide : Set of licensing guidance Set of licensing guidance Set of licensing guidance and procedures for and procedures for and procedures for review; review; review; Competent personnel for Competent personnel for Competent personnel for reviewing the application; reviewing the application; reviewing the application; Acceptance criteria for Acceptance criteria for Acceptance criteria for fuel transportation waste storage license decommissioning license. (containers) and storage (licensing conditions, if (licensing conditions, if authorization any) any) (licensing conditions, if any) International Atomic Energy Agency 2

  3. Regulatory Issues Regulatory Issues Solutions Solutions Licensing/Authorization The RB issues licenses for The RB shall provide: Decommissioning • Set of licensing guidance and procedures ; • Competent personnel for reviewing the application; • Training for the personnel International Atomic Energy Agency Regulatory Issues Regulatory Issues Solutions Solutions Inspection/ Enforcement The RB conducts inspection The RB shall provide : and enforcement • Set of inspection/enforcement guidelines and procedures • Inspection plan and records • Competent inspectors • Training for the inspectors • Financial resources International Atomic Energy Agency 3

  4. Regulatory Issues Regulatory Issues Solutions Solutions Release from control The RB shall provide : The RB declare that the site is released from regulatory control Set of guidelines and • procedures for review the decommissioning and final survey report • Independent verification • Competent personnel • Acceptance criteria for site release International Atomic Energy Agency Prioritization Prioritization 1. Set of regulation and rules 2. Qualified, trained and experienced personnel (needed for all stages) 3. Acceptance criteria: a) Characterization b) Clearance Level c) Site release 4. Licensing of decommissioning 5. Site release International Atomic Energy Agency 4

  5. References References • IAEA Technical Report Series No. 351, Planning and management for the decommissioning of RR and other small nuclear facilities. • IAEA Safety Guides No. WS-G-2.1, Decommissioning of nuclear power plant and research reactor. • IAEA Safety Guides No. RS-G-1.1, Occupational radiation protection. • IAEA Technical Report Series No. 373, Decommissioning Techniques for research reactors. • IAEA Technical Report Series No. 411, Record keeping for the decommissioning of nuclear facilities: Guidelines and experiences. • IAEA TECDOC No. 1394, Planning, managing and organising the decommissioning of nuclear facilities: Lessons learned. • IAEA Safety Series No. 111-F, The principles of radwaste management. • IAEA Safety requirement WS-R-2, Predesposal management of radioactive waste including decommissioning. • IAEA Safety Series No. 111-G-1.1, Classification of radioactive waste. International Atomic Energy Agency Not Considered Factors Not Considered Factors • Funding • Future use of the site • Time for completion • Public information International Atomic Energy Agency 5

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.