Planning for Office Land in Hong Kong Planning for Office Land in - - PowerPoint PPT Presentation

planning for office land in hong kong planning for office
SMART_READER_LITE
LIVE PREVIEW

Planning for Office Land in Hong Kong Planning for Office Land in - - PowerPoint PPT Presentation

Seminar on Office Development in Hong Kong Seminar on Office Development in Hong Kong Planning for Office Land in Hong Kong Planning for Office Land in Hong Kong Mr. Jimm y C.F. Leung , Director of Planning Mr. Jim my C.F. Leung , Director of


slide-1
SLIDE 1
  • Mr. Jim
  • Mr. Jimm

1 1

Seminar on Office Development in Hong Kong Seminar on Office Development in Hong Kong

Planning for Office Land in Hong Kong Planning for Office Land in Hong Kong

my C.F. Leung , Director of Planning y C.F. Leung , Director of Planning 12 March 2011 12 March 2011

slide-2
SLIDE 2

2

Outline of Presentation Outline of Presentation

Introduction Office Development Strategy under HK2030 Study Case Study : Kowloon East Office Node Potential of office nodes in the New Territories? Concluding remarks

slide-3
SLIDE 3

HK as a Global City

World city network: the Globalization and World Cities Research Network ( in 2000, 2004 and 2008) : HK ranked 3rd, trailing after New York and London “Global Financial Centres Index” in 2010 : HK joined London & New York as a genuinely global financial centre HK as a strategic base for MNCs

3

slide-4
SLIDE 4

Regional HQs & Offices in HK

Strong presence of RHQ & RO : up from 2,514 in 1997 to 3,638 in 2010 (+45%) 74% of the head/sole offices of RHQ & RO are in office buildings:

4

estimated GFA of 1.6 million m2 (11% of total office stock), comprising 1.4 million m2 in Grade A

  • ffices (15% of total)

57% in Central & Western, Wan Chai & Yau Tsim Mong; 22% in Kwun Tong & Eastern

Provisional figures for 2010.

slide-5
SLIDE 5

Dominance but declining share of CBD Stock

All Office Stock All Office Stock

5

CBD stock up from 8.23M sq m GFA to 8.35M in the past decade (+ 1.5%) But share down from 68% to 59%

Notes: CBD here includes Sheung Wan, Central, Wanchai/Causeway Bay and TST . There may be slight discrepancy in figures due to rounding. Provisional figures for 2010.

slide-6
SLIDE 6

Grade A Office Stock Grade A Office Stock

6

Dominance but declining share of CBD Stock

CBD Grade A stock up from 4.5M sq m GFA to 4.76M in the past decade (+ 5.7%) But share down from 66% to 53%

Notes: CBD here includes Sheung Wan, Central, Wanchai/Causeway Bay and TST. There may be slight discrepancy in figures due to rounding. Provisional figures for 2010.

slide-7
SLIDE 7

7

Office Development Strategy Office Development Strategy

slide-8
SLIDE 8

8

Recommended Office Development Strategy under HK2030 Study

Importance of ensuring adequate and steady supply of CBD Grade A Offices the high value-added financial and business services sector is more tied to the CBD

Note: Figures were compiled based on responses with “GFA” reported, representing about 89 % of the total number of RHQs and ROs Some RHQs and ROs may report more than one major line of business in HK. Some of the GFA may not be in office buildings.

Overall: 275, 000m2 Overall: 327, 000m2 Overall: 876, 000m2

GFA taken up by head/sole offices of RHQ & RO in HK by Major Line of Business (2010) GFA taken up by head/sole offices of RHQ & RO in HK by Major Line of Business (2010)

slide-9
SLIDE 9

Recommended Office Development Strategy under HK2030 Study

Recommended strategy : further consolidating our CBD; relocating government accommodation not requiring prime location away from CBD; and developing new office nodes outside CBD

9

slide-10
SLIDE 10

Further Consolidating the CBD

To make available sites through redevelopment To make available sites through redevelopment

10

Wanchai Police Married Quarters CGO West Wing

slide-11
SLIDE 11

Further Consolidating the CBD

To strive for early delivery of new sites To strive for early delivery of new sites

11

Proposed Office Sites at the New Central Harbourfront

slide-12
SLIDE 12

Further Consolidating the CBD

To redevelop government multi-car parking sites and bus terminus To redevelop government multi-car parking sites and bus terminus

12

Murray Road Carpark Rumsey Street Carpark Bus Terminus adjacent to Shun Tak Centre

slide-13
SLIDE 13

Relocating Government Accommodation from CBD

Freeing up space not requiring a prime location Freeing up space not requiring a prime location

Wanchai Government Offices Compound Wanchai Government Offices Compound

13

slide-14
SLIDE 14

Quarry Bay Kowloon East Kai Tak West Kowloon

To meet office demand and facilitate a filtering process To meet office demand and facilitate a filtering process

Develop Office Nodes outside CBD

14

Wong Chuk Hang

CBD

slide-15
SLIDE 15

The Transforming Wong Chuk Hang The Transforming Wong Chuk Hang

15

slide-16
SLIDE 16

New / Potential Office / Commercial Developm 新 / 可能的寫字樓 / 商業樓宇發展 ent

4

WIP 建築中

Potential Office Node in Wong Chuk Hang in the Longer Term

  • 45 industrial buildings zoned “OU(B)” (8.3 ha)
  • tourist & amenity attractions nearby
  • South Island Line (East) scheduled for

completion in 2015

可能的

slide-17
SLIDE 17

Wong Chuk Hang at an early stage of transformation

L’hotel New Quality Office Building

17

SIL (East)

slide-18
SLIDE 18

West Kowloon Office Node

GZ-SZ-HK Express Rail Link Terminus West Kowloon Cultural District

18

ICC

Potential office : about 0.6 million m2 GFA Appeal to companies with strong business ties with the Mainland Potential office : about 0.6 million m2 GFA Appeal to companies with strong business ties with the Mainland

slide-19
SLIDE 19

19

Kai Tak Office Node Kai Tak Office Node

14.4 ha of land planned for business/commercial developments : max non- domestic GFA of 0.7mil m2 14.4 ha of land planned for business/commercial developments : max non- domestic GFA of 0.7mil m2

Kai Tak Station Kai Tak Station Kai Tak Gov’t Offices Kai Tak Gov’t Offices

slide-20
SLIDE 20

Kai Tak Office Node

Comprehensively planned with a range of supporting and regional facilities

20

slide-21
SLIDE 21

Kai Tak Office Node Kowloon Bay Office Node Kwun Tong Office Node

Synergy between Office Nodes in Kai Tak and Kowloon East

Total existing and planned Grade A office GFA exceeding 2 mil m2 Total existing and planned Grade A office GFA exceeding 2 mil m2

21

slide-22
SLIDE 22

The Kowloon East Office Node The Kowloon East Office Node

22

slide-23
SLIDE 23

“OU (Business)” zone (68 ha) introduced in 2001 facilitates transformation “OU (Business)” zone (68 ha) introduced in 2001 facilitates transformation

The Kowloon East Office Node

23

Existing office stock : 1.4 mil m2 GFA (incl. 1.3 mil Grade A stock) Existing office stock : 1.4 mil m2 GFA (incl. 1.3 mil Grade A stock) 6 sale sites for commercial/ business uses: site area : about 3 ha estimated GFA : 0.35 mil m2 6 sale sites for commercial/ business uses: site area : about 3 ha estimated GFA : 0.35 mil m2

Government-initiated Sale Sites

Existing industrial buildings : 286 Existing industrial buildings : 286

slide-24
SLIDE 24

0.85 million 0.95 million

Kowloon East being a Major Source of New Grade A Stock

24

37% of new completion in the last decade came from Kln East, 18% from traditional office districts 37% of new completion in the last decade came from Kln East, 18% from traditional office districts

Kln East

Provisional figures for 2010

slide-25
SLIDE 25

Kowloon East ranks Second after Central in terms of Grade A Stock

25

2.15 million 1.35 million

Overall Grade A Central KLN East WanChai/Causeway Bay TST North Point/Quarry Bay 3,000 2,500 2,000 1,500 1,000 500

Provisional figures for 2010

slide-26
SLIDE 26

Survey on Business Establishments in Kowloon East

Fieldwork of questionnaire survey : Nov – Dec 2010 Sample size : All establishments in office buildings in Kln Bay & Kwun Tong : 2127 Successfully enumerated cases : 1262 Response rate : 60%

26

slide-27
SLIDE 27

Office Occupiers in KLN East by Industry Types

27

Provisional findings

About 50% in “I/E trades, wholesale & retail”, followed by “Banking, finance and insurance” (9.5%) and “Manufacturing” (9%) About 50% in “I/E trades, wholesale & retail”, followed by “Banking, finance and insurance” (9.5%) and “Manufacturing” (9%)

slide-28
SLIDE 28

Gross Floor Area of the Present Work Location

28

“I/E, wholesale and retail” accounted for 40% of the total occupied office GFA “I/E, wholesale and retail” accounted for 40% of the total occupied office GFA

Provisional findings

slide-29
SLIDE 29
  • No. of Employees of Office Occupiers in Kowloon East

29

Provisional findings

Employees ≤ 9 : 63% Employees ≥ 50 : 6.5% Employees ≤ 9 : 63% Employees ≥ 50 : 6.5%

slide-30
SLIDE 30

Gross Floor Area of the Present Work Location

30

Majority (43%) with office GFA of 1,000 - 2,999 sq ft Majority (43%) with office GFA of 1,000 - 2,999 sq ft

Provisional findings

slide-31
SLIDE 31

Monthly Rental

31

About 54% paid HK$10,000 - 49,999 About 54% paid HK$10,000 - 49,999

Provisional findings

slide-32
SLIDE 32

History of (Re)Location

32

48% relocated/expanded from non-CBD area vs 24% from CBD area 48% relocated/expanded from non-CBD area vs 24% from CBD area

Provisional findings

slide-33
SLIDE 33

The Most Important Reason for Choosing the Present Work Location

33

Cost (39%) & “Availability of suitable premises” (36%) are the two most important factors. Cost (39%) & “Availability of suitable premises” (36%) are the two most important factors.

Provisional findings

slide-34
SLIDE 34

Factors influencing choice of location – Level of Importance and Satisfaction

34

0% 20% 40% 60% 80% 100% 20% 40% 60% 80% 100%

Importance Satisfaction

Very or Quite Important / Satisfied Neutral Not Quite important or Not important at all / Very or Quite Dissatisfied

Important to about 45% of establishments, and dissatisfaction level is relatively high (22%). Important to about 45% of establishments, and dissatisfaction level is relatively high (22%). Very important, and majority found these aspects satisfactory or had neutral feeling. Very important, and majority found these aspects satisfactory or had neutral feeling. Highest dis- satisfaction (25%), though relatively unimportant Highest dis- satisfaction (25%), though relatively unimportant Important to 59% of establishments, and majority found these aspects satisfactory or had neutral feeling. Important to 59% of establishments, and majority found these aspects satisfactory or had neutral feeling.

Provisional findings

slide-35
SLIDE 35

Overall Satisfaction Level Towards the Present Location

35

About 57% of business establishments are satisfied with the present location. Dissatisfaction level is generally very low, with those relocated from CBD a bit higher (9.5%). About 57% of business establishments are satisfied with the present location. Dissatisfaction level is generally very low, with those relocated from CBD a bit higher (9.5%).

Provisional findings

slide-36
SLIDE 36

Possibility of leaving the Present Location in the Coming 5 Years / when Lease Expires

36

Provisional findings

slide-37
SLIDE 37

Most Preferred Area for Relocation

37

Most prefer Non-CBD area (79%), only13% prefer CBD. Among those prefer CBD : majority (57%) relocated from CBD “banking, finance and insurance” accounts for the highest proportion (33%). Most prefer Non-CBD area (79%), only13% prefer CBD. Among those prefer CBD : majority (57%) relocated from CBD “banking, finance and insurance” accounts for the highest proportion (33%).

Most preferred area for relocation

  • No. of respondents

CBD 281 (13%) Non-CBD 1656 (79%) Uncertain at this stage 130 (6%) Areas outside HK 41 (2%) Total 2108 (100%)

Provisional findings

* Regardless of whether the respondents have plan to relocate.

slide-38
SLIDE 38

Expected Changes in the Coming 5 Years

38

Business Activities Staff Number Floor Area

Provisional findings

slide-39
SLIDE 39

Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD

39

Some Initial Observations from the Survey

Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Cost is the dominant consideration influencing choice of office location : rising rental differential to further drive decentralization Cost is the dominant consideration influencing choice of office location : rising rental differential to further drive decentralization Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Cost is the dominant consideration influencing choice of office location : rising rental differential to further drive decentralization Cost is the dominant consideration influencing choice of office location : rising rental differential to further drive decentralization “Accessibility to local public transport” is the second most important factor : Government to enhance transport infrastructure “Accessibility to local public transport” is the second most important factor : Government to enhance transport infrastructure Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Cost is the dominant consideration influencing choice of office location : rising rental differential to further drive decentralization Cost is the dominant consideration influencing choice of office location : rising rental differential to further drive decentralization “Accessibility to local public transport” is the second most important factor : Government to enhance transport infrastructure “Accessibility to local public transport” is the second most important factor : Government to enhance transport infrastructure High satisfaction level with the present work location : "accessibility to local public transport", "cost" and "proximity to business supporting services" attained the highest rate High satisfaction level with the present work location : "accessibility to local public transport", "cost" and "proximity to business supporting services" attained the highest rate Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Gradual spatial segregation of functions (24% relocated/expanded from CBD) : CBD becomes CFD Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Continual office space demand reflected by plans to increase staff and floor space (respectively 27% and 17% of establishments ): need to increase supply Cost is the dominant consideration influencing choice of office location : rising rental differential to further drive decentralization Cost is the dominant consideration influencing choice of office location : rising rental differential to further drive decentralization “Accessibility to local public transport” is the second most important factor : Government to enhance transport infrastructure “Accessibility to local public transport” is the second most important factor : Government to enhance transport infrastructure High satisfaction level with the present work location : "accessibility to local public transport", "cost" and "proximity to business supporting services" attained the highest rate High satisfaction level with the present work location : "accessibility to local public transport", "cost" and "proximity to business supporting services" attained the highest rate Scope for improving “proximity to gov’t depts“, "environmental quality, amenities & landscaping" and "prestige location" : measures include - Kai Tak Govt Offices, urban design, area improvement and branding Scope for improving “proximity to gov’t depts“, "environmental quality, amenities & landscaping" and "prestige location" : measures include - Kai Tak Govt Offices, urban design, area improvement and branding

slide-40
SLIDE 40

The Success of the Kowloon East Node

40

land use zoning to promote development and redevelopment good accessibility with mass transit railway redevelopment of industrial buildings with large footprint critical mass further impetus provided by policy to revitalize industrial buildings private sector initiatives land use zoning to promote development and redevelopment good accessibility with mass transit railway redevelopment of industrial buildings with large footprint critical mass further impetus provided by policy to revitalize industrial buildings private sector initiatives

slide-41
SLIDE 41

The Success of the Kowloon East Node

branding, strong anchor companies area improvement : setback for widened footpath and landscaping branding, strong anchor companies area improvement : setback for widened footpath and landscaping

41

Anchor companies landscaping Setback for footpath widening Waterfront promenade

slide-42
SLIDE 42

The Success of the Kowloon East Node

Area improvement by private sector: footbridge connections between buildings and rail stations Area improvement by private sector: footbridge connections between buildings and rail stations

42

footbridge

slide-43
SLIDE 43

43

Potential of Office Nodes in NT? Potential of Office Nodes in NT? Potential of Office Nodes in NT?

slide-44
SLIDE 44

Spatial distribution between jobs and population

Proportion of population living in the NT would rise from the current 40% to 45% by 2030 Proportion of population living in the NT would rise from the current 40% to 45% by 2030

44

Desirable to bring jobs closer to homes to minimize travelling distance and time Desirable to bring jobs closer to homes to minimize travelling distance and time

60% 55%

Metro

40% 45% NT

slide-45
SLIDE 45

Possible and planned infrastructure and development projects in the N.T.

NENT & Hung Shui Kiu New Development Areas Tuen Mun-Chek Lap Kok Link The HK-Macao-Zhuhai Bridge and the Tuen Mun Eastern Bypass The Northern Link The HK-SZ Western Express Line The Lok Ma Chau Loop The Liantang/Heung Yuen Wai Control Point NENT & Hung Shui Kiu New Development Areas Tuen Mun-Chek Lap Kok Link The HK-Macao-Zhuhai Bridge and the Tuen Mun Eastern Bypass The Northern Link The HK-SZ Western Express Line The Lok Ma Chau Loop The Liantang/Heung Yuen Wai Control Point

45

Inject impetus for office development in the N.T.? Inject impetus for office development in the N.T.?

slide-46
SLIDE 46

Planning Initiatives for Business Uses at Kwu Tung North

Kw u Tung North NDA Fanling North NDA Ping Che/ Ta Kw u Ling NDA

LMC Spur Line Boundary Control Point LMC Boundary Control Point Lo Wu Boundary Control Point Man Kam To Boundary Control Point Proposed Liantang/ Heung Yuen Wai Boundary Control Point

Lok Ma Chau Loop

LO Wu Shenzhen

Futian

F Shui Station anling Station LMC Station

Fanling Highway

Sheung Proposed Kwu Tung Station

Proposed Business Uses

slide-47
SLIDE 47

Appeal to firms having strong business connections in PRD? Appeal to firms requiring large premises, cost sensitive and not requiring a prime location? Provide alternative office environment: low-rise, greening, energy saving Government offices as catalyst? Identify a target sector as anchor? Data centres? Appeal to firms having strong business connections in PRD? Appeal to firms requiring large premises, cost sensitive and not requiring a prime location? Provide alternative office environment: low-rise, greening, energy saving Government offices as catalyst? Identify a target sector as anchor? Data centres?

Potential of office nodes in the N.T.

47

slide-48
SLIDE 48

48

Concluding Remarks

To ensure adequate office land supply to sustain HK’s economic growth To provide office land at different locations to meet different needs To consolidate opportunities in CBD To develop new nodes and enhance development through urban design, provision of infrastructure and amenities To explore new nodes in the N.T.

slide-49
SLIDE 49

49

Thank You Thank You