plan review
play

Plan Review 09/05/2019 O K L A H O M A S TAT E D E PA R T M E N T - PowerPoint PPT Presentation

Plan Review 09/05/2019 O K L A H O M A S TAT E D E PA R T M E N T O F H E A LT H Who We Are: Health Facilities Plan Review Nazli Toloie, Chief Architect Jude Waltman, Architect Gary Hornsby, Architect Kristi Hancock,


  1. Plan Review 09/05/2019 O K L A H O M A S TAT E D E PA R T M E N T O F H E A LT H

  2. Who We Are: Health Facilities Plan Review Nazli Toloie, Chief Architect • Jude Waltman, Architect • Gary Hornsby, Architect • Kristi Hancock, Administrative Assistant • Dr. LaTrina Frazier, Medical Facilities Asst. Service Director • Dr. Julie Myers, Medical Facilities Service Director • O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 2

  3. What We Do • Authority Having Jurisdiction for healthcare facilities • Review plans for compliance • Conduct inspections at project sites • Provide the required physical plant approval, which is necessary for licensure O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 3

  4. Types of Facilities and Depth of Review Facility Type Oklahoma Administrative Code Incorporated References Hospitals OAC 310:667 FGI 2014/18 and incorporated references Ambulatory Surgical Centers OAC 310:615 FGI 2014/18 and incorporated references Assisted Living Facilities OAC 310:663 Limited to OAC Nursing Homes for long term care OAC 310:675 NFPA 101 2012 edition ICF/IID: Intermediate Care Facilities OAC 310:675 NFPA 101 2012 edition for Intellectually Disabled O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 4

  5. Rules Update • Effective 09/13/2019 • OAC 310:667 Hospitals & OAC 310:615 ASC move from FGI 2014 edition to FGI 2018 edition • CMS regulations remain the same • Oklahoma statutes prevail if there is a conflict between the FGI Guidelines and Oklahoma Statutes O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 5

  6. Website Navigation www.health.ok.gov mfs.health.ok.gov On the website you can get information regarding current workload, current administrative code, and applications for consultations, submittals, and inspections. REMINDER - Download NEW forms – corrections made to mailing address for fees and required signature for Functional Program attestation. O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 6

  7. Consultation Services Steps for Requesting Consultation Download consultation form from the website • Submit completed form to planreview@health.ok.gov • Plan Review will call to discuss and/or schedule. • Do not pay the fee until the consultation is scheduled. • O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 7

  8. Exception/Temporary Waiver Request A facility may submit a request for exception or temporary waiver if the FGI Guidelines create an unreasonable hardship, or if the design and construction for the facility property offers improved or compensating features with equivalent outcomes to the FGI Guidelines. Request form is located on the website • Submit completed form and fee to OSDH Plan Review • Remember FGI 2018 goes into effect 09/13/2019 for Hospitals & • ASC O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 8

  9. Submittal Types Traditional Self-Certification Application and Fees Facility OWNS the RISK • • [on website] Appropriate Projects ONLY • Stage 1 (optional) Application and Fees • • Stage 2 (required prior to Light review of application • • construction) Staff do not fully review plans • Courtesy Inspections until an inspection is scheduled • Final Inspection Courtesy Inspections • • Closeout Documentation Final Inspection • • Closeout Documentation • O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 9

  10. Documents Required for Each Submittal Stage 1 Submittal • Submittal Form & Fee (NEW FORM) • Functional Program – as approved by the facility’s governing body ICRA • SRA – Summary Page • One Set of the following for Stage 1 • Preliminary Drawings • Life Safety Plan • Demolition Plan • Existing plan with all spaces labeled • Site plan if the building perimeter is altered or penetrated • As Built drawings for existing buildings • O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 10

  11. Documents Required for Each Submittal Stage 2 Submittal • Submittal Form • Construction Documents: • 2 sets of signed and sealed construction drawings • 1 Specification Manual • 1 Construction Schedule – if available • Written response to any comments from the Stage 1 review if applicable • Revised Functional Program, SRA, ICRA if applicable O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 11

  12. Documents Required for Each Submittal Stage 2 Submittal IF YOU OPT TO SKIP STAGE 1 Submittal Form & Fee • Functional Program – as approved by the facility’s governing body • ICRA • SRA • 2 Sets of Signed & Sealed Final Construction Drawings (include LSP • and existing plan with all spaces labeled) 1 Specifications Manual • 1 Construction Schedule – if available • As Built drawings for existing building • O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 12

  13. Documents Required for Each Submittal Self-Certification Submittal Submittal Form and Fee • Functional Program – as approved by the facility’s governing body • ICRA • SRA • 1 Set of the following Construction Documents • Construction Drawings • Specification Manual • Life Safety Plan • O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 13

  14. Tips for Speedy & Successful Review • Application Errors • Missing Submittal Items • Common mistakes found in drawings • How to prepare for Inspections • Final Documentation O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 14

  15. Questions? O K L A H O M A S T A T E D E P A R T M E N T O F H E A L T H | C R E A T I N G A S T A T E O F H E A L T H 15

  16. 09/05/2019 planreview@health.ok.gov (405)271-6785 This publication was issued by the Oklahoma State Department of Health (OSDH), an equal opportunity employer and provider. A digital file has been deposited with the Publications Clearinghouse of the Oklahoma Department of Libraries in compliance with section 3-114 of Title 65 of the Oklahoma Statutes and is available for download at www.documents.ok.gov.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend