Dipl.‐Ing. Euripides SAKELLARIOU Logistics Operations Manager Deputy Rail Traffic & Safety Manager
PEARL S.A.
Piraeus Port in the map of global supply chains The role of the - - PowerPoint PPT Presentation
Dipl.Ing. Euripides SAKELLARIOU Logistics Operations Manager Deputy Rail Traffic & Safety Manager PEARL S.A. Piraeus Port in the map of global supply chains The role of the railway 7 days faster 2 PIRAEUS XINGANG DALIAN QINGDAO
Dipl.‐Ing. Euripides SAKELLARIOU Logistics Operations Manager Deputy Rail Traffic & Safety Manager
PEARL S.A.
7 days faster
2
5 PIRAEUS
XIAMEN NINGBO QINGDAO DALIAN XINGANG KAOHSIUNG/TAIPEI SHANGHAI NANSHA / SHEKOU / YANTIAN HONG KONG PUSAN
6
✓PCT from 2010 to 2018, managed to go from 0,7M to 4,4 M TEU ✓TOTAL Throughput 2018: PCT: 4,4 M TEU + PPA: 0,5 M TEU = 4,9 M TEU ✓TOTAL Current Capacity: PCT: 6,2 M TEU + PPA: 1 M TEU
2
SK CZ PL DE
Mannheim, DE Pardubice/ Melnik, CZ Enns, AT Bratislava, SK
AT
Budapest, HU
HU
Belgrade,RS
RS BG Skopjie MK GR
Piraeus, GR
Q1/2019 BLOCK TRAINS from/to Piraeus to Central Europe & Balkans
Departure Arrival RailCY RailCY
Transit Time(days)
PCT,Greece Pardubice/ Melnik,CZ
6
Bratislava, SK
5
Budapest, HU
4
Belgrade,RS
2
Skopje, MK
1
Enns, AT
5
PCT or Inoi,Greece Mannheim, DE
6
9
Piraeus Port railway infrastructure – yard plan
Φρεάτιο Γεφυρ/γα Γεφυρ/γα ΠΥΡΓΟΣ Λ Βάση Σ Σ Σ Σ Σ Σ Σ Σ Σ Σ Π . Φ . Π.Φ. Π.Φ. Π.Φ. Σ Σ Σ Σ Σ Σ Σ Σ Σ Π.Φ. Π.Φ. Π.Φ. Π.Φ. Π.Φ. Σ Σ Σ φρεάτιο Ράμπα Σ Πύργος φρεάτιο Σ 240 2 4 1 2 4 2 2 4 3 2 4 4 2 4 5 2 4 6 2 4 7 248 Φρεάτιο Σ Σ Σ Σ Σ Σ Σ Σ Σ Σ ΓΡΑΜΜΗ 1β ΓΡΑΜΜΗ 3β ΓΡΑΜΜΗ 4β ΓΡΑΜΜΗ 4β ΓΡΑΜΜΗ 1β ΓΡΑΜΜΗ 3β ΓΡΑΜΜΗ 2 ΓΡΑΜΜΗ 4β ΓΡΑΜΜΗ 1β ΓΡΑΜΜΗ 3β ΓΡΑΜΜΗ 5 (Μόρτα Απόθεσης) Καθαίρεση Αποθήκης CFS Αποξήλωση των υφιστάμενων ηλεκτρικών παροχών για Ε/Κ - Ψυγεία Καθαίρεση υπάρχουσας Πύλης ΕΠΙΛΙΜΕΝΙΟΣ ΣΤΑΘΜΟΣ Ε/Κ Διαμόρφωση Νέας Πύλης Ενδεικτική Διάταξη Άξονας Αναφοράς Άξονας Αναφοράς Διαμόρφωση χώρου εναπόθεσης Ε/Κ νέου Σταθμού R=35The opportunities are substantial and they are mainly attributed to 3 major reasons/enablers: The opportunity and the potential given by the global supply chains in their efforts to dispatch their goods
The completion (2014) of the rail connection between the Port of Piraeus (PCT) and the main backbone of the GR Rail Infrastructure (via Thriassio Freight Centre) The completion of the double track line on the axis Athens‐Thessaloniki incl. electrification in H1/2019 along with signalization/ telecommand.
6
11
Completion of the double track line’s Piraeus – Thessaloniki (H1/2019), resulting to:
reduction of transit time Full Traction Electrification and Telecommand (ETCS Level 1) for the Piraeus‐ Idomeni/Gevgelija route in 2020 resulting to:
footprint
About Us
company of Piraeus Europe Asia Rail Logistics Ltd. that is incorporated in the U.K., with the sole purpose of providing Rail Logistics services from/and to Greek Ports (mainly Piraeus) Our Vision
in the Balkans and Rail Operators in CE, the main logistics & rail service provider and coordinator in South Eastern Europe, by serving efficiently the global supply chain from Far East and EMEA countries to the Balkans and Central Europe through GREECE
PEARL UK PEARL Beograd PEARL Skopje PEARL BULGARIA PEARL S.A.
licensed as a Railway Undertaking (RU)
Certificates Type A & B from the Greek Regulating Authority for Railways
16
(international transport since 9/1/2017)
to Central Europe (and vice‐versa)
major national Railway Undertakings in the Balkans & CE region.
licensed as a Railway Operator/Undertaking (RU) and since Q4/ 2017, PEARL S.A. is fully operational (Type “B” certified), ready to circulate its own trains in Greece.
17
10 20 30 40 50 60 JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER 24 22 19 18 26 31 33 39 29 28 36 31 42 40 42 29 47 37 28 26 27 24 24 43 32 29 53 Number of trains January February March April May June July August September October November December Total trains 2017 24 22 19 18 26 31 33 39 29 28 36 31 Total trains 2018 42 40 42 29 47 37 28 26 27 24 24 43 Total Trains 2019 32 29 53
Volume Evolution Chart
Total trains 2017 Total trains 2018 Total Trains 2019
Rolling Stock:
signing lease contracts with several vendors (private suppliers & state owned RUs).
(> 400 wagons – 17 full train sets)
Sggrs(s), Sggmrs(s), Sgns(s), Laagss, Lgs(s), Kgs(s)
TEUs.
Electric) has already been drafted (Expecting delivery H2/ 2019).
16
Sggrs; 60; 12% Sgns; 6; 1% Sggmrs; 80; 15% Sggnss; 30; 6% Lgs; 80; 15% Kgs; 70; 13% Sggrss; 115; 22% Laagss; 22; 4% Sgnss; 19; 4% Lgss; 40; 8%
PEARL's WAGON POOL (per type)
Sggrs Sgns Sggmrs Sggnss Lgs Kgs Sggrss Laagss Sgnss Lgss
passionate & open minded, rigorous in execution, who have an everlasting curiosity, who leverage the differences around them and create solutions, with a healthy disregard for conventional thinking, Leaders who are ready to face diverse challenges and are eager to learn and develop every day!
17 20‐30 44% 30‐40 25% 40‐50 6% 50‐60 12% 60‐70 13%
Personnel age distribution
20‐30 30‐40 40‐50 50‐60 60‐70
18
CONTACT DETAILS: Dipl.-Ing. Euripides SAKELLARIOU Logistics Operations Manager Deputy Rail Traffic & Safety Manager PEARL S.A.
85 Akti Miaouli Str., 185 38 Piraeus, Greece e.sakellariou@pearl-rail.com http: / / www.pearl-rail.com + 30 6940 885522 19