PepsiCo Confidential
1
PepsiCo Kolkata Plant Food Safety & Quality Excellence Journey - - PowerPoint PPT Presentation
PepsiCo Kolkata Plant Food Safety & Quality Excellence Journey 1 PepsiCo Confidential Kolkata Plant Journey Journey Towards Excellence Kolkata Plant Journey ISO 22K TPM consistency TPM OHSAS TPM implemented. award & CII National
PepsiCo Confidential
1
PepsiCo Confidential
2
ISO 22K implemented. AIB Unannounced audit TPM Excellence Award HACCP Certification
2006 2007 2008 2005
Plant Startup OHSAS 18001 Certification
2013
ISO 14001 and AIB journey started TPM consistency award & CII National Food safety Award TPM Kick off
2009 2012 2014
+905 in AIB Unannounced audit
2004 2015
Center of Excellence (H&S
PepsiCo Confidential
3
HACCP 2006-2011 ISO 22 K 2012-2015 FSSC 22 K 2016 .. Onwards Announced GMP inspection Unannounced GMP inspection Quality Program QSHA standard implementation Quality System Health Audit
PepsiCo Confidential
4
NEW SCORING MATRIX <700 – UNSATISFACTORY 700-910 – RECOGNITION OF ACCOMPLISHMENT (With no Unsatisfactory finding) 915-1000- RECOGNITION OF ACHIEVEMENT (With no serious finding)
PepsiCo Confidential
5
PepsiCo Confidential
6
Food safety Quality QM Pillar Approach
Integration of food safety and HACCP guidelines under QM - pillar. Circle Targets Identification of Q Component & Monitoring through JH
Standards
Focused Task forces
Plant Quality & Food safety KPIs
An engaged culture at plant developed through participation by all from each level… It’s plant’s way of life
Focused approach on Challenging food safety & Quality through QM Pillar approach
Expanding QA activities till distributor end: Latent defect control
More focus on food safety benchmarking
Supporting JH and E&T to develop process competent operators
PepsiCo Confidential
7
Circle audits Circle audits Circle audits Circle audits Monthly Review Action plan Practice Related
Infrastructure / System
Abnormalities
Corrective Action Plan Check Reoccurrence
Kaizen implementation Maintenance Prevention
PepsiCo Confidential
8
Training and awareness (Project and regular manpower)
Huge man movement inside the plant due to multiple projects
Biomethanation Canteen Expansion Sprinkler project Septic tank & PM expansion project
PepsiCo Confidential
9
Regular Spray At Plant Exterior By PCI Operators
Sample Pest Control Spray Log Sheet
Daily Rodabox Monitoring Sheet
Daily Pest-o-flash monitoring sheet
PepsiCo Confidential
10
After
Second Line Of Defense Prepared to restrict bird and pest During Loading Unloading Despatch shutter open and entry for bird and other pest
Before Before After
Door Discipline, Receiving Inspection & Cleaning Of Pallets On Daily Basis
PepsiCo Confidential
11
Project Display Boards and physical separation CCTV cameras & shoe cleaners at process entry
PepsiCo Confidential
12
Teacher –student model Food safety related OPLs Slogans & Posters
PepsiCo Confidential
13
Food Safety PEP Talk With Operatives During Shift Communication Food Safety OPL Display At Shop Floor. Food Safety OPL Docket Food Safety PEP Talk With Casuals During Plant Entry Classroom Training For Management Training Validation
Sample Validation Sheet
Monthly review Gap analysis Action plan Class room training / on job training Communicatio n/ Pep talk/ OPL/ Displays Validation by validation team
PepsiCo Confidential
14
PepsiCo Confidential
15
Quality dockets available In online learning center
AIB training ppt HLE ppt Procedure for potato receiving Store Frito-Lay way HACCP module Storage procedure
Agro sampling Packaging & palletizing Personnel hygiene Trim & pair station
PepsiCo Confidential
16
Abnormality List Was In Decreasing Tread Within Very Short Time
Before After
Per Day AIB Abnormalities,
80 45 20 10 5 25 45 65 85 Ave/Day( WK-1) Ave/Day( WK-2) Ave/Day( WK-3) Ave/Day( WK-4)
No of AIB abnormalities
Q PT
PepsiCo Confidential
17
Kolkata Premier League – Plnat’s biggest engagement program – QM pillar is an integral part of this program – It is Learning through Fun , powered by Team Kolkata
Demo on Q- Defect
PepsiCo Confidential
18
Sharing kaizen s related to Safety , Quality & Productivity
Sharing kaizen s related to Safety , Quality & Productivity
PepsiCo Confidential
19
Posting of Tags prior to sanitation program Categorization of Red Tag & White tag Food safety Tags – priority A and Tech- support allocated to sort out issues Post Boilout Compliance of Red & White tags are monitored
QM & PM Pillar Intervention
Communication during sanitation day
PepsiCo Confidential
20
First plant to clear Unannounced audit
500 550 600 650 700 750 800 850 900 950 1000 2011 2012 2014 2015
815 760 870 905
AIB Score
Highest Score in Unannounced audit
PepsiCo Confidential
21