PEO Perspective MR. SCOTT DAVIS Program Executive Officer Combat - - PowerPoint PPT Presentation

UNCLASSIFIED Dist stri ributi bution on Statemen tement t A: Approved for public release: distribution is unlimited PEO Perspective MR. SCOTT DAVIS Program Executive Officer Combat Support & Combat Service Support 2016 UNCLASSIFIED


slide-1
SLIDE 1

PEO Perspective

  • MR. SCOTT DAVIS

Program Executive Officer Combat Support & Combat Service Support UNCLASSIFIED UNCLASSIFIED

2016

Dist stri ributi bution

  • n Statemen

tement t A: Approved for public release: distribution is unlimited

slide-2
SLIDE 2

Requirements Resources Program Management Sustainment

Thoughts on Army Acquisition

  • “acquisition”
  • Army Acquisition Executive
  • 12 Program Executive Offices (PEOs) / subordinate program offices
  • Army Acquisition considerations:
  • Facing sustained uncertainty – Budget and Threats

ats

  • Transitioning…to a leaner, more capable, more expeditionary force, while…
  • …investing in programs with the highest operational return and…building new
  • nly by exception.

2 2016 PEO CS&CSS – WPI Outreach Event

Informed by S&T S&T and Testi ting. Executed through Contrac acti ting ng. Need “Acquisition”

slide-3
SLIDE 3
  • Autonomy-enabled capabilities
  • Water management & sourcing
  • Ground Mobility Vehicle
  • Maneuver Support Vessel-Light
  • Power management & distribution
  • Family of Medium Tactical Vehicles A2
  • Joint Precision Air Drop System (JPADS)
  • Battlefield Kitchen
  • TWVs: MRAPs, HMMWVs, etc.
  • Tug Boats
  • TWVs: MRAPs, HMMWVs, etc.
  • Landing Craft Mechanized-8 (LCM-8)
  • Armored Vehicle Launch Bridge (AVLB)

Army Investment Strategy

3

S&T S&T

New Capab abilit ilitie ies Increm ement ental al Moder erniza ization tion

Rese set t and Sustai tainment ment Dive vesti stitu ture

“Currently, near-term capability gaps are mostly mitigated through incremental improvements to existing platforms and systems, while we make prudent investments in emerging and breakthrough technologies to address future gaps.” –LTG Michael Williamson

2016 PEO CS&CSS – WPI Outreach Event

slide-4
SLIDE 4

Project Manager Joint Light Tactical Vehicle (JLTV)

4

JLTV TV

2016 PEO CS&CSS – WPI Outreach Event

slide-5
SLIDE 5

Project Manager Mine Resistant Ambush Protected (MRAP) Vehicles

5

MRA MRAP Vehic hicles es Assu sured d Mobi bili lity Systems stems

2016 PEO CS&CSS – WPI Outreach Event

slide-6
SLIDE 6

Project Manager Transportation Systems (TS)

6

Army my Watercra tercraft ft Systems stems Allied d Tactical Vehic hicles es Light ght Tact ctica cal l Vehic hicles les Heav avy Tac actica cal l Vehic hicle les Medi dium Tac actica cal l Vehicl cles

FY 2017 17 - Q1 Q1 FY 2017 17 - Q2 Q2 FY 2017 17 - Q3 Q3 FY 2017 17 - Q4 Q4

ACAT 1

  • Family of Medium Tactical

Vehicles (A2)

ACAT 3

  • Ground Mobility Vehicle
  • Heavy Dump Truck
  • Maneuver Support Vessel

(Light)

  • Light Engineer Utility Trailer
  • By-Wire Active Safety Kit

(BWASK) for Palletized Load System truck

2016 PEO CS&CSS – WPI Outreach Event

Potential RFP dates are for planning purposes, subject to change, and not binding on the government.

slide-7
SLIDE 7

Project Manager Expeditionary Energy & Sustainment Systems (E2S2)

7

Batte tery Power er Systems Systems Mobi bile le Elec ectric tric Power er Systems stems Force ce Sustai stainmen ment Systems stems Small mall Expedi diti tiona nary Power er Source ces FY 2017 17 - Q1 Q1 FY 2017 17 - Q2 Q2 FY 2017 17 - Q3 Q3 FY 2017 17 - Q4 Q4

ACAT 3

  • Small Tactical Electric Power
  • Advanced Medium Mobile

Power Sources

  • Improved Environmental

Control Unit (9/18/36k)

  • Management and Distribution

Control

  • Ultra Lightweight Camouflage

Net System

2016 PEO CS&CSS – WPI Outreach Event

Potential RFP dates are for planning purposes, subject to change, and not binding on the government.

slide-8
SLIDE 8

Project Manager Force Projection (FP)

8

Test est, Meas asureme ment nt, & Diag agnosti nostic Equipme pment nt Petrole leum & Water ter Systems stems Set ets, s, Kits, s, Outfi fits ts & T Tools ls App ppliqu qué & Large Unma manne nned d Ground nd System stems Unma manne nned d Ground nd Vehic hicle les Comba mbat Engi gine neer/ Materia terial l Handl ndling ng Equipmen ment Bridgi dging FY 2017 17 - Q1 Q1 FY 2017 17 - Q2 Q2 FY 2017 17 - Q3 Q3 FY 2017 17 - Q4 Q4

ACAT 3

  • Maintenance Support Device (V4) Rugged
  • TS-4549T Radio Test Set
  • TS-4544 Telecommunication System Test Set
  • Oscilloscope OS-305/U and OS-307/U
  • TS-4548 Frequency Power Test Set
  • ME-572 Ammeter
  • Route Clearance and Interrogation System
  • Man-Transportable Robotics System,

Increment II

  • Common Robotic System -

Individual

  • Maintenance Support Device (V4)

Light

  • Mobile Tactical Retail Refueling

System

  • Load Handling System Compatible

Water Tank Rack System

  • TS-4558/U Optical Time Doman

Reflectometer

2016 PEO CS&CSS – WPI Outreach Event

Potential RFP dates are for planning purposes, subject to change, and not binding on the government.

slide-9
SLIDE 9

Opportunities

  • Engage the Research and Development Community
  • Engage the Requirements Community
  • Engage Small Business Offices
  • TACOM: https://www.tacom.army.mil/sbo/index.html
  • Engage with Current / Prospective Prime Vendors
  • Participate in Industry Days, Conferences & Outreach Events
  • Monitor Federal Business Opportunities (www.fbo.gov)

9 2016 PEO CS&CSS – WPI Outreach Event

slide-10
SLIDE 10

Questions?

http://www.peocscss.army.mil/

UNCLASSIFIED UNCLASSIFIED

2016

Dist stri ributi bution

  • n Statemen

tement t A: Approved for public release: distribution is unlimited