PEO Perspective
- MR. SCOTT DAVIS
Program Executive Officer Combat Support & Combat Service Support UNCLASSIFIED UNCLASSIFIED
2016
Dist stri ributi bution
- n Statemen
tement t A: Approved for public release: distribution is unlimited
PEO Perspective MR. SCOTT DAVIS Program Executive Officer Combat - - PowerPoint PPT Presentation
UNCLASSIFIED Dist stri ributi bution on Statemen tement t A: Approved for public release: distribution is unlimited PEO Perspective MR. SCOTT DAVIS Program Executive Officer Combat Support & Combat Service Support 2016 UNCLASSIFIED
Program Executive Officer Combat Support & Combat Service Support UNCLASSIFIED UNCLASSIFIED
2016
Dist stri ributi bution
tement t A: Approved for public release: distribution is unlimited
Requirements Resources Program Management Sustainment
ats
2 2016 PEO CS&CSS – WPI Outreach Event
Informed by S&T S&T and Testi ting. Executed through Contrac acti ting ng. Need “Acquisition”
3
S&T S&T
New Capab abilit ilitie ies Increm ement ental al Moder erniza ization tion
Rese set t and Sustai tainment ment Dive vesti stitu ture
“Currently, near-term capability gaps are mostly mitigated through incremental improvements to existing platforms and systems, while we make prudent investments in emerging and breakthrough technologies to address future gaps.” –LTG Michael Williamson
2016 PEO CS&CSS – WPI Outreach Event
Project Manager Joint Light Tactical Vehicle (JLTV)
4
JLTV TV
2016 PEO CS&CSS – WPI Outreach Event
Project Manager Mine Resistant Ambush Protected (MRAP) Vehicles
5
MRA MRAP Vehic hicles es Assu sured d Mobi bili lity Systems stems
2016 PEO CS&CSS – WPI Outreach Event
Project Manager Transportation Systems (TS)
6
Army my Watercra tercraft ft Systems stems Allied d Tactical Vehic hicles es Light ght Tact ctica cal l Vehic hicles les Heav avy Tac actica cal l Vehic hicle les Medi dium Tac actica cal l Vehicl cles
FY 2017 17 - Q1 Q1 FY 2017 17 - Q2 Q2 FY 2017 17 - Q3 Q3 FY 2017 17 - Q4 Q4
ACAT 1
Vehicles (A2)
ACAT 3
(Light)
(BWASK) for Palletized Load System truck
2016 PEO CS&CSS – WPI Outreach Event
Potential RFP dates are for planning purposes, subject to change, and not binding on the government.
Project Manager Expeditionary Energy & Sustainment Systems (E2S2)
7
Batte tery Power er Systems Systems Mobi bile le Elec ectric tric Power er Systems stems Force ce Sustai stainmen ment Systems stems Small mall Expedi diti tiona nary Power er Source ces FY 2017 17 - Q1 Q1 FY 2017 17 - Q2 Q2 FY 2017 17 - Q3 Q3 FY 2017 17 - Q4 Q4
ACAT 3
Power Sources
Control Unit (9/18/36k)
Control
Net System
2016 PEO CS&CSS – WPI Outreach Event
Potential RFP dates are for planning purposes, subject to change, and not binding on the government.
Project Manager Force Projection (FP)
8
Test est, Meas asureme ment nt, & Diag agnosti nostic Equipme pment nt Petrole leum & Water ter Systems stems Set ets, s, Kits, s, Outfi fits ts & T Tools ls App ppliqu qué & Large Unma manne nned d Ground nd System stems Unma manne nned d Ground nd Vehic hicle les Comba mbat Engi gine neer/ Materia terial l Handl ndling ng Equipmen ment Bridgi dging FY 2017 17 - Q1 Q1 FY 2017 17 - Q2 Q2 FY 2017 17 - Q3 Q3 FY 2017 17 - Q4 Q4
ACAT 3
Increment II
Individual
Light
System
Water Tank Rack System
Reflectometer
2016 PEO CS&CSS – WPI Outreach Event
Potential RFP dates are for planning purposes, subject to change, and not binding on the government.
9 2016 PEO CS&CSS – WPI Outreach Event
UNCLASSIFIED UNCLASSIFIED
2016
Dist stri ributi bution
tement t A: Approved for public release: distribution is unlimited