PEAK GOLD JOINT VENTURE PROJECT TOK MINING DISTRICT, ALASKA Contango ORE, Inc. September 20, 2017 1 CONTANGO ORE, INC. DISCLAIMER This presentation may contain forward-looking statements including, but not limited to, comments
2
This presentation may contain forward-looking statements including, but not limited to, comments regarding timing and content of upcoming work programs, geological interpretations, receipt of property titles, in-situ valuations, mining costs, potential mineral recovery processes, mineral resources or reserves and other related matters. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. The forward- looking statements contained in this presentation represent the subjective views of the management of Contango ORE, Inc. and management’s current estimates of future performance based on assumptions that are subject to significant business, economic and competitive uncertainties and contingencies, which are beyond the control of Contango ORE, Inc. and which may or may not prove to be correct. The properties addressed herein are at an early stage of development. More work is required before mineralization and project economics can be confidently modeled or
- determined. Actual results may differ materially from those currently anticipated and presented in
this presentation. No representation, warranty or prediction is made or intended as to the results
- f future work, the ability to obtain governmental approvals for further development or the
accuracy or completeness of any of the information contained in this presentation. There is no assurance that the estimates and projections herein will be sustained in future work or that the project will otherwise prove to be economic. Y
- u should not unduly rely on these forward-looking
statements in this presentation. Contango ORE, Inc. expressly disclaims any and all liability relating to or resulting from the use of information contained in this presentation.
CONTANGO ORE, INC. DISCLAIMER
Contango ORE, Inc. - Peak Gold Joint Venture Project
3
PEAK GOLD, LLC
- On January 8, 2015, Contango Ore and Royal Gold, Inc. formed a joint
venture, Peak Gold, LLC through their wholly owned subsidiaries.
- Contango contributed its State of Alaska mining claims and its Tetlin
Lease to the Joint Venture.
- Royal Gold would manage and operate continued exploration on the
Tetlin project.
- Royal Gold has the option to invest up to $30 million through October
2018 to earn up to a 40% interest in the Joint Venture with drag-along rights attached.
- Royal Gold either a 2% or 3% NSR royalty over property controlled by
the joint venture, and the landowner has a production royalty between 2.25% and 4.25% over the area of the Tetlin lease.
- Royal Gold, Inc. is expected to earn their 40% interest in the Joint
Venture by December 31, 2017.
Contango ORE, Inc. - Peak Gold Joint Venture Project
4 Contango ORE, Inc. - Peak Gold Joint Venture Project
- Located in Eastern
Interior Alaska on Alcan Hwy, 200 paved road miles from Fairbanks, 15 miles south of Tok
- All-season gravel road
with power and communications in the Peak resource area, three large mines operating in the region
LOCATION
45 miles 54 miles
- Land includes 675,000
acres of fee simple land leased from Tetlin Village and approximately 174,900 acres of State mining claims owned by Peak Gold JV.
- No previous exploration
- n Tetlin Village lands,
an area measuring 45 miles E-W by 54 miles N-S.
- Multiple gold-bearing
prospects discovered, drilling conducted only
- n Peak, Discovery,
Saddle and Tors, resources outlined at Peak (~100 acres).
TETLIN LAND
5 Contango ORE, Inc. - Peak Gold Joint Venture Project
TETLIN REGIONAL GEOLOGY
6
Modified after Newberry et. al, 1998
Contango ORE, Inc. - Peak Gold Joint Venture Project
GEOLOGY AND MINERALIZATION
7
- Host rocks are poly-metamorphosed Paleozoic calcareous
schists in a largely psammitic schist basement disconformably
- verlain/intruded by local Tertiary volcanic/plutonic rocks
- 70 Ma mineralization occurs in chlorite-amphibole-rich distal
skarn assemblages. No prograde skarn assemblage present.
- Native gold associated with massive to semi-massive
pyrrhotite-chalcopyrite-arsenopyrite with lesser Ag, Bi, Co, Pb, Sb, Mo, Sn and Zn species.
- Causative plutonic body is not evident at surface or in drilling.
- Bedrock in resource area is masked by 1-3 meters of
Pleistocene loess supporting thick vegetative mat.
Contango ORE, Inc. - Peak Gold Joint Venture Project
TETLIN GOLD IN SOIL OVER MAGNETICS
North Peak Zone
8
West Peak Zone
Contango ORE, Inc. - Peak Gold Joint Venture Project
3.5 miles 4 miles
9
CAUTIONARY NOTE TO U.S. INVESTORS
Note: The US Securities and Exchange Commission permits US listed mining companies to disclose in their SEC filings
- nly information about "reserves," or that part
- f a mineral deposit which could be
economically and legally extracted or
- produced. Contango ORE Inc. uses the
terms "indicated resources" and "inferred resources," which are much less certain as to existence and the ability to legally and economically produce. It cannot be assumed that all or any portion of inferred resources exist or will be converted to a higher resource
- r reserve category. Investors are urged to
carefully consider the disclosure in Contango ORE Inc.'s public disclosures, which may be
- btained from the SEC's website.
Contango ORE, Inc. - Peak Gold Joint Venture Project
GRADE x THICKNESS: MAIN PEAK - NORTH PEAK ZONES
10 Contango ORE, Inc. - Peak Gold Joint Venture Project
Updated estimates of mineralized material1 for the Main and North Peak areas which are operated by the Peak Gold, LLC joint venture (“Peak Gold”) in Eastern Alaska The measured and indicated resources2 were calculated with resource cones at a gold price of $1,200 per ounce with a cut-off grade of 0.5 grams per tonne and at $1,400 gold with a cut-off grade of 0.43 grams per tonne.
TETLIN PROJECT RESOURCES
(Resource from Contango ORE, June 2017)
11 Contango ORE, Inc. - Peak Gold Joint Venture Project
Measured and Indicated within $1200/oz Gold Pit Shell at a 0.50 g/t AuEq Cut-off Grade Grade > Cut-off Contained Metal Class Tonnage (kt) Au (g/t) Ag (g/t) Cu (%) Au (k oz) Ag (k oz) Cu (M lbs) Measured 484 6.25 16.73 0.15 97.3 260.4 1.6 Indicated 10,117 3.51 14.06 0.16 1,142.6 4,573.3 35.7 M&I 10,601 3.64 14.18 0.16 1,239.9 4,833.7 37.3 Equivalent Gold (g/t) = Au (g/t) + 0.0122 x Ag (g/t) Measured and Indicated within $1400/oz Gold Pit Shell at a 0.43 g/t AuEq Cut-off Grade Grade > Cut-off Contained Metal Class Tonnage (kt) Au (g/t) Ag (g/t) Cu (%) Au (k oz) Ag (k oz) Cu (M lbs) Measured 486 6.22 16.65 0.15 97.2 260.2 1.6 Indicated 10,808 3.34 13.97 0.16 1,159.5 4,854.5 38.0 M&I 11,294 3.46 14.09 0.16 1,256.7 5,114.7 39.6 Resource data from IMC, June 2017
1The U.S. Securities and Exchange Commission does not
recognize this term. Mineralized material is that part of a mineral system that has potential economic significance but cannot be included in the proven and probable ore reserve estimates until further drilling and metallurgical work is completed, and until other economic and technical feasibility factors based upon such work have been resolved. Investors are cautioned not to assume that any part or all of the mineral deposits in this category will ever be converted into reserves or that the ore can be legally and economically extracted or produced.
2 The terms measured and indicated resource are
not SEC recognized terms. Peak Gold has determined that such resources would be substantively the same as those prepared using the Guidelines established by the Society of Mining, Metallurgy and Exploration and defined as Mineral
- Resource. Estimates of resources are subject to further
exploration and development, are subject to additional risks, and no assurance can be given that they will eventually convert to future reserves.
Contango ORE, Inc. - Peak Gold Joint Venture Project 12
Aggregate mineralized material, of which measured and indicated resources as shown above are a subset3, at various cutoff grades are show below:
3 The quantity and grade of reported Inferred Resources included in this estimation are
uncertain in nature and there has been insufficient exploration to define these Inferred Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.
Contango ORE, Inc. - Peak Gold Joint Venture Project 13 Cut-off Tonnage Au Ag Cu Au Ag Cu (g/t AuEq) (kt) (g/t) (g/t) (%) (k oz) (k oz) (M lbs) 0.3 18,142 2.62 13.64 0.15 1,526 7,957 61 0.4 16,730 2.81 14.23 0.16 1,514 7,656 58 0.5 15,650 2.98 14.68 0.16 1,502 7,387 55 0.6 14,702 3.15 15.1 0.16 1,488 7,139 52 0.7 13,883 3.3 15.38 0.16 1,474 6,864 49 0.8 13,110 3.46 15.66 0.16 1,458 6,602 47 0.9 12,378 3.62 15.94 0.16 1,442 6,343 45 1 11,663 3.8 16.14 0.16 1,423 6,053 42 Grade > Cut-off Contained Metal Equivalent Gold (g/t) = Au (g/t) + 0.0122 x Ag (g/t)
Drilling costs are approximately $400 per meter of $122 per foot.
* 2017 performance data is accurate through June 30, 2017. Expenditures numbers for 2017 also include Phase III 2017 and are total approved budget figures.
TETLIN PROJECT WORK SUMMARY
14 Contango ORE, Inc. - Peak Gold Joint Venture Project Year Core samples Rock samples Soil samples Pan Con samples Stream Sed samples Core (feet) Geophys (km) Trenching (feet) Expenditures (US$) Airborne Mag+EM (km) (not including IP) 2009 958 33 94 11 2,330 639,429 2010 613 760 668 795 14 877,762 2011 1,267 20 688 8,057 3,957 2,371,088 3,957 2012 5,223 82 1,029 0 36,004 3,501,880 2013 8,970 14 1,406 85 278 47,079 2,414 8,056,936 2,414 2014 6,999,620 2015 8,352 133 0 46,128 6,800,000 2016 10,450 21 694 0 67,336 24 11,000,000 2017* 11,034 79 1,172 357 366 49,218 48 11,900,000 Total 45,296 1,920 5,782 1,204 1,450 253,822 6,457 2,330 52,146,715 6,371
CONTANGO ORE CORPORATE METRICS
15
CTGO: OTCQB
As of September 15, 2017: Outstanding shares of common stock
(which includes 172,330 shares of unvested restricted stock ):
4,921,163 Outstanding options: 265,000 Outstanding warrants: 580,999 Fully Diluted shares of common stock: 5,767,162 Stock price: $17.25 Market capitalization: $84.9 million
Contango ORE, Inc. - Peak Gold Joint Venture Project
TETLIN PROJECT SUMMARY
- Road accessible on stable, State of Alaska and
fee simple lands.
- Current indicated resource averages +3 grams
gold per tonne, is located at or near surface and is open to expansion.
- Multiple unexplored gold occurrences identified
- utside of the 100-acre Main Peak – North Peak
area.
- Royal Gold is expected to earn their full 40%
interest in the Peak Gold JV by December 31,
- 2017. In 2018, Contango Ore will resume paying
capital costs at its 60% interest. Royal Gold will continue to be the manager of the Joint Venture, we expect further exploratory drilling to occur in 2018.
16 Contango ORE, Inc. - Peak Gold Joint Venture Project