Pe r mitting of Solar Pr oje c ts in Ve r mont Pre se nte d b - - PowerPoint PPT Presentation

pe r mitting of solar pr oje c ts in ve r mont
SMART_READER_LITE
LIVE PREVIEW

Pe r mitting of Solar Pr oje c ts in Ve r mont Pre se nte d b - - PowerPoint PPT Presentation

Pe r mitting of Solar Pr oje c ts in Ve r mont Pre se nte d b y Je a nnie Olive r, Spe c ia l Co unse l, De pa rtme nt o f Pub lic Se rvic e AGE NDA 10 minute o ve rvie w inc luding : I ntro duc tio n: wha t is Se c tio n 248?


slide-1
SLIDE 1

Pe r mitting of Solar Pr

  • je c ts in

Ve r mont

Pre se nte d b y Je a nnie Olive r, Spe c ia l Co unse l, De pa rtme nt o f Pub lic Se rvic e

slide-2
SLIDE 2

AGE NDA

 10 minute o ve rvie w inc luding :

 I

ntro duc tio n: wha t is Se c tio n 248?

 Se c tio n 248 Crite ria g e ne ra lly.  Se c tio n 248 Pro c e sse s – the full pro c e ss, the

e xpe dite d pro c e ss, a nd e ve rything in b e twe e n.

 Oppo rtunity fo r Que stio ns

slide-3
SLIDE 3

Wha t is Se c tio n 248?

 Requires energy, gas, telecom, and water developers to

  • btain a Certificate of Public Good (CPG) from the Public

Service Board

 Board considers 10 statutory criteria, including

environmental criteria from Act 250 plus issues like need, reliability, economic benefit, and the general public good

 Different pathways for different size and type of projects

http://www.leg.state.vt.us/statutes/fullsection.cfm?Title=30&Chapter=005&Section=00248

I ntro duc tio n

slide-4
SLIDE 4

Pa rtie s in the § 248 Pro c e ss

Pub lic Se rvic e Bo a rd: De c isio n Ma ke r I nte rve no rs I nte rve ntio n a s o f Rig ht PSB Rule 2.209(A) E .g ., Munic ipa l le g isla tive b o dy a nd Pla nning Co mmissio n – Ac t 56 Munic ipa l pub lic inte re st Pe rmissive I nte rve ntio n PSB Rule 2.209(B) E .g ., Adjo ining la nd o wne rs Priva te inte re sts Sta tuto ry pa rtie s De pa rtme nt 30 V.S.A. §§ 2(a )(7) a nd 2(b ) Sta te Pub lic I nte re st ANR 30 V.S.A. § 248(a )(4)(E ) Sta te e nviro nme nta l inte re sts Applic a nt

I ntro duc tio n

* So me a mb ig uity re g a rd ing sta tus o f Munic ipa l Pa rtic ipa tio n – sta tuto ry vs. inte rve ntio n a s o f rig ht

slide-5
SLIDE 5

T he Pub lic I nte re st

 Bo a rd : 30 V.S.A. § 248(a )(2) – Ca n’ t b e g in site

pre pa ra tio n fo r o r c o nstruc tio n o f a n e le c tric g e ne ra tio n fa c ility within the Sta te “unle ss the Pub lic Se rvic e Bo a rd first finds tha t the sa me will pro mo te the g e ne ra l g o o d o f the Sta te a nd issue s a c e rtific a te to tha t e ffe c t.”

 De pa rtme nt:

30 V.S.A. § 2(b ): “the De pa rtme nt sha ll re pre se nt the inte re sts o f the pe o ple

  • f

the Sta te , unle ss

  • the rwise

spe c ifie d b y la w.”

 Ba la nc ing e xe rc ise b a se d o n the a pplic a b le

248 c rite ria .

I ntro duc tio n

slide-6
SLIDE 6

T he Pub lic I nte re st

 I

de a lly, the pub lic inte re st in 248 pro c e e ding s wo uld lo o k so me thing like this:

I ntro duc tio n

Munic ipa l Re g io na l E nviro nme nta l Adjo ining la ndo wne rs De ve lo pe rs Ra te pa ye rs

slide-7
SLIDE 7

Se c tio n 248 Crite ria Ge ne ra lly

 T

he Bo a rd c o nside rs 10 sta tuto ry c rite ria se t o ut a t Se c tio n 248(b ), inc luding :

 mo st o f the e nviro nme nta l c rite ria fro m Ac t

250 (248(b )(5)),

 o rde rly de ve lo pme nt (248(b )(1)),  ne e d (248(b )(2)),  syste m sta b ility a nd re lia b ility (248(b )(3)),  e c o no mic b e ne fits (248(b )(4)). 248 Crite ria

slide-8
SLIDE 8

So me § 248 Crite ria Ma y Be Wa ive d fo r Sma lle r Pro je c ts

 Ne t Me te ring :

 30 V.S.A. § 219a (c ) g ive s the Bo a rd a utho rity to e na c t

rule s o r o rde rs wa iving § 248 c rite ria .

 PSB Rule 5.108 se ts o ut the c rite ria whic h a re no t

c o nditio na lly wa ive d: Syste m sta b ility a nd re lia b ility;

  • rde rly de ve lo pme nt; e nviro nme nta l c o nside ra tio ns;
  • utsta nding re so urc e wa te rs.

 Re ne wa b le E

ne rg y Pla nts up to 2.2 MW

 30 V.S.A. § 8007(b ) g ive s the Bo a rd a utho rity to e na c t

rule s o r o rde rs wa iving § 248 c rite ria . Se e Orde r o f 8/ 31/ 2010

 Co nditio na l wa ive r o f ne e d; wa te r c o nse rva tio n;

suffic ie nc y o f wa te r a nd b urde n o n e xisting wa te r supply, e duc a tio na l se rvic e s; c o mplia nc e with E le c tric E ne rg y Pla n a nd L e a st Co st Inte g ra te d Re so urc e Pla n. E c o no mic b e ne fit c o nditio na lly wa ive d fo r sta nda rd

  • ffe r pro je c ts o nly.

248 Crite ria

slide-9
SLIDE 9

Orde rly De ve lo pme nt

 § 248(b )(1)  Due c o nside ra tio n g ive n to the

re c o mme nda tio ns o f the munic ipa l a nd re g io na l pla nning c o mmissio ns; munic ipa l le g isla tive b o die s; a nd la nd c o nse rva tio n me a sure s c o nta ine d within the pla n o f a n a ffe c te d munic ipa lity.

 Cha lle ng e s:

 T

ime limita tio ns fo r ma king re c o mme nda tio ns.

 T

  • wn pla ns o fte n a spira tio na l, no t spe c ific .

 No t lo c a l zo ning re g ula tio ns a nd b yla ws.

248 Crite ria

slide-10
SLIDE 10

Orde rly De ve lo pme nt

 Ac t 56 Se c tio n 26c inse rte d § 248(b )(1)(B)  Re q uire s so la r fa c ilitie s to c o mply with the

sc re e ning re q uire me nts o f a munic ipa l b yla w a do pte d unde r 24 V.S.A. § 4414(15)

  • r a munic ipa l o rdina nc e a do pte d unde r

24 V.S.A. § 2291(28), unle ss the Bo a rd finds tha t suc h c o mplia nc e wo uld pro hib it o r ha ve the e ffe c t o f pro hib iting the insta lla tio n o f suc h a fa c ility o r ha ve the e ffe c t o f inte rfe ring with the fa c ility’ s inte nde d use .

248 Crite ria

slide-11
SLIDE 11

Ae sthe tic s

 § 248(b )(5) a nd 10 V.S.A. § 6086(a )(8)  Ne t Me te ring : PSB Rule 5.109  “Will no t ha ve a n undue a dve rse e ffe c t

  • n the sc e nic o r na tura l b e a uty o f the

a re a , a e sthe tic s, histo ric site s o r ra re a nd irre pla c e a b le na tura l a re a s.”

248 Crite ria

slide-12
SLIDE 12

Ae sthe tic s

 Bo a rd ha s a do pte d the Que c he e a na lysis:

 Adve rse ?

 K

e y c o nc e pt: Out o f c ha ra c te r with its surro unding s.

 Unduly a dve rse ? T

hre e fa c to rs:

 Vio la te s c le a r, writte n, c o mmunity sta nda rd

inte nde d to pre se rve the a e sthe tic s o r sc e nic b e a uty o f the a re a .

 Ge ne ra lly a va ila b le mitig a ting ste ps whic h a

re a so na b le pe rso n wo uld ta ke to impro ve the ha rmo ny o f the pro je c t with its surro unding s.

 Sho c king a nd o ffe nsive to the a ve ra g e pe rso n.

 Sig nific a ntly info rme d b y the o ve ra ll so c ie ta l

b e ne fits o f the pro je c t.

248 Crite ria

slide-13
SLIDE 13

Syste m Sta b ility a nd Re lia b ility

 § 248(b )(3)  “Will no t a dve rse ly a ffe c t syste m sta b ility

a nd re lia b ility.”

 Ne t Me te ring :

 PSB Rule 5.100 Appe ndix A se ts o ut

re q uire me nts fo r syste ms up to 150 kW.

 Othe r pro je c ts:

 PSB Rule 5.500 I

nte rc o nne c tio n Pro c e dure s

 Cha lle ng e : se e ing a numb e r o f pro po se d

pro je c ts tha t will c re a te vo lta g e flic ke r.

248 Crite ria

slide-14
SLIDE 14

Ove rvie w o f the 248 Pro c e sse s

248 Pro c e sse s

Ne t Me te ring

  • nly

15 kw Re g istra tio n

Ne t Me te ring

  • nly

150 kW Applic a tio n

Ne t Me te ring

  • nly

500 kW Pe titio n 248(j) Re ne wa b le s up to 2.2 MW F ull 248 Pro c e ss

L e a st Pro c e ss Mo st Pro c e ss

slide-15
SLIDE 15

Ne t Me te ring Pro c e sse s

 Syste ms ≤ 15 kW sola r:

 Re g istra tio n F

  • rm to PSB, PSD, a nd utility o nly.

 10 da y c o mme nt pe rio d. I

f no c o nc e rns ra ise d, CPG is de e me d issue d o n 11th da y.

 Rule 5.110(A)

 Syste ms ≤ 150 kW

 Applic a tio n F

  • rm to PSB, PSD, a nd utility. I

f fa c ility is no t

  • n e xisting struc ture , the n a c o py must g o to ANR, lo c a l

pla nning c o mmissio n, munic ipa l le g isla tive b o dy, a ll a djo ining la nd o wne rs.

 10 da y c o mme nt pe rio d fo r fa c ilitie s o n e xisting

struc ture s; 30 da ys fo r g ro und mo unte d fa c ilitie s.

 Sub je c t to minimum se t b a c k re q uire me nts: 40 fe e t fro m

munic ipa l hig hwa y, 25 fe e t fro m pro pe rty b o unda ry. §248(s).

 Rule 5.110(B).

248 Pro c e sse s

slide-16
SLIDE 16

Ne t Me te ring Pro c e sse s

 Syste ms up to 500 kW (up to 5 MW in spe c ia l c a se s).

 45 da y pre -filing no tic e pe rio d to PSB, PSD, ANR,

a djo ining pro pe rty o wne rs, utility, munic ipa l le g isla tive b o die s, munic ipa l a nd re g io na l pla nning c o mmissio n.

 F

ile pe titio n, inc luding e xhib its a nd te stimo ny with c o py to PSD, ANR, utility, a nd lo c a l a nd re g io na l pla nning c o mmissio n. No tic e o f filing to munic ipa l le g isla tive b o dy a nd a djo ining pro pe rty o wne rs.

 21 da y c o mme nt pe rio d.  Sub je c t to minimum se t b a c k re q uire me nts: 100 fe e t

fro m munic ipa l hig hwa y, 50 fe e t fro m pro pe rty b o unda ry. §248(s).

 Rule 5.110(C).

 Syste ms > 500 kW sub je c t to re g ula r 248 pro c e sse s 248 Pro c e sse s

slide-17
SLIDE 17

§ 248(j) Pro je c ts o f L imite d Size a nd Sc o pe

 E

xpe dite d re vie w o f c e rta in pro je c ts o f limite d size & sc o pe tha t do no t ra ise sig nific a nt issue s w/ r/ t § 248 c rite ria

 Bo a rd ma y issue Orde r witho ut ho lding pub lic

  • r e vide ntia ry he a ring s, b ut Bo a rd will first

issue no tic e o f the pro po se d pro je c t a nd CPG to a numb e r o f sta te a g e nc ie s a nd to the munic ipa l a nd re g io na l pla nning c o mmissio ns a nd munic ipa l le g isla tive b o dy (e ntitie s liste d a t § 248(a )(4)(C)).

 28 da y c o mme nt pe rio d fro m da te o f Bo a rd’ s

no tic e .

248 Pro c e sse s

slide-18
SLIDE 18

Re ne wa b le E ne rg y Pro je c ts Up T

  • 2.2 MW

 § 8007(b ) Orde r o f 8/ 31/ 2010  Pe titio ne rs c a n re q ue st tha t the no tic e a nd

he a ring re q uire me nts o f § 248 b e mo difie d o n a c a se -b y-c a se b a sis. Pe titio ne r ha s b urde n o f de mo nstra ting why mo dific a tio n is ne c e ssa ry a nd a ppro pria te .

 I

f no mo dific a tio n g ra nte d, the n sa me pro c e ss a s full 248 re vie w.

248 Pro c e sse s

slide-19
SLIDE 19

T he F ull 248 Re vie w

248 Pro c e sse s

Notice Filing Pre- hearing conference

Site visit Public Hearing

Discovery Evidentiary Hearings Briefs Decision

slide-20
SLIDE 20

T he F ull 248 Re vie w: No tic e

 Pro c e ss g o ve rne d b y § 248 a nd PSB Rule

5.400.

 45 Da y pre -filing no tic e to munic ipa l a nd

re g io na l pla nning c o mmissio ns a nd munic ipa l le g isla tive b o die s.

 Co py o f a pplic a tio n to a numb e r o f sta te

a g e nc ie s a nd to the munic ipa l a nd re g io na l pla nning c o mmissio ns a nd munic ipa l le g isla tive b o dy.

248 Pro c e sse s

slide-21
SLIDE 21

T ha nk yo u

Co nta c t:

Je a nnie .o live r@ ve rmo nt.g o v