paxocean group
play

PAXOCEAN GROUP Corporate Presentation 30 September 2017 Kuok Group - PowerPoint PPT Presentation

PAXOCEAN GROUP Corporate Presentation 30 September 2017 Kuok Group Worldwide Group History & Milestone Acquisition of PaxOcean PaxOcean completed 67% of DDW SEA Engineering Zhuhai conversion of and by Kuok Group, was formed by


  1. PAXOCEAN GROUP Corporate Presentation 30 September 2017

  2. Kuok Group Worldwide

  3. Group History & Milestone Acquisition of PaxOcean PaxOcean completed 67% of DDW SEA Engineering Zhuhai conversion of and by Kuok Group, was formed by delivered Semi- and renamed Kuok (Singapore) Submersible and DDW-PaxOcean Limited and Accommodation Asia Guangdong Yuexin Vessel (POSH Xanadu) Ocean Engineering 2007 Sep 2012 Dec 2014 2011 Jul 2014 2016 PaxOcean Zhoushan PaxOcean Graha Rebranding of yard started operation the 6 shipyards successfully and welcomed first as the PaxOcean completed 15 th Jack Up COSL 942 for Group Jack-Up Rig drydocking

  4. Yard Locations Zhoushan, China PaxOcean Zhuhai Zhuhai, China PaxOcean Zhoushan PaxOcean Singapore Singapore Batam, Indonesia PaxOcean Pertama PaxOcean Graha PaxOcean Nanindah

  5. PaxOcean Group Structure Kuok Singapore Limited Holdings Pte Ltd (PHPL) Marketing & Commercial CENTRALIZED PaxOcean Engineering (Singapore) Engineering & Procurement Design PaxOcean PaxOcean PaxOcean PaxOcean PaxOcean PaxOcean Singapore Nanindah Graha Pertama Zhuhai Zhoushan Singapore Batam Batam Batam China China 1) Newbuilding 1) O&G and 1) Newbuilding 1) Shiprepairs & 1) Newbuilding 1) Newbuilding Offshore Conversion Activities 2) Shiprepairs & 2) Rig building 2) Shiprepairs & Conversion Conversion

  6. Operating Structure CLIENT ENT SINGLE POINT OF CONTACT  Personal Attention to Ship Owner  Flexibility in Adapting to Changing Needs SINGAPORE BATAM CHINA YARD YARDS YARDS Marketing Engineering Procurement Commercial

  7. PaxOcean Singapore - Location Changi Airport Travelling time from Airport : approx. 45 mins by road

  8. PaxOcean Singapore – Yard Layout 2 3 1 Floating Dock DOCK LENGTH WIDTH TLC Total Area: 110,000 m 2 No. 1 122 M 22 M 3,400 No. 2 195 M 34 M 16,000 Docking up to Handymax-Sized Vessels No. 3 187 M 36 M 16,000 Afloat repairs up to Panamax-Sized Vessels

  9. PaxOcean Batam – Location SINGAPORE Harbourfront Terminal Singapore 45 mins ferry ride BATAM, INDONESIA Sekupang Ferry Terminal Batam Pertama Graha Nanindah

  10. PaxOcean Pertama – Yard Layout Floating Dock DOCK LENGTH WIDTH TLC No. 1 97 M 24 M 3,200 Total Area: 272,000 m 2 No. 2 186 M 36 M 16,000 Dock V 235 M 40 M 22,000 Docking up to Panamax-Sized Vessels Afloat repairs up to VLCC-Sized Vessels

  11. PaxOcean Graha – Yard Layout Building Berths 3 nos. 80 M x 80 M Total Area: 495,000 m 2 2 nos. 170 M x 50 M Berth 455 M Equipment Mobile cranes up to 1,250 T

  12. PaxOcean Nanindah – Yard Layout Total Area: 546,000 m 2

  13. PaxOcean Zhoushan – Yard Layout Total Area: 800,000 m 2 Graving Dock DOCK LENGTH WIDTH Central 400 M 106 M West 380 M 80 M

  14. PaxOcean Zhuhai – Yard Layout Covered Launchways LAUNCHWAY LENGTH WIDTH Total Area: 200,000 m 2 No. 1 210 M 27 M No. 2 210 M 27 M No. 3 100 M 38 M

  15. Core Activities Newbuilding  Successful delivery of Jack-up drilling Rigs, Liftboats, OSVs (AHTS, PSVs, Multi- purpose Offshore Support Vessels, Pipe Lay Heavy Lift Construction Vessels, Subsea Support Vessels), Tugs as well as Commercial Vessels Tankers, Cement Carriers and Bulk Carriers. Conversions  Offers innovative and cost-effective fast-track conversions. Past conversion projects include Livestock Carriers, Compact Semi-submersible Accommodation Vessels, Cable Laying Barges, Offshore Support Vessels, Tankers and FPSOs. Ship Repairs  Vast experience in the repairs of Dredgers, Capesize Bulk Carriers, LPG Tankers, Chemical / Product Tankers, Ro-Ro Vessels, Seismic / Heavylift vessels, Hopper Barges, Cement Carriers, Offshore Support Vessels and Jack-up Drilling Rigs.

  16. Newbuilding ASD Tugs AHTS PSV OSV Floating Dock “Transko Bangau” 3,200 BHP ASD Tugs “ Hmagat ” 3,000 BHP ASD Tug

  17. Newbuilding ASD Tugs AHTS PSV OSV Floating Dock “POSH Persistence” 12,000 BHP DP2 AHTS “Pacific Discovery” 17,800 BHP DP2 AHTS

  18. Newbuilding ASD Tugs AHTS PSV OSV Floating Dock “Greatship Vidya ” 12,240 BHP DP2 AHTS “ Lewek Fulmar” World’s First Rolls Royce UT788CD, 400T BP / 23,500 BHP / DP2 / 93.4m + FiFi 1 AHTS

  19. Newbuilding ASD Tugs AHTS PSV OSV Floating Dock “POSH Jaeger” 3,000 DWT 78M DP2 PSV “Hellespont Dione ” 3,250 DWT PSV

  20. Newbuilding ASD Tugs AHTS PSV OSV Floating Dock “OSA Sampson” 180m DP3 Offshore Construction Vessel “Derwent” DP3 Well-Intervention Semi-submersible Offshore Vessel

  21. Newbuilding ASD Tugs AHTS PSV OSV Floating Dock “ Heungwoo FD 22000” 20,000 TLC Floating Dock

  22. Newbuilding Jack-Up Rigs “Haven” “CJ46” Self Elevating & Propelling Offshore Unit (DP2) Jack Up Drilling Rig

  23. Newbuilding Jack-Up Rigs “Naga 3” Jack Up Drilling Rig “JB117” Self Elevating Jack Up Rig

  24. Newbuilding Tankers Carriers “Transko Arafura” 3,500 LT DWT Product Tanker “Untied Axel” 16,000 DWT Chemical Tanker

  25. Newbuilding Tankers Carriers “Pac Seginus ” 27,700 DWT Bulk Carrier “Pac Cekap ” 500TEU Cellular Container Deckship

  26. Newbuilding Tankers Carriers “Endeavor” 30,000 DWT Cement Carrier “Ocean Swagman” 8000m 2 Livestock Carrier

  27. Conversions “Delta Prince” Conversion of Crane Pontoon to “ Ulisse ” Geotextile Laying Pontoon Conversion of Flat Top Barge to Cable Lay Barge

  28. Conversions “POSH Bawean ” Conversion of Container Feeder Vessel to Offshore Accommodation Vessel “ Awassi Express” Conversion of Container Ship to enclosed livestock carrier for 75,000 sheep

  29. Conversions “Rodolfo Mata” Conversion of Container Ship to Livestock Carrier for 125,000 sheep “East Fortune” Conversion of Tanker to FPSO

  30. Conversions “Tasmanian Achiever” “Crete Cement” Upgraded and Lengthened a 152m Ro-Ro Vessel Conversion of 97m General Cargo Vessel to Self-Discharging Cement Carrier

  31. Conversions “Leighton Mynx ” Conversion of Working Barge to 200-man Accommodation Barge “Willem De Vlamingh ” Upgrading of Stone Dumping Vessel

  32. Ship Repairs Offshore Supply Other Vessel Seismic & Tankers Bulkers Container Vessel Vessel Heavylift Type

  33. Delivering LNG Solutions Transportation 3,500 m 3 LNG Carrier FLNG 7,500 m 3 LNG Carrier 8,000 m 3 LNG Carrier 15,000 m 3 LNG Carrier Liquid to Gas Solutions 15,000 m 3 FSRU Floating 25,000 m 3 FSRU Power Plants 30,000 m 3 FSRU Liquid to Power Solutions 60 MW 100 MW 140 MW 200 MW 250 MW

  34. Delivering LNG Solutions LNG Carriers FSRU Floating Power Plants 7,500 m 3 LNG Carrier  Main Dimensions : ‒ L.O.A.: 108.0 m ‒ Breadth: 19.2 m ‒ Depth: 10.5 m ‒ Design Draft: 6.0 m  Tank Capacity: LNG: 7,500 m 3 ‒ Ballast Water: 1,800 m 3 ‒  Power & Performance: ‒ Main Engines: 1 x 3000kW (approx.) ‒ Design Speed: 14.0 kts, 6.0 m draft, 90% MCR

  35. Delivering LNG Solutions LNG Carriers FSRU Floating Power Plants 26,000 m 3 Small Scale FSRU  Main Dimensions : ‒ L.O.A.: 149.9 m ‒ Breadth: 31.0 m ‒ Depth: 12.5 m  Characteristics of Storage Tank : Capacity: 6,500 m 3 ‒ ‒ Tank: 4 Independent Type-C Tank

  36. Delivering LNG Solutions LNG Carriers FSRU Floating Power Plants 100MW & 140MW  Main Dimensions : ‒ L.O.A.: 86.0 m ‒ Breadth: 37.4 m ‒ Depth: 6.0 m ‒ Draft: Approx. 3.0 m ‒ Gas Turbine Generator: 2 x 54 MW ‒ Steam Turbine Generator: 1 x 49 MW 200MW LNG Storage  Main Dimensions : ‒ L.O.A.: 169.7 m ‒ Breadth: 44.0 m ‒ Depth:15.0 m ‒ Draft: Approx. 6.5 m ‒ LNG Tank Capacity: 26,000 m 3 ‒ Regas Capacity: 2 x 17.5 mmscfd ‒ Gas Turbine Generator: 3 x 54 MW ‒ Steam Turbine Generator: 1 x 49 MW ‒ Heat Recovery Steam Generator: 3 x OTSG, 80/7 bar

  37. Group Achievements NEWBUILDING 600 Vessels and Barges Across major vessel classes, including 15 Jack up Rigs and Liftboats Drilling Jack-Up Barge Jack-Up Rig L209 CJ46 “Aurora V” “Ocean Swagman” 56m RoRo/Passenger Ship 8,000m2 Livestock Carrier

  38. Group Achievements CONVERSIONS Successfully delivered 46 Conversions “Geo Natuna” “Posh Arcadia” Supply Vessel to Seismic Vessel Conversion to 750-man Semi-submersible accommodation vessels “Sea Good 101” “Pearl River” Tanker to FPSO Lengthening of Vessel

  39. Group Achievements Repaired over 2000 Vessels Avg. 270 vessels per year REPAIRS “COSL 942” “Rio Illapel ” Jack Up Drilling Rig 47,020 DWT Vehicle Carrier CSAV “Pearl River” “Ore Brasil” “Leiv Eiriksson” Lengthening of Vessel 400,000 DWT VLOC Heavy Dredger

  40. Our Commitment All the PaxOcean Shipyards are Certified to International Quality and Safety Standards ISO9001:2008 OHASA18001:2008 ISO14001:2004 Singapore is a three-time awarded recipient.

  41. Our Clientele

  42. Thank You www.paxocean.com PaxOcean Group Corporate Office : No. 1 Kim Seng Promenade #07-02 Singapore 237994 Tel : (65) 6737 7300 Email : marketing@paxocean.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend