part 21 design organisation approval doa implementation
play

Part 21 Design Organisation Approval (DOA) Implementation Workshop - PowerPoint PPT Presentation

Part 21 Design Organisation Approval (DOA) Implementation Workshop Industry 29-30 November 2011 RHEIN/RUHR/ERFT Conference Rooms, Hermann Pnder Strae 1 Kln Germany Part 21 DOA Implementation Workshop (Industry) Investigation and


  1. Part 21 Design Organisation Approval (DOA) Implementation Workshop Industry 29-30 November 2011 RHEIN/RUHR/ERFT Conference Rooms, Hermann Pünder Straße 1 Köln – Germany

  2. Part 21 DOA Implementation Workshop (Industry) Investigation and Surveillance of Organisations performing Software and Airborne Electronic Hardware activities Alexandra Florin and Fernando S alazar 29-30 November 2011 LVR (Horion House), Köln, Germany

  3. Table of content Background DO Working Group No. S21/ 2010-01 DOA Working Instruction Status Case 1: Development of SW/ CEH Case 2: Integration of equipment containing SW/ CEH 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 3

  4. Background (1/ 2) Context: Always more complex design in the Large Aircrafts and Engines fields. Constant increase of use of “glass cockpit” in General Aviation airplanes. Potential risk: Not sufficient control in the development or in the installation of Software (SW) and Airborne Electronic Hardware (AEH). 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 4

  5. Background (2/ 2) Two main questions raised: Are Design Organisations capable and sufficiently 1. aware of the SW and/ or AEH related requirements when exercising their DOA privileges? Are DOA Team Leaders capable and sufficiently 2. aware when assessing Design Organisations: developing SW and/ or AEH, or installing equipment containing SW and/ or AEH ? 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 5

  6. DO Working Group No. S21/ 2010-01 Subject: Assessment of DOA in the field of software and complex electronic hardware. Objectives: Define a work instruction for the initial investigation and continued surveillance of DOA capability in the field of software and airborne electronic hardware, to ensure consistent and harmonized approach. Define a way to perform an initial assessment of existing DOAs in order to update, if necessary, the surveillance plan with this topic. 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 6

  7. DOA Work Instruction - Status DOA internal Work Instruction is approved. Initial assessment has started. DOAs will be approached by the DOA Team Leaders to obtain related information: Procedures Design Changes (statistical data) . 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 7

  8. DOA Work Instruction – Case 1: Development of SW/ CEH (1/ 2) In the case of DO developing SW / CEH , several subjects will be reviewed, for instance: 1. Organisational structure, including subcontractors, and definition of responsibilities 2. Related procedures and resources 3. Development, Certification and Quality processes Requirement management, safety assessment, tools, • configuration management, ... 4. SW/ CEH CVE function 5. Change process Classification criteria, … • 6. Occurrence Reporting Open problem reports, … • 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 8

  9. DOA Work Instruction – Case 1: Development of SW/ CEH (2/ 2) Following the initial assessment, specific procedures reviews, sampling or audits may be organised. This assessment could result in: update to existing procedures, additional training to CVEs and/ or SW Quality Assurance staff, modifications of the Terms of Approval, for instance by the introduction of limitations. An example of limitation could be: “The development of software is limited to  Software Level D or E.” 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 9

  10. DOA Work Instruction – Case 2: Equipment containing SW/ AEH (1/ 3) In the case of DO installing ETSO articles , procedures related to system integration issues will be reviewed, e.g.: 1. The determination of the level of the SW/ AEH contained in the ETSO equipment being installed, as part of the showing of compliance with CS-xx.1309. 2. The verification that the Development Assurance Level of the ETSO article declared in the DDP is in line with the level of the SW/ AEH (determined as per point 1). 3. The assessment of the agreed deviations as a result of the ETSO qualification. Avionics examples 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 10

  11. DOA Work Instruction – Case 2: Equipment containing SW/ AEH (2/ 3) In the case of DO installing non-ETSO articles , procedures related to system integration issues will be reviewed, e.g.: 1. The determination of the level of the SW/ AEH contained in the non-ETSO equipment being installed by the Design Organisation, as part of the showing of compliance with CS-xx.1309. 2. The endorsement by a SW/ AEH CVE of the CS-xx.1309 compliance documents to be provided by the equipment supplier and proving that the SW/ AEH was developed according to the level of the SW/ AEH determined as per point 1. . 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 11

  12. DOA Work Instruction – Case 2: Equipment containing SW/ AEH (3/ 3) Following the initial assessment, specific procedures reviews, sampling or audits may be organised. This assessment could result in actions for the DO holder, for instance: update to existing procedures, additional training to CVEs. 29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry) 12

  13. Any Questions? Thank you!

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend