Part 21 Design Organisation Approval (DOA) Implementation Workshop - - PowerPoint PPT Presentation

part 21 design organisation approval doa implementation
SMART_READER_LITE
LIVE PREVIEW

Part 21 Design Organisation Approval (DOA) Implementation Workshop - - PowerPoint PPT Presentation

Part 21 Design Organisation Approval (DOA) Implementation Workshop Industry 29-30 November 2011 RHEIN/RUHR/ERFT Conference Rooms, Hermann Pnder Strae 1 Kln Germany Part 21 DOA Implementation Workshop (Industry) Investigation and


slide-1
SLIDE 1

Part 21 Design Organisation Approval (DOA) Implementation Workshop

29-30 November 2011 RHEIN/RUHR/ERFT Conference Rooms, Hermann Pünder Straße 1 Köln – Germany

Industry

slide-2
SLIDE 2

Investigation and Surveillance

  • f Organisations performing

Software and Airborne Electronic Hardware activities

Alexandra Florin and Fernando S alazar

Part 21 DOA Implementation Workshop (Industry)

29-30 November 2011 LVR (Horion House), Köln, Germany

slide-3
SLIDE 3

3

Table of content

Background DO Working Group No. S21/ 2010-01 DOA Working Instruction

Status Case 1: Development of SW/ CEH Case 2: Integration of equipment containing SW/ CEH

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

slide-4
SLIDE 4

4

Background (1/ 2)

Context:

Always more complex design in the Large Aircrafts and Engines fields. Constant increase of use of “glass cockpit” in General Aviation airplanes.

Potential risk:

Not sufficient control in the development or in the installation of Software (SW) and Airborne Electronic Hardware (AEH).

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

slide-5
SLIDE 5

5

Background (2/ 2)

Two main questions raised:

1.

Are Design Organisations capable and sufficiently aware of the SW and/ or AEH related requirements when exercising their DOA privileges?

2.

Are DOA Team Leaders capable and sufficiently aware when assessing Design Organisations: developing SW and/ or AEH,

  • r installing equipment containing SW and/ or

AEH?

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

slide-6
SLIDE 6

6

DO Working Group No. S21/ 2010-01

Subject:

Assessment of DOA in the field of software and complex electronic hardware.

Objectives:

Define a work instruction for the initial investigation and continued surveillance of DOA capability in the field of software and airborne electronic hardware, to ensure consistent and harmonized approach. Define a way to perform an initial assessment of existing DOAs in order to update, if necessary, the surveillance plan with this topic.

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

slide-7
SLIDE 7

7

DOA Work Instruction - Status

DOA internal Work Instruction is approved. Initial assessment has started. DOAs will be approached by the DOA Team Leaders to obtain related information:

Procedures Design Changes (statistical data).

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

slide-8
SLIDE 8

8

DOA Work Instruction – Case 1:

Development of SW/ CEH (1/ 2)

In the case of DO developing SW / CEH, several subjects will be reviewed, for instance:

  • 1. Organisational structure, including subcontractors, and

definition of responsibilities

  • 2. Related procedures and resources
  • 3. Development, Certification and Quality processes
  • Requirement management, safety assessment, tools,

configuration management, ...

  • 4. SW/ CEH CVE function
  • 5. Change process
  • Classification criteria, …
  • 6. Occurrence Reporting
  • Open problem reports, …

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

slide-9
SLIDE 9

9

Following the initial assessment, specific procedures reviews, sampling or audits may be

  • rganised.

This assessment could result in:

update to existing procedures, additional training to CVEs and/ or SW Quality Assurance staff, modifications of the Terms of Approval, for instance by the introduction of limitations.

An example of limitation could be:

“The development of software is limited to

  • Software Level D or E.”

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

DOA Work Instruction – Case 1:

Development of SW/ CEH (2/ 2)

slide-10
SLIDE 10

10

DOA Work Instruction – Case 2:

Equipment containing SW/ AEH (1/ 3)

In the case of DO installing ETSO articles, procedures related to system integration issues will be reviewed, e.g.:

  • 1. The determination of the level of the SW/ AEH contained in

the ETSO equipment being installed, as part of the showing of compliance with CS-xx.1309.

  • 2. The verification that the Development Assurance Level of

the ETSO article declared in the DDP is in line with the level of the SW/ AEH (determined as per point 1).

  • 3. The assessment of the agreed deviations as a result of the

ETSO qualification.

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

Avionics examples

slide-11
SLIDE 11

11

In the case of DO installing non-ETSO articles, procedures related to system integration issues will be reviewed, e.g.:

  • 1. The determination of the level of the SW/ AEH contained in

the non-ETSO equipment being installed by the Design Organisation, as part of the showing of compliance with CS-xx.1309.

  • 2. The endorsement by a SW/ AEH CVE of the CS-xx.1309

compliance documents to be provided by the equipment supplier and proving that the SW/ AEH was developed according to the level of the SW/ AEH determined as per point 1.

.

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

DOA Work Instruction – Case 2:

Equipment containing SW/ AEH (2/ 3)

slide-12
SLIDE 12

12

Following the initial assessment, specific procedures reviews, sampling or audits may be

  • rganised.

This assessment could result in actions for the DO holder, for instance:

update to existing procedures, additional training to CVEs.

29 - 30.11.2011 Part 21 DOA Implementation Workshop (Industry)

DOA Work Instruction – Case 2:

Equipment containing SW/ AEH (3/ 3)

slide-13
SLIDE 13

Thank you! Any Questions?