7/13/2020 Rhyolite Ridge Project Esmeralda County, Nevada Presenter: Myles Grotbo 1 Outline of Presentation NewFields Overview Ioneer Exploration and Baseline Studies Quarry Layout and Buckwheat Avoidance Other Successful


  1. 7/13/2020 Rhyolite Ridge Project Esmeralda County, Nevada Presenter: Myles Grotbo 1 Outline of Presentation  NewFields Overview  Ioneer Exploration and Baseline Studies  Quarry Layout and Buckwheat Avoidance  Other Successful Buckwheat Protection Plans | 2 2 1

  2. 7/13/2020 NewFields Overview  Consulting scientists and engineers  Nevada offices in Reno, Elko  Provided a variety of services to Ioneer since 2018  Involved in resource drilling, baseline studies, botanical support, permitting, and engineering design for Rhyolite Ridge | 3 Draft/Confidential/Privileged. Settlement Confidential and Subject to FRE 408 3 Ioneer Exploration and Baseline Studies  30,000 feet of core drilling (to characterize the resource) completed by Ioneer 2018 - 2019  Multidisciplinary baseline studies completed in the area to support permitting efforts 2016 - 2020  Specific efforts made to avoid harming TBW during the field efforts: Emphasized during tailgate safety meetings   Drill locations planned to avoid mapped TBW locations Angled drill holes used to reduce the number of drill pads   No impacts to TBW occurred due to Ioneer’s field studies | 4 Draft/Confidential/Privileged. Settlement Confidential and Subject to FRE 408 4 2

  3. 7/13/2020 Proposed Quarry Layout  Ioneer altered original development plan to avoid TBW Population 3 (P3)  Performed extensive evaluation of other potential TBW avoidance measures  Complete avoidance of TBW impractical from engineering and practicality standpoints | 5 Draft/Confidential/Privileged. Settlement Confidential and Subject to FRE 408 5 Buckwheat Avoidance Analysis 1 Performed technical and cost  evaluations  Concluded unsafe for workers and the buckwheat communities Structural reinforcement  determined to be unproven and cost-prohibitive 3 2 | 6 Draft/Confidential/Privileged. Settlement Confidential and Subject to FRE 408 6 3

  4. 7/13/2020 Other Successful Buckwheat Protection Plans  Management Plan for the Steamboat Buckwheat. Washoe County, NV. 2005.  Lower Colorado River Multi-Species Conservation Program: Sticky Buckwheat Habitat Conservation Plan. Sacramento, CA. 2004. Carbonate Habitat Management Strategy for Cushenbury Buckwheat . San  Bernardino National Forest, CA. 2003. The Clark County Multiple Species Habitat Conservation Plan (includes Las  Vegas Buckwheat). Clark County, NV . 1996. | 7 Draft/Confidential/Privileged. Settlement Confidential and Subject to FRE 408 7 4

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.