or62 vila s roa d
play

OR62 Vila s Roa d I nte rc ha ng e Are a Ma na g e me nt Pla n - PowerPoint PPT Presentation

OR62 Vila s Roa d I nte rc ha ng e Are a Ma na g e me nt Pla n (I AMP) T AC Me e ting Pre se nte d b y: K a tie Bro wn July 17, 2018 Background Analysis Results Conclusions 2 Ba c kg ro und OR62 & Vila s Ro a d I nte rc ha


  1. OR62 – Vila s Roa d I nte rc ha ng e Are a Ma na g e me nt Pla n (I AMP) T AC Me e ting Pre se nte d b y: K a tie Bro wn July 17, 2018

  2. Background Analysis Results Conclusions 2

  3. Ba c kg ro und OR62 & Vila s Ro a d I nte rc ha ng e 3

  4. 4

  5. 5

  6. JTA Build Full Build 6

  7. Sc e na rio De finitions • No Build/ No -mitig a tio n (NBNM) • Ba se Co nditio ns • No I nte rc ha ng e • JT A Build, 2-la ne Vila s Rd • T ie r 1 Pro je c ts inc lude d 7

  8. No- build/ No- mitig a tion 8

  9. Sc e na rio De finitions • No Build Mitig a te d (S0T 1) • NBNM with mitig a tio ns a tte mpting to me e t v/ c , L OS, a nd MML OS sta nda rds • Sig na ls a dde d whe n PSW me t • No Build Mitig a te d with T ie r 2 pro je c ts (S0T 2) • S0T 1 with T ie r 2 Pro je c ts 9

  10. CL H a nd CL A No Mitig a tio ns Mitig a te d 10

  11. T a ble Roc k Roa d & Vila s Roa d No Mitig a tio ns Mitig a te d 11

  12. Biddle Roa d & Ha mric k Roa d No Mitig a tio ns Mitig a te d 12

  13. RVMPO RT P T ie r 2 Pro je c ts Within Study Are a Project No. Location Project Type Proposed Project Description Upgrade to minor collector standard including Peace Ln – Vilas Rd Urban one lane in each direction, bike lanes, and 626 to City Limits Upgrade sidewalks Construct new minor collector roadway Lear Way - Vilas Rd New (includes one lane each 628 to northern city Roadway direction, bike lane, and sidewalk) limits Widen to major arterial standard including two- Vilas Rd – Table lanes in each direction, center turn-lane, bike 632 Rock to eastern Widening lanes, and sidewalks UGB Re-align Crater Lake Ave to the east and install Crater Lake Ave & I39 Intersection traffic signal Vilas Rd Monitor needs after construction of Crater Lake Crater Lake Highway I40 Intersection Highway Bypass & Vilas Rd Install traffic signal or roundabout when I44 Vilas Rd & Lear Way Intersection warranted Vilas Rd & Industry Install traffic signal or roundabout when I43 Intersection 13 Dr warranted

  14. RVMPO RT P T ie r 2 Pro je c ts in Mo de l Runs Outside Dire c t Study Are a Project Location Project Type Proposed Project Description No. Construct new major arterial International Wy – Vilas to New 629 roadway (includes center turn-lane, Coker Butte Roadway bike lane, and sidewalk) Construct new major collector Springbrook Rd - Coker New roadway (includes center turn-lane, 630 Butte to Vilas Rd Roadway bike lane, and sidewalk) Construct new minor collector East-West collector- CLH to New roadway (includes one lane each 631 Eastern UGB between Coker direction, bike lane, and sidewalk) Roadway Butte and Vilas Rd 14

  15. Inc lude d in a ll sc e na rios be yond NBNM Current Geometry Lear Way Crater Lake Hwy Crater Lake Ave Analyzed Geometry 15

  16. Inc lude d in a ll sc e na rios be yond NBNM Current Geometry Analyzed Geometry 16

  17. Pe a c e L a ne a nd Airwa y Drive F unc tio na l Are a Ana lysis Ac c o mmo da te Ne c e ssa ry E le me nts? 17

  18. F unc tiona l Ar e a E le me nts Upstre a m 18

  19. F unc tiona l Ar e a E le me nts Do wnstre a m 19

  20. F unc tiona l Ar e a Ana lysis I nput Re sults • F o ur la ne Vila s Ro a d sc e na rio s no t fe a sib le • T wo la ne Vila s Ro a d sc e na rio s o nly fe a sib le fo r “fa milia r drive rs” whe re re a c tio n dista nc e = 0 fe e t. T HE RE F ORE 400 fe e t is NOT suffic ie nt to a c c o mmo da te ne c e ssa ry • Ac c e le ra tio n • Re a c tio n dista nc e • L e g a l turn sig na l dista nc e o f 100’ re q uire d b y the OR Ve hic le Co de • De c e le ra tio n 20

  21. Sc e na rio De finitions • JT A Build o r F ull Build with o r witho ut T ie r 2 Pro je c ts a nd: • T wo o r fo ur thro ug h-la ne Vila s Ro a d • T ig ht Dia mo nd o r Ro unda b o ut 21

  22. T ig ht Dia mond Inte rc ha ng e Crater Lake Highway Inset of Interchange Lear Way 22

  23. Rounda bout Inte rc ha ng e 23

  24. RVMPO v4.2 T ra ve l De ma nd Mode l 2040 Vo lume De ve lo pme nt 24

  25. 2015 Design Hour Volumes NORTH 3 NO SCALE 3 126 237 404 141 106 222 379 409 35 253 66 268 1 2 116 646 167 51 141 424 389 15 288 40 419 303 2 631 500 1 61 35 10 318 15 10 101 45 10 5 TPAU OREGON DEPARTMENT OF TRANSPORTATION TRANSPORTATION PLANNING ANALYSIS UNIT File : OR62-Vilas Prepared By: Katie Brown OR62 & Vilas Rd IAMP 2015 Design Hour Volumes (DHV) FIGURE 4 Date : 6/5/17 Reviewed By: , P.E.

  26. 10 9 NORTH NO SCALE 11 15 10 22 26 25 33 50 10 9 4 4 278 71 2015 Design Hour Volumes 293 25 1035 116 141 227 1217 66 86 217 TPAU OREGON DEPARTMENT OF TRANSPORTATION TRANSPORTATION PLANNING ANALYSIS UNIT File : OR62-Vilas Prepared By: Katie Brown OR62 & Vilas Rd IAMP 2015 Design Hour Volumes (DHV) FIGURE 4 Date : 6/5/17 Reviewed By: , P.E.

  27. Scenario 0: 2040 No Interchange, Mitigated NORTH NO SCALE 3 10 3 315 130 175 645 205 300 515 610 <5 545 10 90 10 495 95 45 <5 60 1020 755 85 2 <5 105 825 140 140 200 470 30 125 755 1 970 255 345 90 45 245 <5 585 340 <5 210 420 735 240 <5 545 2 105 1 <5 TPAU OREGON DEPARTMENT OF TRANSPORTATION TRANSPORTATION PLANNING ANALYSIS UNIT File : OR62-Vilas Prepared By: Katie Brown OR62 & Vilas Rd IAMP 2040 Design Hour Volumes (DHV) FIGURE 1 Date : 2/5/18 Reviewed By: , P.E.

  28. Scenario 0: 2040 No Interchange, Mitigated Scenario 0: 2040 No Interchange NORTH 4 430 45 NO SCALE 360 50 930 320 295 760 245 180 210 260 12 13 4 12 935 13 845 <5 50 30 140 20 15 115 165 80 325 270 90 285 110 100 170 TPAU OREGON DEPARTMENT OF TRANSPORTATION TRANSPORTATION PLANNING ANALYSIS UNIT File : OR62-Vilas Prepared By: Katie Brown OR62 & Vilas Rd IAMP 2040 Design Hour Volumes (DHV) FIGURE 2 Date : 2/5/18 Reviewed By: , P.E.

  29. Ana lysis Re sults Ca pa c ity Que uing Cra sh Multimo da l L OS Ove ra ll Simula tio n MOE 29

  30. Sta nda rds/ T a rg e ts for v/ c by Inte rse c tion Standard/Target Intersection ODOT (V/C Ratio) Local OHP HDM V/C Ratio LOS OR62 0.85 0.75 NA NA Vilas Rd & Table Rock Rd NA NA 0.90/0.95 D Vilas Rd & NA NA 0.95 D Airway Dr/Peace Ln Vilas Rd & Lear Wy NA NA 0.95 D Vilas Rd & Crater Lake Hwy 0.85 0.75 NA D Vilas Rd & Crater Lake Ave NA NA 0.95 D Table Rock Rd & Biddle Rd NA NA 0.90/0.95 D Biddle Rd & Hamrick Rd NA NA 0.90 D 30

  31. Ana lysis Re sults Ca pa c ity • All ma inline fre e -flo w se g me nts, ra mps, & me rg e / dive rg e se c tio ns me e t HDM v/ c sta nda rds • OR62 NB no rth o f inte rc ha ng e slig htly e xc e e ds sta nda rds o JT A Build, 2-L a ne Vila s Rd, T ie r 1 o JT A Build, 4-L a ne Vila s Rd, T ie r 1 31

  32. Ana lysis Re sults Ca pa c ity • I nte rse c tio ns c o nsiste ntly o ve r c a pa c ity: • Ha mric k Rd & T a b le Ro c k Rd with Biddle Rd • Build sc e na rio s lo we r v/ c & L OS b ut still do NOT me e t sta nda rds • T a b le Ro c k Rd & Vila s Rd 32

  33. Ana lysis Re sults Ca pa c ity No- Build/ No- Mitigation Sc e nar io: • AL L unsig na lize d inte rse c tio ns o ve r c a pa c ity with L OS F 33

  34. Ana lysis Re sults Ca pa c ity - Ro unda b o uts Scenario v/c LOS Critical Movement Major / Minor NB Ramps S1T1R 0.87 / 0.44 E / C WB / NB S2T1R 1.51 / 0.62 F / D WB / NB S3T1R 0.87 / 0.50 D / D EB / NB S4T1R 1.11 / 0.71 F / E WB / NB S1T2R 0.80 / 0.79 C / F EB / NB S2T2R 0.98 / 0.94 E / F EB / NB S3T2R 0.77 / 0.53 C / D EB / NB S5T2R 0.94 / 0.69 F / E WB / NB SB Ramps S1T1R 1.06 / 1.66 F / F EB / SB S2T1R 1.27 / >2.0 F / F EB / SB S3T1R 0.89 / 1.43 D / F EB / SB S4T1R 1.10 / >2.0 F / F EB / SB S1T2R 0.98 / 1.63 F / F EB / SB S2T2R 1.16 / >2.0 F / F EB / SB S3T2R 0.81 / 1.01 C / F EB / SB S5T2R 0.99 / 1.48 F / F EB / SB 34

  35. Ana lysis Re sults 425’ NORTH Queuing 3 NO SCALE 550’ Scenario 0: No Build No Mitigations 275’ 725’ 625’ 1575’ 1425’ 2 3575’ 1 Queue Length Queue Blocks Upstream Intersection 775’ 350’ 3050’ TPAU OREGON DEPARTMENT OF TRANSPORTATION TRANSPORTATION PLANNING ANALYSIS UNIT File : OR62-Vilas Prepared By: Katie Brown OR62 & Vilas Rd IAMP 95 th Percentile Queue Lengths FIGURE J-1 Scenario 0: No Build No Mitigations Date : 5/9/18 Reviewed By: P. Schuytema, P.E.

  36. Scenario 0: No Build No Mitigations >825’ NORTH NO SCALE 450’ 525’ 5700’ 700’ 10 11 >3025’ 12 13 4 25’ 75’ 50’ 1275’ 100’ 600’ 2600’ >1000’ Queue Length Queue Blocks Upstream Intersection >4550’ TPAU OREGON DEPARTMENT OF TRANSPORTATION TRANSPORTATION PLANNING ANALYSIS UNIT File : OR62-Vilas Prepared By: Katie Brown OR62 & Vilas Rd IAMP 95 th Percentile Queue Lengths FIGURE J-2 Scenario 0: No Build No Mitigations Date : 5/9/18 Reviewed By: P. Schuytema, P.E.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.