Nyrstar Port Pirie
10th GMUSG and SACOME Resource Industry Conference and Trade Expo
September 2014
future
1
Nyrstar Port Pirie 10 th GMUSG and SACOME Resource Industry - - PowerPoint PPT Presentation
Nyrstar Port Pirie 10 th GMUSG and SACOME Resource Industry Conference and Trade Expo September 2014 future 1 Our History Nyrstar Port Pirie Smelter - 125 Years of Operations 1880 1897 1988 2001 2002 2006 Nyrstar formally announces
September 2014
1
Nyrstar Port Pirie Smelter - 125 Years of Operations
2
2
1880 1897 1988 2001 2006 2002 Nyrstar formally announces major Redevelopment of the Port Pirie Smelter expected to cost $514M with commissioning in 2016. 05/14
Our History
3
Our Business Model
4
Nyrstar Operating Locations – Geographically diverse multi-asset footprint
Mines/Streaming Metals Processing Other Operations 1 Campo Morado, Mexico 11 Auby, France 18 Fohl (Interest 50%), China 2 Cotonga, Peru 12 Balen/Overpelt, Belgium 19 Genesis (Interest 50%), China 3 Coricancha, Peru 13 Budel, The Netherlands 4 El Mochito, Honduras 14 Clarkesville, USA Development 5 El Toqui, Chile 15 Hobart, Australia 20 Herencia (Interest 10.03%), Chile 6 Langlois, Canada 16 Hoyanger, Norway 21 Ironbark Zinc Ltd (Interest 26%), Greenland 7 Myra Falls, Canada 17 Port Pirie, Australia 8 Pucarrajo, Peru 9 Talvivaara (Streaming Agreement), Finland 10 Tennessee Mines (USA)
Where We Operate
5
Our Markets
6
Redeveloping Port Pirie for a Sustainable future
Fundamentally different business model for Port Pirie; transformed operation capable of processing a wider range
ABILITY TO PROCESS ALL INTERNALLY GENERATED RESIDUES, ALLOWING NYRSTAR TO CONTROL APPROXIMATELY 50% OF FEED MATERIAL REQUIREMENTS, DRIVES FINANCIAL RETURNS AND SIGNIFICANTLY REDUCES SUPPLY RISK
PRIMARY LEAD SMELTER POLY-METALLIC PROCESSING & RECOVERY CENTRE
Third party produced feed materials
PORT PIRIE
Hobart smelter residue Other material 3rd party lead concentrates
Nyrstar produced feed materials
Nyrstar Zinc Smelters residues
PORT PIRIE
Other material 3rd party lead concentrates Third party residues Complex waste streams E-waste Nyrstar mine concentrates
7
Redeveloping Port Pirie for a Sustainable future
sinter plant with a state of the art
smelting furnace technology and new sulphuric acid plant.
core technology utilised at over 25 sites.
investments to capture additional metal streams.
EBS Oxidation Furnace (Top Submerged Lance)
The application of fully enclosed bath smelting technology has a range of environmental benefits
8
Redeveloping Port Pirie for a Sustainable future
dust and sulphur dioxide emissions
exposure risks
movements on-site and therefore reduce
performance
EXPECTED TO DELIVER A SIGNIFICANTLY IMPROVED ENVIRONMENTAL PERFORMANCE THROUGH REDUCED EMISSIONS
9
Redeveloping Port Pirie for a Sustainable future
A NEW TARGETED LEAD ABATEMENT PROGRAM WILL INITIATE AND MANAGE COMMUNITY LEAD EXPOSURE REDUCTION INITIATIVES
Nyrstar
SA Government
10
Redeveloping Port Pirie for a Sustainable future OUTLINE PROJECT TIMEFRAME OUTLINE PROJECT STRUCTURE Senior VP Metals Processing & Chief Development Officer Michael Morley Vice President Metals Refining Bertus De Villiers General Manager Redevelopment Andrew Napier
‒ Running existing asset ‒ Ensure policies, procedures & standards compliance ‒ Joint responsibility to manage technology transition ‒ Project management and execution ‒ Functional reporting to Project Steering Committee ‒ Manage global engineering contractor ‒ Joint responsibility to manage technology transition
REDEVELOPMENT LED BY A DEDICATED GENERAL MANAGER, SUPPORTED BY A PROJECT TEAM COMPRISING EXPERIENCED AND HIGHLY SKILLED INTERNAL AND EXTERNAL RESOURCES
Project
Port Pirie Transformation website ‒ http://www.portpirietransformation.com
‒ info@portpirietransformation.com
Industry Capability Network, South Australia ‒ http://www.icn.org.au/sa_home
11
Redeveloping Port Pirie for a Sustainable future
12
Redeveloping Port Pirie for a Sustainable future