Nuclear Browns Ferry Nuclear Plant Filtering Strategies January 9, 2013 Preston Swafford, Executive Vice President and Chief Nuclear Officer Tennessee Valley Authority Discussion Points Nuclear TVA Post-Fukushima Strategy TVA FLEX


slide-1
SLIDE 1

Nuclear

Browns Ferry Nuclear Plant Filtering Strategies

January 9, 2013 Preston Swafford, Executive Vice President and Chief Nuclear Officer Tennessee Valley Authority

slide-2
SLIDE 2

Discussion Points

2

Nuclear

  • TVA Post-Fukushima Strategy
  • TVA FLEX Initiatives
  • TVA Containment Vent Approach
slide-3
SLIDE 3

TVA Post-Fukushima Strategy

3

Nuclear

  • TVA Planning Began in March 2011
  • Key Elements of Strategy

– Prevent Fuel Damage – Maintain Containment Integrity – Prevent Widespread Land Contamination

  • TVA Strategy Elements Are Consistent with

Industry Objectives

slide-4
SLIDE 4

TVA FLEX Initiatives

4

Nuclear

  • Increase Coping Time

– Extend DC Power Availability – Provide Additional Installed Robust AC

Power and Pumping Capacity

– Minimize Plant Staff Burden on

Implementation

– Maximize Onsite Resources

slide-5
SLIDE 5

TVA FLEX Initiatives

5

Nuclear

  • Increase Coping Time (Continued)

– Extend DC Power Availability

  • Protected 200 KVA Diesel Generators
  • Rapid Connection to Battery Chargers
slide-6
SLIDE 6

TVA FLEX Initiatives

6

Nuclear

  • Increase Coping Time (Continued)

– Additional Onsite AC Generating

Capacity

  • Install 3MW Diesel Generator Per Unit
  • Flexible Power Distribution Design
  • Protected in Hardened Bunker

Building

slide-7
SLIDE 7

TVA FLEX Initiatives

7

Nuclear

  • Increase Coping Time (Continued)

– Additional Onsite Pump Capacity

  • Portable 5000 gpm Pump Per Unit
  • Spare 5000 gpm Pump Per Site
  • Capable of Vessel Injection or Drywell

Spray

– Emergency Operating Instruction

Changes

slide-8
SLIDE 8

TVA FLEX Initiatives

8

Nuclear

  • Increase Coping Time (Continued)

– Integrated Approach with NFPA 805

Solution

  • Installation of Additional Installed

Injection System Per BFN Unit

  • “Motorized” RCIC System
  • Capable of Being Powered by

Installed AC or Fukushima DGs

slide-9
SLIDE 9

TVA FLEX Initiatives

9

Nuclear

  • TVA Coping Summary

– A robust coping approach provides a

diverse and flexible means to prevent fuel damage and maintain containment.

– EOI improvements will guide operators in

use of robust coping tools.

slide-10
SLIDE 10

TVA Containment Vent Approach

10

Nuclear

  • TVA Tier 1 Reliable Hardened Vent

– Separate Vent Header Per Unit – Reliability Enhancements Included – Design Provides Footprint for Potential

Future Filter Installation

– Drywell Vent Will Be Included in Design

  • TVA is Exploring Filter Design Options
slide-11
SLIDE 11

TVA Containment Vent Approach

11

Nuclear

  • TVA Evaluation of Dry Filters

– Robust Coping Strategy Implemented

Using Improved EOIs Will Significantly Reduce Likelihood of Severe Accident

– TVA Determining Potential Insights of

Source Term More Representative of “Delayed” or “Disrupted” Coping Strategy

– Simple Dry Filter Design May Integrate

Better With Robust Coping Strategy

slide-12
SLIDE 12

TVA Post-Fukushima Strategy

12

Nuclear

  • TVA Perspective on SECY 12-0157

– TVA is Interested in Timely Incorporation

  • f Fukushima Lessons Learned

– TVA Prepared for Timely Implementation

  • f Performance Based Approach to

Containment Vent Filter Issue

slide-13
SLIDE 13

List of Acronyms

13

Nuclear

  • AC

Alternating Current

  • BFN

Browns Ferry Nuclear Plant

  • BWROG

Boiling Water Reactor Owner’s Group

  • DC

Direct Current

  • EOI

Emergency Operating Instruction

  • FLEX

Diverse and Flexible Coping Strategy

  • GPM

Gallons Per Minute

  • NFPA

National Fire Protection Association

  • RCIC

Reactor Core Isolation Cooling

  • TVA

Tennessee Valley Authority