www.nigerdeltabudget.org Outline MTEF Projections for FGNs 2019 to - - PowerPoint PPT Presentation

nigerdeltabudget org outline
SMART_READER_LITE
LIVE PREVIEW

www.nigerdeltabudget.org Outline MTEF Projections for FGNs 2019 to - - PowerPoint PPT Presentation

NDEBUMOGS PRESENTATION FOR CSJS 2019 BUDGET SUMMIT , ABUJA, 5 TH -6 TH MARCH, 2019 By: Dr. George-Hill Anthony Executive Director/CEO Niger Delta Budget Monitoring Group www.nigerdeltabudget.org Outline MTEF Projections for FGNs


slide-1
SLIDE 1

NDEBUMOG’S PRESENTATION FOR CSJ’S 2019 BUDGET SUMMIT , ABUJA, 5TH-6TH MARCH, 2019

By: Dr. George-Hill Anthony

Executive Director/CEO Niger Delta Budget Monitoring Group

www.nigerdeltabudget.org

slide-2
SLIDE 2

Outline

  • MTEF Projections for FGN’s 2019 to 2021 Budget
  • Distinct Summary of FGN’s 2019 Budget Proposal
  • Non Oil Revenue Projections 2019 (MTEF)
  • Other Federally Funded Upstream Projects
  • Projection of Oil Revenues 2018 -2021 (MTEF)
  • Recurrent (Non-Debt) FY 18 and MTEF 2019-2021
  • Graphical Analysis of 2017 Appropriation Act (Environment)
  • Graphical Analysis of 2017 Appropriation Act (Min of Niger Delta)
  • Sectoral budgetary trend (Niger Delta and Environment) 2017, 2018 and 2019 proposal.
  • Environment and Niger Delta Envelope (Capital) 2019
  • Non Oil Revenue Projection 2019 (MTEF)
  • Related Allocations for the Niger Delta, etc
  • Comparative analysis for some line items on environment 2017-2018
  • Some Fed Ministry of Environment Proposed Line Items for 2019
  • Climate change as a time-bomb
  • Niger Delta’s development conundrum
  • Our concerns
  • Recommendations (Niger Delta)
  • Recommendations (Environment)
  • Conclusion
slide-3
SLIDE 3

MTEF Projections for FGN’s 2019 to 2012 Budget

7,165,869,994,451 6,966,989,049,631 6,091,274,668,042 6,961,500,917,208 2,998,862,437,251 3,688,282,600,552 3,331,045,693,399 3,886,826,300,613 31,247,078,652 39,889,887,640 37,536,384,270 37,582,922,472 1,170,985,667 1,288,084,234 1,375,443,767 1,469,466,808 1,384,931,578,205 1,385,541,128,141 1,809,253,848,038 2,016,943,284,244 794,688,449,303 799,517,317,863 1,142,851,778,618 1,290,442,726,235 207,512,890,147 229,339,263,648 250,244,316,670 273,688,604,246 324,859,497,742 302,551,098,964 329,201,132,104 358,197,959,172 57,870,741,012 54,133,447,666 86,956,620,646 94,613,994,592 2018 Budget (As Passed) 2019 Proj. 2020 Proj. 2021 Proj.

MTEF PROJECTIONS FOR FGN BUDGET 2019-2021

AMOUNT AVAILABLE FOR FGN BUDGET AMOUNT AVAILABLE FOR FGN BUDGET Share of Oil Revenue AMOUNT AVAILABLE FOR FGN BUDGET Share of Dividend (NLNG) AMOUNT AVAILABLE FOR FGN BUDGET Share of Minerals & Mining AMOUNT AVAILABLE FOR FGN BUDGET Share of Non-Oil AMOUNT AVAILABLE FOR FGN BUDGET Share of CIT AMOUNT AVAILABLE FOR FGN BUDGET Share of VAT AMOUNT AVAILABLE FOR FGN BUDGET Share of Customs AMOUNT AVAILABLE FOR FGN BUDGET Share of Federation Acct. Levies

slide-4
SLIDE 4

Distinct Summary of FGN’s 2019 Budget Proposal

2,287,987,405,933 265,509,285,492 324,644,693,748 1,160,416,279,596 652,915,780,857 492,360,342,965 2,264,014,113,091 1,378,788,677,233

DIstinct Summary of FGN's 2019 Budget Proposal

021 MAIN ENVELOP - PERSONNEL 022 MAIN ENVELOP - OVERHEAD 023 CRF CHARGES - PENSIONS AND GRATITUTIES 024 CRF CHARGES - SERVICE WIDE VOTES 025 CRF CHARGES - CAPITAL SUPPLEMENTATION 026 STATUTORY TRANSFERS 027 DEBT SERVICES 031 CAPITAL DEVELOPMENT FUND MAIN

slide-5
SLIDE 5

Non Oil Revenue Projection 2019 (MTEF)

1,731,805,088,710 1,732,429,578,279 2,467,498,242,893 2,782,715,670,520 1,414,410,608,814 1,474,585,477,415 2,144,502,451,437 2,413,016,857,829 254,912,855,860 233,923,000,863 289,927,666,342 332,490,208,288 44,612,633,903 17,641,300,000 12,210,441,587 13,739,318,121 1,543,994,718,357 1,703,893,330,714 1,859,436,879,988 2,033,873,543,494 2,500,000,000 2,500,000,000 2,500,000,000 2,500,000,000 848,531,734,297 790,975,327,856 922,830,346,414 1,004,094,510,063 720,229,459,577 670,958,816,016 730,043,248,207 794,330,637,784 594,206,513,619 603,862,934,414 657,038,923,386 714,897,574,005 119,420,651,362 60,386,293,441 65,703,892,339 71,489,757,401 6,602,294,596 6,709,588,160 7,300,432,482 7,943,306,378 128,302,274,720 120,016,511,840 192,787,098,207 209,763,872,279 305,000,000,000

  • 17,868,990,133

6,279,800,000 20,857,683,527 23,469,286,282

2018 Budget (As Passed) 2019 Proj. 2020 Proj. 2021 Proj.

NON-OIL REVENUE (MTEF PROJECTION)

Corporate Tax Companies Income Tax NLNG Tax Stamp Duties Value-Added Tax Surcharge on Luxury Items Customs Main Federation Account Import Excise Fees Special levies (Federation Account) Tax Amnesty - VAIDS Capital Gains Tax

slide-6
SLIDE 6

Other Federally Funded Upstream Projects

535,824,000,000 585,911,754,297 1,573,145,664,852 1,375,348,986,788

  • 124,623,000,000

129,625,000,000 266,048,450,000 61,663,222,500 823,500,000 823,500,000 915,000,000 915,000,000 107,878,500,000 29,813,401,719 41,478,370,706 41,913,320,454 49,135,500,000

  • 61,000,000,000

61,000,000,000 6,862,500,000 6,862,500,000 10,086,350,000 11,248,400,000 90,036,000,000 30,286,500,000 32,177,500,000 34,190,500,000

  • 141,215,000,000

68,250,852,578 165,310,000,000 165,310,000,000 305,000,000,000 981,237,245,703 981,237,245,703 15,250,000,000 15,250,000,000 14,892,748,443 17,871,298,132

2018 BUDGET (AS PASSED) 2019 PROJ. 2020 PROJ. 2021 PROJ.

Other Federally Funded Upstream Projects

Other Federally Funded Upstream Projects National Domestic Gas Development Gas Infrastructure Development Brass LNG Gas Supply Projects Frontier Exploration Services (NFES) EGTL Funding Renewable Energy Development (RED) Pipeline Security & Maintenance Cost Nigerian Crude Oil Finger Printing Pre-Export Financing PMS Under-Recovery Crude Oil Pre-Export Inspection Agency Expenses (NESS)

slide-7
SLIDE 7

Projection on Oil Revenues 2018 -2021 (MTEF)

1,222,759,527,202 90,692,728,169 249,065,341,168 380,001,457,865 320,000,000,000

  • 183,000,000,000

1,590,448,580,635 670,978,748,837 90,841,200,000 5,343,600,000 503,285,031,797 320,000,000,000

  • 1,977,287,110,917

468,183,839,964 80,241,488,620 215,963,033,340 892,898,748,992 320,000,000,000

  • 2,089,409,934,582

518,041,809,913 78,767,205,558 418,246,689,989 754,354,229,123 320,000,000,000

  • PROFIT FROM

CRUDE OIL & GAS SALES NNPC JV CRUDE OIL & GAS (PROFIT OIL) MCA CRUDE OIL & GAS (PROFIT OIL) EF CRUDE OIL & GAS (PROFIT OIL) PSC CRUDE OIL & GAS (PROFIT OIL) PSC CRUDE OIL & GAS (NEW TERMS) SC CRUDE OIL & GAS (PROFIT OIL) FORWARD SALE

PROJECTION ON OIL REVENUE (2018-2021)

2018 Budget (As Passed) 2019 Proj. 2020 Proj. 2021 Proj.

slide-8
SLIDE 8

Recurrent (Non-Debt) FY 18 and MTEF 2019-2021

3,512,677,902,076 2,115,467,388,700 246,486,583,989

  • 241,950,173,668

193,339,376,271 300,434,379,448 65,000,000,000 4,718,039,438,458 2,287,987,405,905 160,504,766,016 265,509,285,492 159,145,947,296

  • 504,388,747,211

151,402,049,347 363,050,424,848 65,000,000,000 51,219,751,964 359,831,060,380 4,690,824,744,571 2,402,386,776,200 166,434,138,437 246,486,583,989 163,354,957,010

  • 473,002,144,160

59,438,777,103 431,766,127,602 65,000,000,000 51,844,414,914 281,110,825,156 4,915,348,305,592 2,522,506,115,010 171,722,828,635 246,486,583,989 163,218,302,672

  • 473,002,144,160

106,631,974,278 437,779,538,283 65,000,000,000 59,467,445,656 319,533,372,910

  • 1,000,000,000,000 2,000,000,000,000 3,000,000,000,000 4,000,000,000,000 5,000,000,000,000 6,000,000,000,000

RECURRENT (NON-DEBT) PERSONNEL COSTS (MDAS) PERSONNEL COSTS (GOES) OVERHEADS (MDAS) OVERHEADS (GOES) SWV PENSIONS (2018 ONLY) PENSIONS, GRATUITIES & RETIREES BENEFITS SWV POWER SECTOR REFORM PROGRAMME (TRANSFERS TO NBET) OTHER SERVICE WIDE VOTES (INCLUDING GAVI/IMMUNIZATION) PRESIDENTIAL AMNESTY PROGRAMME BASIC HEALTH CARE FUND (1% OF CRF) TANSFERS OF GOES OPERATING SURPLUS (80% OF WHICH IS IN FG INDEPENDENT REVENUES)

Recurrent (Non- Debt)FY 18 and MTEF 2019-2021 2021 Proj. 2020 Proj. 2019 Proj. 2018 Budget (As Passed)

slide-9
SLIDE 9

Graphical Analysis of 2017 Appropriation Act (Environment)

144,222,126,129, 83% 1,886,857,812, 1% 16,108,983,841, 9% 12,479,369,455, 7%

Graphycal Analysis of 2017 Appropriation Act. (Environment)

Personnel Total Overhead Total Recurrent Total Capital

slide-10
SLIDE 10

Graphical Analysis of 2017 Appropriation Act (Min of Niger Delta) 1,081,793,241 727,089,124 1,808,882,365 33,692,500,001

Personnel Total Overhead Total Recurrent Total Capital

Graphical Analysis of 2017 Appropriation Act. (Ministry of Niger Delta)

slide-11
SLIDE 11

Sectoral (Budgetary) Trend (Niger Delta and Environment) 2017, 2018 and 2019 Proposal-Environment

Series1 5,000,000,000 10,000,000,000 15,000,000,000 20,000,000,000 25,000,000,000 30,000,000,000 35,000,000,000 40,000,000,000

Total Allocation 2017 Total Allocation 2018 Total Allocation 2019 (Proposed) 28,588,353,296 35,378,408,624 27,127,413,937

COMPARATIVE ANALYSIS OF ENVIRONMENT'S MINISTRY ALLOCATION 2017, 2018 & (PROPOSAL) 2019

slide-12
SLIDE 12

Sectoral (Budgetary) Trend (Niger Delta and Environment) 2017, 2018 and 2019 Proposal-Niger Delta

35,965,882,366 60,223,997,128 136,789,195,697

Total Allocation 2017 Total Allocation 2018 Total Allocation 2019

NIGER DELTA MINISTRY'S APPROPRIATION 2017,2018 AND 2019 PROPOSAL

slide-13
SLIDE 13

Environment and Niger Delta Envelope (Capital) 2019

39,400,583,997 8,353,238,696

5,000,000,000 10,000,000,000 15,000,000,000 20,000,000,000 25,000,000,000 30,000,000,000 35,000,000,000 40,000,000,000 45,000,000,000

Niger Delta Environment

Environment and Niger Delta Envelope (Capital) 2019

slide-14
SLIDE 14

Related Allocations for Niger Delta, et al.

Amnesty Special Intervention Program (Recurrent) Special Intervention Program (Capital) ZIP

65,000,000,000 35,000,000,000 150,000,000,000 100,000,000,000 WITHIN SERVICE WIDE VOTE (2019 PROPOSAL)

slide-15
SLIDE 15

Comparative Analysis for Some Line Items on Environment 2017-2018 (Here is FY 2017 (Climate Change Related)

  • Ogoni Clean Up -N148,387,837
  • Assessment of impacts, adaptation and vulnerability to climate change to

North East- N8,081,856

  • Commemoration of 2017 World Environment Day- N9m
  • National Policy on Environment- N26,685,000
  • Clean and Green Project- N111,387,837
  • Development a national framework for ecosystem based adaptation-

N51,441,301.

  • Counterpart funding for New map implementation in 12 additional states

(World Bank’s assisted)- N225m

  • Development of Toolkit for establishment of climate Desks/Units in States’

Ministries of Environment/related MDAs-N27,142,089

  • Climate Public expenditure (CPIER) in Nigeria-N23,698,801
slide-16
SLIDE 16

Comparative Analysis for Some Line Items on Environment 2017-2018 (Here is FY 2018 (Climate Change Related)

  • Clean and Green Program (Nationwide)-N31,756,676
  • Upscaling and Digitalization of EIA Registry-N48,403,100
  • Pilot Project on Bio Technological Rehabilitation of Environmental Degraded Sites in the 6

Geopolitical Zones, Phase III-N61,479,850

  • National Council on Environment-N34,800
  • Projects Audit-N83,960,000
  • National Policy on Environment-N15,381,600
  • Building Capacity on Sustainable Environmental Governance-N42,200,000
  • Forest Resources Survey and Assessment (Nationwide)-N48,483,150
  • Establishment of Woodlots in the ARID Zone (Phase 2)-N103,286,491
  • National Implementation of Nigeria’s NDC-N43,932,782
  • UNFCCC COP24 Enabling Activity-N71,650,466
  • Mitigation Effects of Drought and Climate Change-N45,398,206
  • National Framework on Ecosystem and Adaptation-N43,636,591
  • Implementation of a Strategic Sustainable Climate Change and Environmental Advocacy

Program (Phase 2)-N26,236,591

slide-17
SLIDE 17

Comparative Analysis for Some Line Items on Environment 2017-2018 (Here is FY 2018 (Climate Change Related)…Cont’d

  • Communicating Developed National Action Plan and Policy on Climate Change for Multi-sectoral

Adaptation for Green Economy-N7,830,000

  • Climate Public Expenditure and Institutional Review (CPEIR) Process for Nigeria-N22,908,841
  • Critical Support and Capacity Building to Strengthen Links with Climate Change and Research Centres-

N35,734,112

  • Climate Change Mitigation Project for Alternative Energy-N25,670,435
  • Desk/Units in States’ Ministries of Environment and Relevant Agencies-N26,236,591
  • Community Based Waste Management in South East-N99,730,071
  • Community Based Waste Management in North Central and North East-N205,500,000
  • Waste Recycling Facility in South East-N56,550,000
  • Completion of Briquetting Plant with Stove in North Central-N28,710,000
  • Sustainable Management of Selected Critical Wetland and Strengthening of Community Livelihood-

N96,293,416

  • Establishment of Integrated Waste Management Facility (South West)-N26,100,000
  • Development of a National Framework for Ecosystem Based Adaptation-N51,441,301
  • Counterpart Funding for New map Implementation in 12 Additional States (World Bank Assisted)-

N225,000,000

  • Development of Toolkit for Establishment of Climate Change Desk/Units in States’ Ministries of

Environment/Relevant MDAs-N27,141,089

  • Etc
slide-18
SLIDE 18

Some Fed Ministry of Environment Proposed Line Items for 2019

  • Upscaling and Digitalization of EIA Registry-N35m
  • Pilot Project on Bio Technological Rehabilitation of Environmentally Degraded Sites in

the 6 Geopolitical Zones (Phase III)-N70m

  • National Council on Environment-N29,592,000
  • Projects Audit-N73,960,000
  • Monitoring and Evaluation of Ministry’s Projects-N55,133,003
  • Building Capacity on Sustainable Environmental Governance-N44,391,963
  • Forest Resources Survey and Assessment (Nationwide)-N42,222,012
  • Establishment of ACADIA Senegal Plantation in the Frontline States to Arrest Land

Degradation and Mitigate Effects of Drought and Climate Change-N66,460,640

  • Establishment of Woodlots in ARID Zone-N75,244,834
  • West Africa Coastal Areas Mgt (WACA) Project-N40,230,000
  • Afforestation/Reforestation Program (Nationwide)-N208,420,000
  • National Implementation of Nigeria’s NDC-N38,784,279
slide-19
SLIDE 19

Some Fed Ministry of Environment Proposed Line Items for 2019…Cont’d

  • UNFCCC COP24 Enabling Activity-N70,857,893
  • National Framework for Ecosystem Based Adaptation-N34,016,000
  • Implementation of a Strategic Sustainable Climate Change and Environmental Advocacy Program

(Phase II)-N24,984,000

  • Establishment and Capacity Development of Climate Change Desk/Units in States’ Min of Environment

and Relevant MDAs-N44,843,299

  • Critical Support and Capacity Building to Strengthen Links with Climate Change and Research Centres-

N22,060,000

  • Climate Change Mitigation Project for Alternative Energy Production in Agwara LGA, Niger State-

N37,841,496

  • Community Based Waste Mgt in South East-N54,789,988
  • Community Based Waste Mgt in North Central and North East-N205,500,000
  • Waste Recycling Facility (South East)-N47,200,000
  • Establishment of Rice Husk Briquette Plant with Stove in North Central-N28,710,000
  • Sustainable Mgt of Selected Critical Wetland and Strengthening of Community Livelihood-N90,466,846
  • Community Based Waste Mgt Project in South South (Delta State)-N60m
  • Inventorization/Mapping/Closure of Unauthorized Dump Sites in FCT-N40m
  • Community Based Waste Mgt Project (ERGP21132103) in Benue, Kebbi, Borno, Ondo, Anambra,

Bayelsa, Delta, Lagos and Edo State-N80m

  • Others
slide-20
SLIDE 20

Climate Change (as a waiting) Time-bomb

  • Is Climate Change the Biblical (Hellfire) Waiting for Humanity?
  • The answer to the above, could be controversial, depending on religious, intellectual

and cultural sentiment. But eggheads, can balance the trajectory, between development, religion and a sustainably (developed) humanity, which is eluding Africans…

  • How committed is Nigeria to the United Nations Framework and Convention on

Climate Change (UNFCCC)?

  • Is the government proactive on the effects of Climate Change on Food Security, viz a

viz, growing insecurity in the North East and against (mechanized and peasant farmers nationwide? Effects of Climate Change cannot be mitigated by (some) political farmers that are sucking agricultural (value-chain) envelopes, alongside; related propaganda.

  • As the world struggles with extra terrestrial factors, such as, solar outputs, earth sun

geometry and interstellar dust, whilst the Federal Min of Environment grapples with

  • ver a billion naira debt (as unpaid liability to contractors) for projects and

programmes, which NSAs, may not be able to measure its justiciability nor campaign for releases of funds for this Ministry, which considers NSAs/CSOs, as development’s

  • interlopers. The fact is, is this Ministry/Nigeria prepared for oceanic, atmospheric

and communal (land)factors radicality in effects to Climate Change?

slide-21
SLIDE 21

Niger Delta’s Development Conundrum

10,000,000,000 20,000,000,000 30,000,000,000 40,000,000,000 50,000,000,000 60,000,000,000 70,000,000,000 80,000,000,000 90,000,000,000 100,000,000,000

MINISTRY OF NIGER DELTA NDDC 41,600,274,568 95,188,921,129

TOTAL ALLOCATION 2019 FOR NDDC AND MINISTRY OF NIGER DELTA. Note: NDDC is recurrent only

slide-22
SLIDE 22

Niger Delta’s Development Conundrum…Cont’d 1,322,601,448 877,089,123 2,199,690,571 39,400,583,997

TOTAL PERSONNEL TOTAL OVERHEAD TOTAL RECURRENT TOTAL CAPITAL

FEDERAL MINISTRY OF NIGER DELTA ( 2019 GENERAL BREAKDOWN)

slide-23
SLIDE 23

Niger Delta’s Development Conundrum…Cont’d What Are The Projects Proposed in FGN’s Budget for 2019-We Are Sampling Some 2019 (Proposed) Projects Here…

  • In the MNDA’s Budget Proposal for 2019, it’s almost dampening to
  • bserved

this Ministry’s repetition

  • f

(recycled) projects and programmes, which has appeared in the Ministry’s appropriations, from inception of the Ministry, till date. Such are almost @ a billion (cumulative) threshold in the 2019 proposed FGN’s budget. Some of these (recycled) repetitive projects are:

  • Nchia-Afam/Imo River, Idoro-Eaten-Itam, Km 15 Section (III) PHC-Eleme

Junction to Onne Junction Road projects, among others. Bomadi Water Scheme, Ukparam Water Scheme, Ubane- Utanga Water Projects, alongside, Electricity projects @ Okrika, Ogbgbene, Eleme, Khana, etc. Either, earlier allocations/provisions, had no budgetary releases/cash backed up or something is wrong, if earlier allocations had cash releases. We are aware, a times, partial releases could render capital projects/releases nincompoopic. See NDEBUMOG’s position about the above (recycled) projects, as was published on the 8th Day of February, 2012:

  • http://saharareporters.com/2012/02/08/ministry-niger-delta-affairs-

exposition-2009-2010-2011-2012-budgets-how-ministry

slide-24
SLIDE 24

Niger Delta’s Development Conundrum…Cont’d What Are The Projects Proposed in FGN’s Budget for 2019-We Are Sampling Some 2019 (Proposed) Projects Here…

  • Training/empowerment of youth/women in Bayelsa and Delta State-N150m
  • Land Reclamation @ Amadi Ama-N400m
  • Supply of Tricycles-N500m
  • Training of youth in skills acquisition(soap, detergent, pomade making) in

Orlu,Orsu/ON East Fed Constituency, Imo State-N100m

  • Purchase of empowerment material, including tricycles, motorcycles, grinding

machines, generators for Edo “Youth” Senatorial District-N100m

  • Procurement of empowerment materials, which includes: tricycles, grinding

machines and generators for Ondo Central Senatorial District-N100m

  • Skill acquisition/empowerment of displaced women and youth returnees of Bakassi in

Fishery, poultry, detergent making and confectionaries-N82,500,000

  • Construction of modular/mini pilot refinery in one (1) state of the Niger Delta/PPP-

N27,500,000

  • Construction and Supervision of Gberegolor-Ogriagbene Road in Delta State (18.7km)-

N1 billion

  • Housing Units and Infrastructural Facilities in the Niger Delta region-N400m
slide-25
SLIDE 25

Niger Delta’s Development Conundrum…Cont’d What Are The Projects Proposed in FGN’s Budget for 2019-We Are Sampling Some 2019 (Proposed) Projects Here…

  • Construction of Agadagba-Akotogbo-Iyasan-Ovia River Bridge, Irele LGA, Ondo Okitipupa/Irele

Federal Constituency-N2billion

  • Elele-Owerri Road-N77m
  • Shoreline Protection/Land Reclamation of Boatyard Marine Shoreline @ Ikot Abasi Village in AKS-

N2billion

  • Construction of Youth Dev Centre,Benin City-N70m
  • Construction of Community Town Hall, Ogheye Eghotokr, Warri North LGA-N70m
  • Training/Empowerment of Youth and Women in Poultry, Ondo State-N110m
  • Artisan Training of 500 Non-militant Youth on Housing/Agric Industry-N60,500,000
  • Construction of Skill Acquisition Centres with Resident Supervision and Furnishing/Equipping in 9

States of the Niger Delta-N2billion

  • Equipping of Schools in the Niger Delta-N100m
  • Monitoring and Evaluation-N100m
  • Provision of Tricycles to Unemployed Youth in Warri Fed Constituency-N82,500,000
  • Agro Business Entrepreneurial Training and Supply of Start Up Equipment for 500 Participants in

Akoko-Edo-N100m

  • Supply of Fishing Gears for Displaced People of Bakassi-N55m
  • Youth/Women Training/Empowerment in Agric Enterprise for 450 Participants-N82,500,000
  • Youth/Women Empowerment Training in Agric in Ondo State-N96,400,000
slide-26
SLIDE 26

Niger Delta’s Development Conundrum…Cont’d What Are The Projects Proposed in FGN’s Budget for 2019-We Are Sampling Some 2019 (Proposed) Projects Here…

  • Supply of Volkswagen Golf for Youths in Imo East Senatorial District-N100m
  • Supply of Tricycles and Motorcycles for Youths/Women in Imo East Senatorial

District-N100m

  • Supply of Toyota Buses for Youth Empowerment in Imo East Senatorial District-

N100m

  • Training and Provision of Farm Tools to Farmers of Ovie/Sapele Fed

Constituency-N100m

  • Youth/Women Empowerment in Agric at Edo Central Senatorial District-N100m
  • Training and Resettlement of Youth and Women, Odukpani LGA, CRS-N100m
  • Provision of Water Project @ Otueke, Bayelsa State-N55m
  • Owerri Urban Water Scheme-N65m
  • Engagement with Communities in Niger Delta-N100m
  • Niger Delta Climate Change Programme and Disaster Mitigation-N40m
  • Construction of Community Hall at University of Calabar-70m
  • Others
slide-27
SLIDE 27

Our Concerns…(ND)

  • Whilst “Youth and Women Training, Empowerment and Development” are gulping billions in

MNDA’s Budget for 2019. Curiously, we are tempted to ask and ponder, what’s the prerequisite requirements for folks that are to be given these “buses, motorcycles, tricycles” and other “empowerment materials? Assuming, these benefits, are not rewards for ballot box snatching for youths’ that must conquer a senatorial district/federal constituencies for politicians…

  • Even from a desk analysis, it is clear that, this Ministry’s envelopes, do not have needs

assessment components, beside (traditional) alterations and insertions into predicted budgetary formats. What are the justifications for travels, “ and trainings” locally and internationally, if what is going for personnel and overhead, cannot be justified, through bureaucratic (fiscal) restitution?

  • If 60-70% of our youths’ becomes “militants”, tricycles/motorcycle riders and others

are mushrooming among unemployed youths, what’s the percentage of those that will patronize these “tricycles and motorcycles” as passengers, across poverty stricken communities?

  • As (young) peers in developed society are experimenting on electric cars, intelligence robots,

life elongation researches and discovery of (habitable?) planets, whilst (our younger) folks here, are paid to idle away to watch over oil pipelines. What becomes their future (here), when oil becomes irrelevant for those watching over oil pipelines on “security contracts” from the Nigerian State, even as others, among the youths, are “encourage” into tricycles/motorbikes’ survivalism within their productive years…? What becomes of their (predictable?) -non) productive future, viz a viz, comparative development with folks in developed society?

  • Why is every government intervention for the Niger Delta, falling into a patronage

predicament?

slide-28
SLIDE 28

Recommendations (Niger Delta)

  • The solution to the region’s development conundrum are:

❖Political ❖Bureaucratic, and ❖Communal

slide-29
SLIDE 29

Recommendations (Environment)

  • This Ministry, should stop running on environmental antiquated

model and should evolve a new (inclusive) thinking, which encompasses: ➢Government ➢Communities ➢Private Sector ➢Organized Civil Society ➢The academia, and ➢Clustered Cultural/Traditional Territories

slide-30
SLIDE 30

Conclusion

WE THANK YOU!