NeoDrill
Yes, s, we CANTM
TM!
NeoDrill
Yes, we CANTM
TM!
Egypt – Norway Technology days CAN-Technology Presentation
February 13, 2017
www.neodrill.com
NeoDrill Yes, we CAN TM TM ! Egypt Norway Technology days - - PowerPoint PPT Presentation
NeoDrill Yes, s, we CAN TM TM ! NeoDrill Yes, we CAN TM TM ! Egypt Norway Technology days CAN-Technology Presentation February 13, 2017 www.neodrill.com NeoDrill What is a CAN? Yes, s, we CAN TM TM ! CAN = C onductor A nchor N ode
NeoDrill
Yes, s, we CANTM
TM!
Yes, we CANTM
TM!
February 13, 2017
www.neodrill.com
NeoDrill
Yes, s, we CANTM
TM!
What is a CAN?
15.02.2017 Confidential 2
NeoDrill
Yes, s, we CANTM
TM!
The CAN is pre-installed with a DP Work Vessel
3 15.02.2017 Restricted Distribution
Method advantages:
NeoDrill
Yes, s, we CANTM
TM!
15.02.2017 Confidential 4
– Very soft seabeds – Conductor jetting
NeoDrill
Yes, s, we CANTM
TM!
– Conductor Pre-installed in CAN in the workshop
15.02.2017 Confidential 5
NeoDrill
Yes, s, we CANTM
TM!
15.02.2017 Confidential 6
Benefits:
NeoDrill
Yes, s, we CANTM
TM!
– Exploration wells – Production wells
– Shallowest: WD 125 m – Deepest: WD 1 444 m
– Statoil – Eni – Centrica – Lundin – Det Norske – Endeavour UK – OMV
– Norway – UK
15.02.2017 Confidential 7
NeoDrill
Yes, s, we CANTM
TM!
– DP – AHC Crane ≥ 150 ton – Work ROV – Surveying services
recovery campaign will significantly improve cost efficiency
15.02.2017 Confidential 8
NeoDrill
Yes, s, we CANTM
TM!
– CAN: Conductor & Surface Casing – CAN-ductor: Surface casing only
=> CAN is fully reusable!
15.02.2017 Confidential 9
NeoDrill
Yes, s, we CANTM
TM!
15.02.2017 Confidential 10
part of CAN
https://www.youtube.com/watch?v=QKs_3SxqH6k
NeoDrill
Yes, s, we CANTM
TM!
15.02.2017 Confidential 11
Drilling
Drilling On Schedule Start Prod Drilling Late Start Drilling Late Start and Longer Duration SPS & SURF
Planning ‘float’
Conventional field development:
Planning ‘float’ SPS & SURF equipment ‘storage’ time
Main Problem: Rig dependency all through the project!
NeoDrill
Yes, s, we CANTM
TM!
15.02.2017 Confidential 12
Drilling
Drilling On Schedule Start Prod Drilling Late Start Drilling Late Start and Longer Duration Drilling (Start & Duration?) CAN + SPS & SURF Start Prod SPS & SURF
Planning ‘float’
Coupled activities Defined activity start date
Conventional field development: CAN Integrator field development:
Planning ‘float’
Planning Float
Production accel. potential SPS & SURF equipment ‘storage’ time
Reduced Rig dependency simplifies Project Execution!!
NeoDrill
Yes, s, we CANTM
TM!
– Reduced dependence of rig performance – Project risk reduction – Reduced rig scope
– Equipment – Operations – Smaller installation vessels – Integrated protection structure
– Simplified planning and scheduling
15.02.2017 CAN Technology Presentation 13
NeoDrill
Yes, s, we CANTM
TM!
– Operational – Accidental
activities - enables:
– Cost reduction – Accelerated production
15.02.2017 Confidential 14