Namibia Custom Smelters www.dundeeprecious.com The Transaction - PowerPoint PPT Presentation

DU DUNDEE DEE PRECIOUS METALS INC. . TSX - DPM Namibia Custom Smelters www.dundeeprecious.com The Transaction Chelopech concentrate to NCS since 2007 Smelter uniquely positioned and engineered to accept chelo con Recognised


  1. DU DUNDEE DEE PRECIOUS METALS INC. . TSX - DPM Namibia Custom Smelters www.dundeeprecious.com

  2. The Transaction • Chelopech concentrate to NCS since 2007 • Smelter uniquely positioned and engineered to accept chelo con • Recognised potential risks to Chelopech while smelter not in DPM ownership • Smelter acquired March 24, 2010 • $33M cash and shares and settled $17M in third party obligations • Secures Chelopech future with respect to concentrate processing DUNDEE PRECIOUS METALS INC .

  3. The Operation • Combined Ausmelt and Reverb furnace technology • 3 Pierce Smith Convertors • Supplementary oxygen added to Ausmelt • Significant potential capacity in Ausmelt with more oxygen • Off-gas cooling and capture of dust and particulate metals • Blister copper product shipped to European refineries • Arsenic trioxide by-product manufacturing plant • As 2 O 3 shipped to SA and SE Asia DUNDEE PRECIOUS METALS INC .

  4. The Operation • 190 tpd oxygen plant • Waste heat power generation plus connection to national grid • Slag mill for slag recovery of metal in slag • Licensed best practice hazardous waste disposal facility • Ownership of historic tailings and smelter wastes – Govt. granted legal limitation of historic liability – Rehabilitation work started – Some potential opportunity in residual metal values? • Namibian infrastructure generally good DUNDEE PRECIOUS METALS INC .

  5. Production and Capex • 36,000 tonnes primary concentrate processed Q3 2010 (inc. 17k Chelo) • Capex YTD USD 5M • Expected 2010 Capex USD 8M • Expected Capex 2011 USD 20M DUNDEE PRECIOUS METALS INC .

  6. 2010 Focus • Under previous ownership – Facility undercapitalized – Deferred maintenance and environmental controls upgrade – Social license to operate somewhat neglected • 2010 activity since DPM acquisition – Improved community and government relationships – Increased focus on safety, health, environment – Capital into maintenance and urgent environmental improvements • materials handling • gas cooling (additional gas coolers) • dust capture (ongoing bag house upgrades) • Haz waste site – Additional resources applied in operations management and projects – ESIA in preparation – Develop future strategy and project plan DUNDEE PRECIOUS METALS INC .

  7. Future Focus 2011/2012 • Secure the future • Implement “project” strategy to meet production and HSE targets • Best Practice controls on particulate emissions • Reduced fugitive emissions • Increased environmental surveillance and management • Take commercial opportunities and address any risks • Reduce costs and incrementally improve availability and reliability • Increase reliance on Ausmelt technology • Complete sulfur capture and acid production study • Further improvements in community engagement DUNDEE PRECIOUS METALS INC .

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.