Montano De El Dorado Phase I and II Master Plan Draft EIR

El Dorado County Planning Commission Meeting June 25, 2020

20-0786 E 1 of 19

slide-2
SLIDE 2

Overview of Presentation

Provide an overview of the proposed Montano De El Dorado Phase I and II Master Plan and its environmental review process Summary of Draft Environmental Impact Report (EIR) Receive comments on the adequacy of the Draft EIR No consideration or action on the project will occur at today’s meeting.

Draft EIR Presentation 2

20-0786 E 2 of 19

slide-3
SLIDE 3

Overview of Montano De EL Dorado Phase I and II Master Plan

Draft EIR Presentation 3

20-0786 E 3 of 19

slide-4
SLIDE 4

Project Site and Existing Conditions

Located at the southeast corner of the Latrobe Road and White Rock Road Intersection Montano De El Dorado Phase I is developed and consists of 68,500 square feet of commercial uses Phase II (16.8 acres) would be located south of Phase I and is zoned Regional Commercial

Footer Text Here 4

20-0786 E 4 of 19

slide-5
SLIDE 5

Proposed Development

10 commercial and office buildings consisting of approximately 75,400 square feet in Phase II (143,900 total square feet for entire Montano De El Dorado Center) Building/architectural feature heights ranging from 24 to 70 feet above finished grade On-site amphitheater New signalized intersection for new project driveway on Latrobe Road Wall/landscape treatments to buffer from existing residents Off-site wastewater improvements

Draft EIR Presentation 5

20-0786 E 5 of 19

slide-6
SLIDE 6

Site Plan

Footer Text Here 6

20-0786 E 6 of 19

slide-7
SLIDE 7

Architectural Renderings

Draft EIR Presentation 7

20-0786 E 7 of 19

slide-8
SLIDE 8

Architectural Renderings

Draft EIR Presentation 8

20-0786 E 8 of 19

slide-9
SLIDE 9

Proposed Entitlements

Rezone to Regional Commercial-Planned Development Commercial Tentative Parcel Map to create 12 lots Planned Development Permit Conditional Use Permit for outdoor special events in Phase I and Phase II and office uses

Draft EIR Presentation 9

20-0786 E 9 of 19

slide-10
SLIDE 10

Environmental Review Process

Draft EIR Presentation 10

20-0786 E 10 of 19

slide-11
SLIDE 11

What is CEQA?

California Environmental Quality Act (CEQA) Public disclosure process Public participation is essential Avoid or mitigate for environmental impacts Certification of EIR does not indicate approval of project

Draft EIR Presentation 11

20-0786 E 11 of 19

slide-12
SLIDE 12

What is an EIR?

An informational document

  • Discloses information about the effects a proposed project could

have on the environment

  • Identifies mitigation measures
  • Describes feasible alternatives to the proposed project
  • Provides opportunity for public comment
  • Must be certified prior to project approval

Draft EIR Presentation 12

20-0786 E 12 of 19

slide-13
SLIDE 13

What is an EIR? (cont.)

What an EIR Does… Analyzes the environmental effects of the project Discloses information about the effects a project could have

  • n the environment

Identifies mitigation measures Describes feasible alternatives to the proposed project Solicits agency and public input throughout process

Draft EIR Presentation 13

20-0786 E 13 of 19

slide-14
SLIDE 14

What is an EIR? (cont.)

What an EIR Does Not Do… Does not require mitigation for existing environmental conditions Does not advocate for the project under evaluation Does not require project denial due to significant environmental impacts Does not address economic and social issues (e.g., property values)

Draft EIR Presentation 14

20-0786 E 14 of 19

slide-15
SLIDE 15

Environmental Issues Evaluated in the Draft EIR

Aesthetics Air Quality Biological Resources Cultural and Tribal Cultural Resources Energy Geology and Soils Greenhouse Gases Hazards and Hazardous Materials Hydrology/Water Quality Land Use and Planning Noise and Vibration Public Services Traffic and Circulation Utilities and Service Systems Cumulative Impacts

Draft EIR Presentation 15

20-0786 E 15 of 19

slide-16
SLIDE 16

Significant and Unavoidable Impacts in the Draft EIR

Construction noise (Impact 3.10-1) Construction vibration (Impact 3.10-2) Increases in vehicle miles traveled under project conditions (Impact 3.12-1) Increases in vehicle miles traveled under cumulative conditions (Impact 4-14)

Draft EIR Presentation 16

20-0786 E 16 of 19

slide-17
SLIDE 17

Alternatives Considered in the Draft EIR

Alternative 1: No Project – No Development Alternative Alternative 2: Modification of Special Events Alternative Alternative 3: Reduced Development Alternative

Draft EIR Presentation 17

20-0786 E 17 of 19

slide-18
SLIDE 18

Submittal of Comments on the Draft EIR

Direct Written Comments to: El Dorado County Planning and Building Department Planning Division Attn: Tom Purciel 2850 Fairlane Court Placerville, CA 95667 Or e-mail to: montano@edcgov.us Draft EIR comment period ends on Monday July 13, 2020 at 5:00 p.m.

Draft EIR Presentation 18

20-0786 E 18 of 19

slide-19
SLIDE 19

Next Steps in Process

Preparation and release of the Final EIR (Fall 2020) Planning Commission Hearing on Final EIR and project (Late 2020/Early 2021)

  • Make recommendation to Board of Supervisors (Board) on both

project and project Final EIR

Board Hearing (Late 2020/Early 2021)

  • Certify Final EIR
  • Take action on the project

Draft EIR Presentation 19