Modifications to 2012 GMC Straw Proposal January 20, 2011 Timeline - PowerPoint PPT Presentation

Modifications to 2012 GMC Straw Proposal January 20, 2011 Timeline for 2012 GMC Rate Filing Overview Meeting on Meeting on Meeting on of rate cost of billing bill design service determinants comparisons process study Total volumes


  1. Modifications to 2012 GMC Straw Proposal January 20, 2011

  2. Timeline for 2012 GMC Rate Filing Overview Meeting on Meeting on Meeting on of rate cost of billing bill design service determinants comparisons process study Total volumes Impact on Apr & Jun 3 bucket of supply & generators 2010 proposal demand Dec 2010 Oct 2010 Nov 2010 Meeting on phase in of supply & TORs We are here & revenue requirement cap Jan 2011 New GMC File rate Seek board Update structure structure approval of board on & rates with rate rate FERC Jan 2012 structure structure May 2011 March 2011 Feb 2011 Page 2

  3. Guiding Policy and Ratemaking Principles • Cost Causation • Focus on use of ISO services, not market behavior • Transparency • Predictability • Forecastability • Flexibility • Simplicity Page 3

  4. Agenda • Draft Final Proposal – Phase in of Supply to System Operations Charge – Treatment of Transmission Ownership Rights (TORs) – Application of SCID fee – Elimination of Station Power fee – Treatment of MSS Load Following Energy • Items that the ISO will not be modifying • 5 Year Revenue Requirement Cap • Questions and Next Steps Page 4

  5. Phase in of Supply to System Operations Charge • Acknowledge that there are significant bill impacts • Proposing a 3 year phase in plan – Year 1 – Exclude 2/3 of supply MWh from System Operations Charge – Year 2 – Exclude 1/3 of supply MWh from System Operations Charge – Year 3 – No Exclusions Page 5

  6. Phase in of Supply - Impacts • The data below compares the phase in impacts using the same data set of May 2009 to June 2010 Increase over existing GMC (in millions) Class Year 1 Year 2 Year 3 CRR holders $4.1 $4.1 $4.1 IOUs $13.4 $8.6 $5.4 Marketers/ ($12.5) ($11.2) ($10.3) Importers Munis ($1.5) ($2.1) ($2.5) Others ($1.2) ($1.0) ($0.8) (renewables) Suppliers ($2.2) $1.6 $4.1 (internal gen) Page 6

  7. Treatment of Transmission Ownership Rights (TORs) • Current GMC structure gives TORs a discounted rate because of limited ISO services required • ISO is proposing to continue this discount in the new model • Exclude 100% of TOR MWh from Market Services charge code • Only charge the minimum of a TORs supply or demand MWh in the System Operations charge code • A separate rate will need to be created for years 1 and 2 because of the phase in effect to rates Page 7

  8. Application of SCID Fee • Propose to keep SCID fee the same as it is in the current GMC structure (current exclusions will still apply) • $1000 per month if there is settlements activity in that trade month Page 8

  9. Elimination of Station Power Fee • Propose to eliminate the Station Power Fee • The amount is minimal • The costs are included in the System Operations charge Page 9

  10. Treatment of Metered Sub System Load Following Energy • Propose to exclude the MSS Load Following instructed imbalance energy from the Market Services GMC charge • Cost causation impacts of this function are appropriately recovered through the System Operations charge Page 10

  11. Items that the ISO will not be modifying • Unscheduled Energy – There are market rules that already address these uninstructed deviations such as exposure to real time prices and ineligibility for bid cost recovery – UIE will only be charged the System Operations charge, not the Market Services charge Page 11

  12. Items that the ISO will not be modifying • PIRP Forecast Fee – This is being addressed in the ISO’s Renewable Integration Market and Product Review initiative and will be resolved in that stakeholder process – The GMC rate design structure allows for the creation of other fees based on the outcome of other stakeholder initiatives Page 12

  13. Revenue Requirement Cap Proposal • Previous cap was established in 2004 at $195M • Increased to $197M in 2006 and granted one year extensions since then • Propose baseline cap of $197M in 2012 with annual 1% increase starting in 2013 going through 2016 Year Rev Req Cap (in millions) 2012 $197 2013 $199 2014 $201 2015 $203 2016 $205 Page 13

  14. Next Steps • Questions? • Comments due 1/27/11 – Comments to GMC mailbox – gmc@caiso.com Page 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.