Mobile WorkForce Management Utilities Ajay Kaul National Sales Manager, ClickSoftware Mobile Workforce Management & Service Optimization Integrated Mobile Workforce Management lifecycle? 2 1 3 Resource Planning Where am I
Mobile Workforce Management & Service Optimization
3
Integrated Mobile Workforce Management lifecycle?
Demand Forecasting
What is my future demand? Where will it be geographically? How will it be split by work type? What impact will a weather event have? What’s the impact of a capital project? What load will a new contract bring?
1 Resource Planning
Where am I over capacity? Where am I under capacity? What if cross train my Engineers? What if I use sub contractors? What if I recruit more people in a given Region?
2 Shift Rostering
How best do I apply shift patterns against my resource capacity? How do I manage unplanned events? How do I monitor for rule violation (e.g. work and time directives)? How do I allow my employees to check what shifts their working or swap?
3
Scheduling & Optimisation
What resource, with the right skills, in the right location, with the right parts & capital equipment can do the work at the lowest cost and meet the SLA? KEY FUNCTIONALITY; Street level routing, contractor view, short and long duration work manag’t, GPS tracking, continuous real time optimisation
4
Mobile Work Management
What work to I have to do and when? How do I do the work (context sensitive intelligent scripting)? What data do I need to capture? What is the asset history? What is the best route to my next job? How can I automate time sheets?
5 Service Analytics
How do I measure & monitor my KPI’s? How do I tune my job durations? How do I measure individual performance? How do I put this information into a visual format? How do I structure my historical data for my demand forecasting?
6
KEY – Common Data Model
Skill sets, locations, costs, geographic coverage, certification, business structure, etc.
4
Challenges for a Utility?
Infrastructure
- Poor Execution of Planned Maintenance
- Reactive work interfering with planned
activity
- Asset reliability – maintaining for the
lowest cost
- Aging Infrastructure – costly supply
failure & reactive break fix
- Planning & execution of large scale
capital projects (who, when, how, where, with what?)
- Reduction of reactive demand
- Asset tracking /registry accuracy, assets;
missing in system, wrong physical location, right spec but wrong manufacturer, etc
- Regulatory Pressures
Field Operations
- First time fix & minimising job durations;
right skill, lowest cost
- Poor engineer enablement, right
technology and information
- Employee/skills retention
- Need for multi skilled technicians
- Inventory management & tracking
- Lack of performance measurement and
KPI tracking
- Meter Reading
- Vehicle Scheduling, Crew Management
- Environment and Safety compliance
- Vigilance
- Process adherence
Customer Regulator
Application areas across Electric Utilities
Meter Operations Meter Reading Network Maintenance Network Faults & Outages Construction Vigilance Project Teams
Driving Value in Field Services Organizations
Manage Service Costs ■ Reduce overall cost while cost of service are increasing ■ Adapt quickly to changes and seasonal demands ■ Manage SLA’s and penalties ■ Optimized use of assets and resources Increase Resource Utilization and Productivity ■ Manual vs. automated ■ Reduce travel time ■ Leverage existing workforce to service new areas / Technologies efficiently ■ Do more with the same workforce Improve Customer Service ■ Provide faster responses ■ Customer resolution the first time ■ Exceed customer expectations ■ Leverage service as a competitive advantage Visibility & Control ■ Better control and visibility of the resources ■ Optimal usage ■ Manage operational costs ■ Performance management ■ Process Compliance
7
Some Utility Customers
Customer Visits +33% (Antwerpen Water Werks) Jobs per day +48% (Gaz Met Plus) Jobs per day +15% Productivity gains +20% (Direct Energy) Service Revenues +18% (Energy South) Travel time -24% (Anglian Water Services) Dispatch time -50% (Antwerpen Water Werks) Dispatch overhead -70% (Direct Energy) Overtime -22% (Energy South) Service levels +33% (Anglian Water Services) On-site on time arrivals +20% (Energy South) Appointment waiting time -45% Emergency SLA conformity +97% (Scotia Gas Networks) Work order backlog -95% (Anglian Water Services) Jobs reported closed +39% (Anglian Water Services) Increased revenues +20M€ (Scotia Gas Networks)
Increased Revenues Reduced Costs Improved Service Visibility and Control
Proven, Real and Achievable Benefits – The 4 Pillars of ROI
9
Who We Are?
Overview
Leadership
Market leader in workforce management and enterprise mobility Recognized by leading industry analysts such as Gartner, Aberdeen, Info-Tech Blue-Chip customers using ClickSoftware solutions
Fundamentals
- Listed on NASDAQ Global Select (CKSW)
- Market Cap: ~$320M
- Consistent multi-year revenue growth and
cash generation
- 2011 revenues: $87.1 million, 23% y/y
growth
- Utilities constitute more than 30% of our
customers
Global Presence
- Offices in Americas, EMEA, and APAC
- Over 450 employees worldwide
- Eco system of major players, such as
SAP, IBM, Accenture, Infor
- 250+ engagements
- Hundreds of thousands of service
people managed by ClickSoftware solutions every day
10
Case Study: Pacific Gas & Electric Utility
- PG&E is US’s leading natural gas and electric utilities
- Solutions Implemented:
- The Challenges:
- Prioritization of task so that management can view a crew's expected workload over a five-week
period to see the projected utilization rate of future schedules.
- Control & visibility over how crews were utilized across the entire company
- Local strategy across individual offices led to problems as far as achieving crew utilization goals
set by corporate.
- Flexibility to reschedule work/ move crews to new assignments as and when required
- Centralize and consolidate the scheduling process to achieve corporate goals
- The Benefits
- Allows management to have centralized control over scheduling of resources to help ensure
corporate usage goals are met
- Gives management the ability to move resources among service regions to ensure customers
receive gas and electric services efficiently and effectively
- Enables scheduling staff to be consolidated from dispatchers at 67 offices to dispatchers at two
- ffices
- Creates a base scheduling solution that can be easily enhanced with planning, forecasting and
mobile components as business needs change
11
- ETSA Utilities is the fifth largest distributor in the Australian National Electricity Market, serves
758,000 customers, supports a network comprising 393 zone substations and 80,103 km of power lines valued at approximately $2.5 billion. Employing more than 1300 people.
- Solutions Implemented:
- The Challenges:
- Cut down on administration and decrease the time required to get visibility on field resource
activity.
- They recognised the benefits of a centralised scheduler to increase utilisation of their
resources, increase visibility, increase controls, and provide for dynamic adjustments
- The ability to adjust the schedule when items and priorities change. This was a big issue for
ETSA in the past, as one item falling into the schedule meant manual adjustments to at least 10’s of items.
- To manage crews more effectively
- The Benefits:
- Lowered average time per job
- Eliminated 700-job backlog
- Increased productivity leading to more jobs completed per day
- Created single repository for scheduling long – and short-term projects
- Gained better company-wide visibility of workforce management
- Improved prioritization of jobs based on urgency
Case Study: ETSA – South Australia
12
Case Study: Southern California Edison (SCE)
- SCE is one of the California’s largest electric utilities located in Central, Coastal and Southern California
using 2,800 Field Resources
- Solutions Implemented:
- The Benefits
- 360 view of field resource availability
- 360 view of capacity and demands for field resources
- Improved utilization of internal resources
- Improved consistency of scheduling and dispatch processes
- Improved ability to meet customer satisfaction
- Ability to better monitor and manage scheduling costs
- Improved coordination of resources to complete long cycle projects in tandem with short cycle
maintenance requirements