minimum flows and levels and reservations team mflrt
play

Minimum Flows and Levels and Reservations Team (MFLRT) February - PowerPoint PPT Presentation

1 Minimum Flows and Levels and Reservations Team (MFLRT) February 27, 2019 Meeting (Teleconference) Doug Leeper CFWI MFLRT Lead MFLs Program Lead, SWFWMD 2 MFLRT-Requested Model Simulations 2/22 GAT Meeting: Reviewed MFLRT-requested


  1. 1 Minimum Flows and Levels and Reservations Team (MFLRT) February 27, 2019 Meeting (Teleconference) Doug Leeper CFWI MFLRT Lead MFLs Program Lead, SWFWMD

  2. 2 MFLRT-Requested Model Simulations 2/22 GAT Meeting: • Reviewed MFLRT-requested 2003 and 2005 withdrawals develop for 2003 and 2005 withdrawals scenarios that were developed using a peaking factor approach that differs from that used for the 2014RC. • Accepted the approach, with the caveats that the peaking factor approach used for scenario development is documented in the MFLRT technical methods document, acknowledgement is provided that it differs from the peaking factor approach used for the 2014RC (which will be described in the HAT technical methods documentation), and that an alternate “tensioning approach” that has been discussed by the HAT could be used for similar work (e.g., for scenarios such as the 2003 and 2005 withdrawals scenarios) in the future. • Discussed nature and use of MFLRT-requested 50% and 25% withdrawal scenarios. Reviewed partial, preliminary withdrawals for these scenarios and requested review of withdrawals for all available scenarios at 3/01 GAT meeting.

  3. 3 Response to GAT Request – Graphed Withdrawals for Calibration, 2014RC, 50% Reduced and 25% Reduced Scenarios 3,500 • Reduce calibration and 2014RC withdrawals 3,000 shown 2,500 • MGD values include groundwater withdrawals 2,000 only MGD 1,500 Draft 1,000 500 0 Jan-04 Apr-04 Jul-04 Oct-04 Jan-05 Apr-05 Jul-05 Oct-05 Jan-06 Apr-06 Jul-06 Oct-06 Jan-07 Apr-07 Jul-07 Oct-07 Jan-08 Apr-08 Jul-08 Oct-08 Jan-09 Apr-09 Jul-09 Oct-09 Jan-10 Apr-10 Jul-10 Oct-10 Jan-11 Apr-11 Jul-11 Oct-11 Jan-12 Apr-12 Jul-12 Oct-12 Jan-13 Apr-13 Jul-13 Oct-13 Jan-14 Apr-14 Jul-14 Oct-14 calibration REF_2014_RCPF 25% reduced calibration 50% reduced calibration 25% reduced REF_2014_RCPF 50% reduced REF_2014_RCPF

  4. MGD 1,000 1,500 2,000 2,500 3,000 3,500 500 0 Jan-04 Apr-04 Jul-04 Oct-04 Response to GAT Request – Graphed Withdrawals Jan-05 Apr-05 Jul-05 Oct-05 Jan-06 Apr-06 Jul-06 Oct-06 Jan-07 Apr-07 Jul-07 Oct-07 Jan-08 calibration Apr-08 for Calibration, 2014RC Jul-08 Oct-08 Jan-09 Apr-09 REF_2014_RCPF Jul-09 Oct-09 Jan-10 Apr-10 Jul-10 Oct-10 Jan-11 Apr-11 Jul-11 Oct-11 Jan-12 Apr-12 Jul-12 Oct-12 Jan-13 Apr-13 Jul-13 Oct-13 Jan-14 Apr-14 Jul-14 Oct-14 Draft 4

  5. 5 Model Scenario Methods/Issues Update • Simulations for all users: Calibration, 2014RC, 2030 and 2040 withdrawal conditions • MFLRT-specific simulations: – 2014RC_50% (50% reductions in 2014RC withdrawals). Not recommended – 2014RC_25% (25% reductions in 2014RC withdrawals. Not recommended – ECFTX_50% (50% reductions in calibration withdrawals). Recommended – ECFTX_25% (25% reductions in calibration withdrawals). Recommended – 2003 withdrawal conditions (using 2014RC peaking factor approach). – 2005 withdrawal conditions (using 2014RC peaking factor approach). – 2003 withdrawal conditions (using alternative peaking factor approach). – 2005 withdrawal conditions (using alternative peaking factor approach).

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.