KAISER PERMANENTE MEDICAL OFFICE BUILDING at Tysons Corner McLean, Virginia Brooke Helgesen Advisor: Dr. Chimay Anumba Construction Management KAISER PERMANENTE PRESEN SENTATION TION OUTLINE TLINE MEDICAL OFFICE BUILDING Project


  1. KAISER PERMANENTE MEDICAL OFFICE BUILDING at Tysons Corner McLean, Virginia Brooke Helgesen Advisor: Dr. Chimay Anumba Construction Management

  2. KAISER PERMANENTE PRESEN SENTATION TION OUTLINE TLINE MEDICAL OFFICE BUILDING • Project Background at Tysons Corner • Analysis 1-IPD • McLean, Virginia Coffer Design Overview • IPD Case Study • Cost/ Schedule Impact • Analysis 2- Curtain Wall System • System Design • Cost/Schedule Impact • Benefit Analysis • Analysis 3- LED Temp. Lighting • FLEX SLS System • Lighting/ Electrical Breadth • Feasibility Analysis • Analysis 4- Green Roof Terraces • Health Benefit Research • Design Layout Brooke Helgesen • Final Conclusions Advisor: Dr. Chimay Anumba • Acknowledgements Construction Management

  3. KAISE ISER R PERMANENT RMANENTE E MOB at t TY TYSONS ONS CORNER RNER KAISE ISER R PERMANENTE MANENTE MOB at TYSONS ONS CORNER NER Proj oject ect Backg kgrou ound nd McLean, VA McLean, VA Brooke Helgesen Construction Management Brooke Helgesen Construction Management LOCATION TION: Presen entatio tation Outlin ine: 8008 West Park Drive McLean , VA • Project Background • Analysis 1-IPD COST: • IPD Case Study $44,078,649 • Coffer Design Overview • Analysis 2- Curtain Wall System CONSTRUC UCTIO TION DATES: S: • System Design March 16, 2011- May 8, 2012 • Cost/Schedule Impact • Benefit Analysis SIZE: E: • Analysis 3- LED Temp. Lighting Kaiser 241,175 SF • FLEX SLS System Permanente MOB • Lighting/ Electrical Breadth N FUNCT CTION ION: : • Feasibility Analysis Short term care Medical Office Building: • Analysis 4- Green Roof Terraces • Health Benefit Research SCOPE PE OF WORK: • Design Layout Renovation & Construction of Mechanical Tower Addition • Final Conclusions • Acknowledgements

  4. KAISE ISER R PERMANENT RMANENTE E MOB at t TY TYSONS ONS CORNER RNER KAISE ISER R PERMANENTE MANENTE MOB at TYSONS ONS CORNER NER In Inte tegrated rated Proj oject ect Deliver ery McLean, VA McLean, VA Anal alysis ysis 1- IPD PD Brooke Helgesen Construction Management Brooke Helgesen Construction Management Design Bid Build IPD Delegated risk Shared risk Presen entatio tation Outlin ine: • Project Background IPD D vs. DESIGN SIGN-BID BID-BUILD UILD • Analysis 1-IPD Uncertainties not foreseeable Uncertainties more predictable • IPD Case Study • Coffer Design Overview • Analysis 2- Curtain Wall System GOAL: To research and compare the costs and risks GO Hidden costs: increased claims/ disputes, Upfront Cost: Adequate planning • System Design of IPD versus Design Bid Build specifically for the change orders, reputation, etc. minimizes change orders, disputes, etc. • Cost/Schedule Impact • Benefit Analysis coffer design issue on the Kaiser Permanente Project. • Analysis 3- LED Temp. Lighting Limits cooperation, coordination, innovation Promotes teamwork and more ideas • FLEX SLS System • Lighting/ Electrical Breadth • Feasibility Analysis Contract documents are known from the Lack of contract documents that spell • Analysis 4- Green Roof Terraces beginning although not always accurate. out in detail what happens in failed • Health Benefit Research events • Design Layout • Final Conclusions Everyone has their own risk/ goals. Built on trust/ must have good team • Acknowledgements

  5. KAISE ISER R PERMANENT RMANENTE E MOB at t TY TYSONS ONS CORNER RNER KAISE ISER R PERMANENTE MANENTE MOB at TYSONS ONS CORNER NER Ca Case St Study: y: The he H Hou ouse se of of Templ mple e of of Sc Scot otti tish sh Rite McLean, VA McLean, VA Brooke Helgesen Construction Management Brooke Helgesen Construction Management The House of Temple Project: IPD Presen entatio tation Outlin ine: LESS SSONS ONS LEAR ARNE NED D about out IPD: • Project Background $2-3 million: • Analysis 1-IPD Upfront cost • IPD Case Study • Save money & time Putting team Construction Generating Contract Investigation • Coffer Design Overview together (Everyone) “Real” Design (Everyone) • More enjoyable atmosphere • Analysis 2- Curtain Wall System (Owner) (Future-Approx. (Everyone) (1 year) • System Design (1.5 years) 24 months) (Currently) • Prom omotes otes inn nnovat ation on an and ideas as! Price increase 3-4% • Cost/Schedule Impact • Benefit Analysis • Analysis 3- LED Temp. Lighting The House of Temple Project: Design-Bid-Build • FLEX SLS System (Hypothetical) • Lighting/ Electrical Breadth $ 7-8 million: Change • Feasibility Analysis Orders How could this help Kaiser Permanente Project?... • Analysis 4- Green Roof Terraces Bid Phase Design Phase Buyout of Construction • Health Benefit Research (Owner / (Owner/ subcontractors (Owner, Architect, GC, Subcontractors) • Design Layout Architect) Architect) (Owner, (24 months plus time for $7-8 million • Final Conclusions (Approx. 3 (Approx. 1 year ) Architect, GC) worth of change orders) months) • Acknowledgements

  6. KAISE ISER R PERMANENT RMANENTE E MOB at t TY TYSONS ONS CORNER RNER KAISE ISER R PERMANENTE MANENTE MOB at TYSONS ONS CORNER NER Coffer Co r Design ign Ov Overview iew McLean, VA McLean, VA Anal alysis ysis 1- IPD PD Brooke Helgesen Construction Management Brooke Helgesen Construction Management ISSUE: SUE: Fire Rating the Waffle Slab Coffers Presen entatio tation Outlin ine: • Project Background COST T IMPACT CT: • Analysis 1-IPD • Lost labor hours • IPD Case Study • Extra materials • Coffer Design Overview • Analysis 2- Curtain Wall System • Removal/ re-installation • System Design • Repeat inspections • Cost/Schedule Impact Total: al: $250, 0,000 000 • Benefit Analysis • Analysis 3- LED Temp. Lighting SCHEDU HEDULE E IMPACT CT: • FLEX SLS System • Delayed: track installation, MEP overhead, interior wall framing • Lighting/ Electrical Breadth • Coffer production dropped: • Feasibility Analysis • Analysis 4- Green Roof Terraces 25 coffers per day per man to • Health Benefit Research 16 /day/ man • Design Layout Total: al: 5 Month nth Process cess • Final Conclusions • Acknowledgements

  7. KAISE ISER R PERMANENT RMANENTE E MOB at t TY TYSONS ONS CORNER RNER KAISE ISER R PERMANENTE MANENTE MOB at TYSONS ONS CORNER NER Conc Co nclus lusions ions McLean, VA McLean, VA Brooke Helgesen Construction Management Brooke Helgesen Construction Management Presen entatio tation Outlin ine: IPD could have helped to: • Project Background • Analysis 1-IPD • • Better understand severity of coffer IPD Case Study • Coffer Design Overview • Early detection of coffer design issue using IPD design issue • Analysis 2- Curtain Wall System could have saved a: • System Design • Integrate project team early on to • Cost/Schedule Impact 5 m month & $250,000 proces cess increase communication • Benefit Analysis • Analysis 3- LED Temp. Lighting • Allocate accurate amount of money for • FLEX SLS System coffer activity • Lighting/ Electrical Breadth • Feasibility Analysis • Analysis 4- Green Roof Terraces • Health Benefit Research • Design Layout • Final Conclusions • Acknowledgements

  8. KAISE ISER R PERMANENT RMANENTE E MOB at t TY TYSONS ONS CORNER RNER KAISE ISER R PERMANENTE MANENTE MOB at TYSONS ONS CORNER NER Curtain Cu tain Wall l Façade ade Re-desig esign n McLean, VA McLean, VA Brooke Helgesen Construction Management Brooke Helgesen Construction Management Presen entatio tation Outlin ine: SOLUTION UTION PROBLEM BLEM IDENTIFICA ENTIFICATION TION • Project Background • Unforeseen water infiltration from cracks in existing • Analysis 1-IPD • • Removal of existing precast panels and glazing IPD Case Study 1980’s precast panels & leaks in existing glazing. • Coffer Design Overview • Analysis 2- Curtain Wall System • System Design • Installation of Curtain Wall System for: • Cost/Schedule Impact • Improved water protection • Benefit Analysis • Analysis 3- LED Temp. Lighting • Increased day-lighting • FLEX SLS System • Updated aesthetic appeal • Lighting/ Electrical Breadth • Feasibility Analysis • Analysis 4- Green Roof Terraces • Health Benefit Research • Design Layout • Final Conclusions • Acknowledgements

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.