May 16 – 18, 2016 Ritz-Carlton Laguna Niguel Dana Point, Calif.
May 16 18, 2016 Ritz-Carlton Laguna Niguel Dana Point, Calif. Re - - PowerPoint PPT Presentation
May 16 18, 2016 Ritz-Carlton Laguna Niguel Dana Point, Calif. Re - - PowerPoint PPT Presentation
May 16 18, 2016 Ritz-Carlton Laguna Niguel Dana Point, Calif. Re thinking Off-Site building : NG CHANGE ADI E L Be nso nwo o d Be nso nwo o d Unity Ho me s BW2B Fa m ily T re e Generation 1st 2nd 3 rd Now 1970s 1980s
L E ADI NG CHANGE
:
Re thinking Off-Site building
Be nso nwo o d
Be nso nwo o d
Unity Ho me s
BW2B Fa m ily T re e
Timberframing Off-Site Fabrication Craft Skills Software Development Specialized Tooling Building Systems Innovations Craft of Business
Open Built Disentanglement Lean Manufacturing Precision Connections High Tolerance Interface Stds Site Logistics Kitting Short-Cycle Site Assembly OB Cad Configurator Supply Chain Integration
Generation 1st 2nd 3rd Now Search for a Better Way to Build leads to 1970’s‐1980’s 1990’s 2000’s
Montage Teams
Establishing the Core Elements of the Platform Iterative Development; Rapid real time Prototyping Intermediating the Market w/ Tech Platform
CNC Automation OBGrid Modularization
- f Integrated
Assemblies Distributed Manufacturing
10 Princ iple s and Prac tic e Ste ps to ward 21st Ce ntury Ho me building
L e arn fro m E ve rywhe re
Scandinavia
Optimization Most Off-Site Construction Appropriate Technology Best Energy Standard Building Science Montage Design
Germany/Austria/Switzerland
CNC Tools Software Lead Technology Adaptation Modern Manufacturing Advanced Education for trades Durable Building standard
Japan
Lean Manufacturing Kaizen Precision Power of Modularity Tradition of Perfection
France
Pride in Craft/training Craft knowledge Personal discipline Humility Historical Perspective
New England
TF Legacy Building Off-site benefits and skills 3D modeling value Discipline of connections Site efficiency tools & logistics Discipline & Skills
Holland
Open Building Lives must Prevail Rational Design & Building Time based organization Sustainability through Adaptability
Dimensional Coordination Affordable Excellence
Mo ntag e
F ir mitas
stro ng , re fug e o f se c urity, built fo r the ag e s
Utilitas
func tio nal, adaptable , pe rso nal, he althy
Venustas
be auty, harmo nio us pro po rtio ns, sustainable ae sthe tic
Par sus
frug al, affo rdable , hig h pe rfo rmanc e , minimal impac t
Vitruvian I mpe rative Aim
Re disc o ve r the No ble Pro fe ssio n
T he “T e lo s” o f Ho me building
L e an Manufac turing Prac tic e s
Raising quality E liminating waste Applying kanbans, kaize ns and Value Stre am Mapping to g e t rid o f muda, mura and muri*
*uneven production) muda, waste mura, overworking muri
Wall Pro duc tio n
Build it T wic e : Virtual be fo re Ac tual BI M to BPM
BPM to CNC
SHELL INFILL
Space plan
10-50 years
Services
1-20 years
Stuff
Months-10 years
Skin
50-100 years
Structure
200-400 years
Site
Forever
Ope n Built Dise ntang le me nt
Montage Design
De sig n Asse mblie s, “Co mpo se ” De sig ns
50,000 to 50
Building Co mpo ne nt F abric atio n
OBPlus Wall System
Built‐in Engineering & Building Science
Site Mo ntag e
Bath and Me c hanic al Ro o m Po ds
Me c hanic al Cartridg e
Co re -Wall
F lat Pac k Virtual and Ac tual Shipping
Montage Building
Site fo r asse mbly o nly; avo id c utting and shaping
- Site is the wor
st
plac e to atte mpt to c o ntro l
- Quality
- E
ffic ie nc y
- Co st
- T
ime
OBCad Development
Configurator, Database Applications
Architects Supplier/Manufacturers Shell Fabricators Infill Fabricators Montage Installers Lending/Insurance Builder/Developer
- 1. Vitruvian I
mpe rative : Raise the bar
- 2. L
e arn fro m E ve rywhe re
- 3. T
raining , E duc atio n:T rade Pride : Re kindle No ble Pro fe ssio n
- 4. 3D So ftware Auto matio n: Virtual be fo re Ac tual
- 5. Ope n Built Dise ntang le me nt: L
aye rs o f time durability
- 6. OB Grid: Mo ntag e De sig n
- 7. F
abric ate I nte g rate d Co mpo ne nts: Distille d Value
- 8. Mo ntag e building : S
ite fo r Asse mbly
- 9. L
e an, Distribute d Manufac turing 10.I ndustry-Co nne c ting I nfo rmatio n Platfo rm
Bridg e to 21st Ce ntury Ho me building
E mail: tedd@bensonwood.c om tedd@unityhomes.c om Blog: teddbenson.c om Websites: unityhomes.c om bensonwood.c om