SLIDE 1
Massachusetts Water Resources Authority
SLIDE 2 Water Supply and Source Water Management
260 560 860 Mar-12 Jun-12 Sep-12 Dec-12 Mar-13 MGD
System Yield
Monthly Yield Long-Term Average
SLIDE 3 Water Supply and Source Water Management
20 40 60 80 100
Jan-00 Jan-02 Jan-04 Jan-06 Jan-08 Jan-10
Percent Full
Quabbin Reservoir Levels
With Drought Emergency Planning Stages
Normal Below Normal Below 25% Drought Emergency Stage 3 Below 38% Drought Emergency Stage 2 Below ~55% Drought Emergency Stage 1 Warning
SLIDE 4 Water Supply and Source Water Management
100 200 300 400
Mar-12 Jun-12 Sep-12 Dec-12 Mar-13
MGD
Water Transfers/Diversions
Quabbin to Wachusett (Transfer) Ware to Quabbin (Diversion)
SLIDE 5
Quabbin Aqueduct Tunnel Profile
SLIDE 6
Quabbin Aqueduct Tunnel
SLIDE 7
Shaft 8 – Lonergan I ntake on the Ware River
SLIDE 8
Lonergan I ntake Building
SLIDE 9
Lonergan I ntake
SLIDE 10
Lonergan I ntake Screens
SLIDE 11
Ware River Diversion
SLIDE 12
Shaft 11A Outlet and Shaft 12 Quabbin I ntake
SLIDE 13
Shaft 11A – Ware River Diversion I nto Quabbin
SLIDE 14
Water Distribution System Valves
250 500 750 1000 1250 1500
J A S O N D J F M A M J
# of valves
Main Line Valves Exercised
FY13 Target = 1,100
SLIDE 15
Water Distribution System Valves
100 200 300 400 500 600 700 J A S O N D J F M A M J
# of Valves
Blow-Off Valves Exercised
FY13 Target = 500
SLIDE 16
Deer I sland Operations
40% 43% 45% 48% 50% 53% 55% 58% 60% 3 5 8 10 13 15 18 20 23 25 28 30 J A S O N D J F M A M J % TS Destroyed
# Days Sludge Detention Time in Digesters and Total Solids Destruction
Detention Time, #Days 3 Yr Avg Detention Time, #Days Total Solids Destroyed, % 3 Yr Avg Total Solids Destroyed, %
SLIDE 17
Deer I sland Operations
75% 78% 80% 83% 85% 88% 90% 93% 95% 98% 100% 140,000 150,000 160,000 170,000 180,000 190,000 200,000 210,000 220,000 J A S O N D J F M A M J % Utilized DiGas, SCFH
Digester Gas Production and % Utilized
Avg Daily DiGas Produced, SCFH 8 Yr Avg Daily DiGas Produced, SCFH % DiGas Utilized