Presen esentati tion
- n Title
Making Ma ng the the Ri Righ ght Choices Choices Presen esentati - - PowerPoint PPT Presentation
Making Ma ng the the Ri Righ ght Choices Choices Presen esentati tion on Title Title Helping Customers and Partners to Design and Implement a Future Ready Laboratory Com Compan pany Profile ofile Desi Designi gning and and Commi
2
Desi Designi gning and and Commi mmissioning Lab Lab since since over
20 ye years
3
Ready to lead & realize complex Front‐End and Detailed Engineering and Integrated services
Proven engineering expertise, expert process know‐how and of laboratory requirements like test methods, standards, regulations, application setup & support etc.
Excellent knowledge of world‐wide procurement possibilities
State‐of‐the‐art knowledge of inspection requirements, packaging and strong logistic skills with extensive knowledge of international transport possibilities and requirements to virtually all locations
Broad and deep knowledge of Equipment, Methods and (Project) Procedures
Global partner network of with established relationship to ensure effective and productive use of laboratory systems
4
LNG Nigeria Petrochemicals KSA LNG Egypt
DAMIETTA LNG
Oil UAE RRE Refinery UAE LNG Peru Dahej Ethylene Cracker, India Wheatstone & Gorgon LNG Australia LNG Oman GPP Algeria CPF Algeria Prelude F-LNG Aktobe Plant, Kazakhstan BCPL Cracker & Polymer, India
5
Pr Project brie briefing fing Refinery finery Lab Lab Pr Project executed between 2013 and 2014
has developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment definition.
with over 220 instruments and methods
contribution has enabled a timely installation and commissioning
people and experts from M&I‐Labtech have worked and successfully completed the project Sam Sample le Re Reception Shift Shift Lab Lab
Da Day Lab Lab
Engine Engine Room
Oi Oil Lab Lab
6
Pr Project brie briefing fing GT GTL Lab Lab Pr Project executed between 2008 and 2010
developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment definition.
instruments and methods
has recommended the GC Analyzers and carefully crafted the Sulphur area to avoid contaminations.
and experts from M&I‐Labtech have worked and successfully completed the project
St Storag age Room
Sulphur phur Lab Lab
Wa Water Lab Lab GC GC & Wa Water Lab Lab Sam Sample le Re Reception
Clean Clean Room
7
Pr Project brie briefing fing LNG LNG Lab Lab Pr Project executed between 2014 and 2015
developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment.
to predict building clashes and work seamlessly with civil teams.
with over 100 instruments and methods
remote part of the world with a challenging execution and strictly normed environment
from M&I‐Labtech side to effectively deploy a team of ~25 technically qualified people and complete project on time.
8
We We va value our
custom
er feedback eedback and and ref refere rence
and recommendations collected and earned over many years of successful
Oil and Energy field.
markets, functional areas and geographies.
9
The The Va Value Cr Crea eati tion
eel
OPERATIONAL REQUIREMENTS END‐USER/ OWNER REQUIREMENTS WORKFLOW & FUNCTIONALITY LABORATORY REGULATIONS HSE REQUIREMENTS DETAILED DESIGN
CUSTOMER & PARTNER PRODUCTIVITY
10 10
Improve Learn Innovate Plan Create
A pr prov
en pr process
to tr trans ansform
needs in into actions actions
Fo Focus Are reas
guidelines are defined by client Da Data ava available durin during Cus Custom
er Nee Needs/D s/Design sign
basic
Proce
sses
Del Deliverables es
chemical and standards requirements
11 11
DEP
12 12
Gr Grouping
quipment, t, Er Ergonom nomics, cs, Accessibility Accessibility
Sulphur Condensate Natural Gas LPG
13 13
Productivity
delivered ed in in a sa safe and and functional functional en envir vironm nmen ent
14 14
Furnitur Furniture, e,(M (MEP) EP) Desi Design gn of
ilities (G (GDS, Po Power, Wa Water) and and Ex Extr traction action Syste Systems.
3D‐Design software allows you and your team manage and streamline the coordination process to establish the interfaces, and resolve conflicts quickly and efficiently.
15 15
Fir First Cl Class ass furnitu furniture br brands ands
16 16
Fir First Cl Class ass furnitu furniture br brands: ands:
For over 60 years, our developments have shaped the workplace in laboratories all over the world. With our new SCALA laboratory furniture system, we set the standard, with functional technology, a distinctive design, high quality materials and precise workmanship. From us you can expect top quality made in Germany, highly developed technology, professional project management and perfect
maximum return on your investment with which you are ideally equipped for the future.
17 17
Fir First class class furnitur furniture br brands ands
18 18 GC Systems Physical Properties Spectroscopy Standards Kits Separation Method
Com Complete Anal Analytical al Workflo rkflow Solutions Solutions
Methods & Standards Methods & Standards Instruments/ Equipment Instruments/ Equipment Reagents Reagents Software Software Data Management Data Management
19 19
Commi mmitted to to pr providin iding innov innovativ tive solutions solutions
NGA METHOD Sample Loop: 500 µL Carrier Gas: Helium Column 1 : CP-SilPona (50mx210umx0.5um) Column 1 : 1.5 mL/min Column 3 & 4 : Hayasep Q (6ft * 3ft) Column 3&4 Flow(PCM C-1): 30 ml/min Column 5 : Molsieve 13X (10ft) Column 5 Flow(PCM C-2): 16Psi FRONT I NLET Injection Temperature: 250 C Split Ratio: 100:1 FRONT DETECTOR(FI D) Detector Temperature: 250 C Hydrogen Flow Rate: 35 mL/min Air flow rate: 350 mL/min Makeup flow rate: 25 mL/min SI DE DETECTOR(TCD) Detector Temperature: 250 C Reference Flow Rate: 45 mL/min Make up flow rate: 2mL/min SULFUR METHOD Sample Size: 250ul Carrier Gas: Helium Column 2: 08-1(60 m x 320 pm x 5.00um) Column Flow: 2 mL/min BACK I NLET Injection Temperature: 250 C Split Ratio: 50:1 BACK DETECTOR(FPD) Detector Temperature: 250 C Hydrogen Flow Rate: 60 mL/min Air flow rate: 60 mL/min Const col + Makeup: 60 mL/min OVEN PROGRAM Initial temperature: 40 C Initial time: 5min Intermediate rate: 10 C Final temperature: 150 C Final time: 4min Run time: 20min
We partner with leading analytical equipment providers to tailor methods and solutions that meet the needs of the most sophisticated Scientists and Engineers
20 20
Single Single Po Point of
Contact, act, Fully Fully Suit Suited ed
PROJECT SCHEDULE PROJECT COMPLIANCE SHEET CHANGE / ISSUE MANAGEMENT SCOPE & INTERFACES (RACI) PROJECT QUALITY & CONTROL PLAN DOCUMENT CONTROL (VPIS/VDR) INSPECTION & TEST PLAN PROGRESS REPORT
PROJECT MANAGER
21 21
Furniture Installation Utilities Installation Unpacking Equipment
Fr From
ilding Re Readiness till till Accep Acceptance ance
GDS Installation
Tankhoofd 7‐8, 3196 KE Vondelingenplaat Rotterdam The Netherlands Jan van den Braak Tel: +31 10 26 307 77 Mob: +31 65 380 8484 Mail: j.vd.braak@mi‐labtech.com Web: www.mi‐labtech.com