Making Ma ng the the Ri Righ ght Choices Choices Presen esentati - - PowerPoint PPT Presentation

making ma ng the the ri righ ght choices choices
SMART_READER_LITE
LIVE PREVIEW

Making Ma ng the the Ri Righ ght Choices Choices Presen esentati - - PowerPoint PPT Presentation

Making Ma ng the the Ri Righ ght Choices Choices Presen esentati tion on Title Title Helping Customers and Partners to Design and Implement a Future Ready Laboratory Com Compan pany Profile ofile Desi Designi gning and and Commi


slide-1
SLIDE 1

Presen esentati tion

  • n Title

Title

Ma Making ng the the Ri Righ ght Choices Choices

Helping Customers and Partners to Design and Implement a Future Ready Laboratory

slide-2
SLIDE 2

2

Com Compan pany Profile

  • file

Desi Designi gning and and Commi mmissioning Lab Lab since since over

  • ver 20

20 ye years

  • Established in 1992 (Spin‐off from Saybolt)
  • Independent company allowing selection of the optimum

solution

  • Over 20 years Laboratory Expertise in Oil & Gas,

Petrochemical and (non‐)Ferrous Lab Methods, Standards and Requirements

  • Specialized in Engineering & Design (FEED and Detail) and

Turn‐key Project Realization

  • ISO 9001‐2008 certified and commitment to HSE
  • Offering a total solution within one organization and a

single point of contact

slide-3
SLIDE 3

3

Cor Core and and Domai Domain Ar Areas eas

An An Inno nnovativ tive and and Cus Custom

  • mer

er Ori Oriented ed Enginee Engineering ing Pa Partner built built on:

  • n:
  • Project Managers

Ready to lead & realize complex Front‐End and Detailed Engineering and Integrated services

  • Project Engineers

Proven engineering expertise, expert process know‐how and of laboratory requirements like test methods, standards, regulations, application setup & support etc.

  • Procurement

Excellent knowledge of world‐wide procurement possibilities

  • Inspectors and Logistics

State‐of‐the‐art knowledge of inspection requirements, packaging and strong logistic skills with extensive knowledge of international transport possibilities and requirements to virtually all locations

  • Installation& Commissioning Engineers

Broad and deep knowledge of Equipment, Methods and (Project) Procedures

  • Long‐Term O&M Services beyond the “Supply only concept”

Global partner network of with established relationship to ensure effective and productive use of laboratory systems

slide-4
SLIDE 4

4

Global Global Re Reach

Pr Prove

  • ven Tr

Track Re Record of

  • f Succ

Success ess

LNG Nigeria Petrochemicals KSA LNG Egypt

DAMIETTA LNG

Oil UAE RRE Refinery UAE LNG Peru Dahej Ethylene Cracker, India Wheatstone & Gorgon LNG Australia LNG Oman GPP Algeria CPF Algeria Prelude F-LNG Aktobe Plant, Kazakhstan BCPL Cracker & Polymer, India

slide-5
SLIDE 5

5

Takr kreer eer Ruw Ruwais Refi finer nery Expansion Expansion

Pr Project brie briefing fing Refinery finery Lab Lab Pr Project executed between 2013 and 2014

  • From a FEED of Jacobs M&I‐ Labtech

has developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment definition.

  • Lab size is over 17000 sqft

with over 220 instruments and methods

  • M&I‐Labtech engineering

contribution has enabled a timely installation and commissioning

  • f the entire lab in 14 months
  • A team of ~30 technically qualified

people and experts from M&I‐Labtech have worked and successfully completed the project Sam Sample le Re Reception Shift Shift Lab Lab

Da Day Lab Lab

Engine Engine Room

  • om

Oi Oil Lab Lab

slide-6
SLIDE 6

6

Shell Shell Qa Qatar Gas Gas To To Liquid Liquid Plan Plant

Pr Project brie briefing fing GT GTL Lab Lab Pr Project executed between 2008 and 2010

  • From a FEED of Shell M&I‐Labtech has

developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment definition.

  • Lab size is over 9000 sqft, with over 130

instruments and methods

  • Working closely with Shell, M&I‐Labtech

has recommended the GC Analyzers and carefully crafted the Sulphur area to avoid contaminations.

  • A team of ~25 technically qualified people

and experts from M&I‐Labtech have worked and successfully completed the project

St Storag age Room

  • om

Sulphur phur Lab Lab

Wa Water Lab Lab GC GC & Wa Water Lab Lab Sam Sample le Re Reception

Clean Clean Room

  • om
slide-7
SLIDE 7

7

Wh Wheatston tone Lique Liquefied fied Na Natur tural Gas Gas

Pr Project brie briefing fing LNG LNG Lab Lab Pr Project executed between 2014 and 2015

  • From a FEED of Bechtel with M&I, we have

developed the detailed engineering, defining lab layout, GDS, Furniture and Method/Equipment.

  • First time use of Revit Architecture

to predict building clashes and work seamlessly with civil teams.

  • Lab size is over 5500 sqft,

with over 100 instruments and methods

  • A 12 month, well executed project in a

remote part of the world with a challenging execution and strictly normed environment

  • A significant operational and logistics effort

from M&I‐Labtech side to effectively deploy a team of ~25 technically qualified people and complete project on time.

slide-8
SLIDE 8

8

Cus Customer

  • mers De

Define ne a Job Job We Well Done Done

We We va value our

  • ur cus

custom

  • mer

er feedback eedback and and ref refere rence

  • A vast selection of references

and recommendations collected and earned over many years of successful

  • peration.
  • Undisputed reputation in the

Oil and Energy field.

  • Ready to expand in new

markets, functional areas and geographies.

slide-9
SLIDE 9

9

Engi Engineeri neering and and Desi Design gn

The The Va Value Cr Crea eati tion

  • n Wheel

eel

OPERATIONAL REQUIREMENTS END‐USER/ OWNER REQUIREMENTS WORKFLOW & FUNCTIONALITY LABORATORY REGULATIONS HSE REQUIREMENTS DETAILED DESIGN

CUSTOMER & PARTNER PRODUCTIVITY

slide-10
SLIDE 10

10 10

Improve Learn Innovate Plan Create

Fr From

  • m Cus

Customer

  • mer Needs

Needs to to Engi Engineeri neering

A pr prov

  • ven

en pr process

  • cess to

to tr trans ansform

  • rm needs

needs in into actions actions

Custom Customer er Needs/ Needs/ Desi Design gn

Fo Focus Are reas

  • Feasibility study
  • Perform technical requirements
  • Investment cost for the project
  • Project‐specific requirements and

guidelines are defined by client Da Data ava available durin during Cus Custom

  • mer

er Nee Needs/D s/Design sign

  • Process samples not available
  • Laboratory Layout is very basic
  • Equipment list is estimated and very

basic

  • Utilities, Power, HVAC is not available

De Detaile iled Design Design

Proce

  • cesses

sses

  • Problem Definition
  • Conceptual Design
  • Preliminary Design
  • Detail Design
  • Design Communication

Del Deliverables es

  • Furniture layout and Spefification
  • Equipment and Utilities Layout
  • Gas and Elestrical distribution
  • Analyzers definitions and optimization
  • Full operational requirements including

chemical and standards requirements

slide-11
SLIDE 11

11 11

Lab Lab Re Regulations and and St Standar andards ds

Engi Enginee neering ing built ilt on

  • n a we

well de defi fined ned re regulato tory fr fram amework

DEP

Good Good Labor Laboratory ry Pr Practices

slide-12
SLIDE 12

12 12

Wo Workflow and and Functionality Functionality

Gr Grouping

  • uping Equipmen

quipment, t, Er Ergonom nomics, cs, Accessibility Accessibility

Sulphur Condensate Natural Gas LPG

slide-13
SLIDE 13

13 13

Wo Workflow and and Functionality Functionality

Productivity

  • ductivity deliv

delivered ed in in a sa safe and and functional functional en envir vironm nmen ent

slide-14
SLIDE 14

14 14

3D 3D‐Detaile iled Desi Design gn

Furnitur Furniture, e,(M (MEP) EP) Desi Design gn of

  • f Utilities

ilities (G (GDS, Po Power, Wa Water) and and Ex Extr traction action Syste Systems.

3D‐Design software allows you and your team manage and streamline the coordination process to establish the interfaces, and resolve conflicts quickly and efficiently.

slide-15
SLIDE 15

15 15

Pa Partners in in Furnitur Furniture

Fir First Cl Class ass furnitu furniture br brands ands

slide-16
SLIDE 16

16 16

Pa Partners in in Furnitur Furniture

Fir First Cl Class ass furnitu furniture br brands: ands:

For over 60 years, our developments have shaped the workplace in laboratories all over the world. With our new SCALA laboratory furniture system, we set the standard, with functional technology, a distinctive design, high quality materials and precise workmanship. From us you can expect top quality made in Germany, highly developed technology, professional project management and perfect

  • service. SCALA offers you the

maximum return on your investment with which you are ideally equipped for the future.

slide-17
SLIDE 17

17 17

Pa Partners in in Furnitur Furniture

Fir First class class furnitur furniture br brands ands

slide-18
SLIDE 18

18 18 GC Systems Physical Properties Spectroscopy Standards Kits Separation Method

Oper Operational nal Requir quirements

Com Complete Anal Analytical al Workflo rkflow Solutions Solutions

Methods & Standards Methods & Standards Instruments/ Equipment Instruments/ Equipment Reagents Reagents Software Software Data Management Data Management

slide-19
SLIDE 19

19 19

Deep Deep in in Analy Analytic ical al Solutions Solutions

Commi mmitted to to pr providin iding innov innovativ tive solutions solutions

NGA METHOD Sample Loop: 500 µL Carrier Gas: Helium Column 1 : CP-SilPona (50mx210umx0.5um) Column 1 : 1.5 mL/min Column 3 & 4 : Hayasep Q (6ft * 3ft) Column 3&4 Flow(PCM C-1): 30 ml/min Column 5 : Molsieve 13X (10ft) Column 5 Flow(PCM C-2): 16Psi FRONT I NLET Injection Temperature: 250 C Split Ratio: 100:1 FRONT DETECTOR(FI D) Detector Temperature: 250 C Hydrogen Flow Rate: 35 mL/min Air flow rate: 350 mL/min Makeup flow rate: 25 mL/min SI DE DETECTOR(TCD) Detector Temperature: 250 C Reference Flow Rate: 45 mL/min Make up flow rate: 2mL/min SULFUR METHOD Sample Size: 250ul Carrier Gas: Helium Column 2: 08-1(60 m x 320 pm x 5.00um) Column Flow: 2 mL/min BACK I NLET Injection Temperature: 250 C Split Ratio: 50:1 BACK DETECTOR(FPD) Detector Temperature: 250 C Hydrogen Flow Rate: 60 mL/min Air flow rate: 60 mL/min Const col + Makeup: 60 mL/min OVEN PROGRAM Initial temperature: 40 C Initial time: 5min Intermediate rate: 10 C Final temperature: 150 C Final time: 4min Run time: 20min

We partner with leading analytical equipment providers to tailor methods and solutions that meet the needs of the most sophisticated Scientists and Engineers

slide-20
SLIDE 20

20 20

Pr Project Manag anagement

Single Single Po Point of

  • f Con

Contact, act, Fully Fully Suit Suited ed

PROJECT SCHEDULE PROJECT COMPLIANCE SHEET CHANGE / ISSUE MANAGEMENT SCOPE & INTERFACES (RACI) PROJECT QUALITY & CONTROL PLAN DOCUMENT CONTROL (VPIS/VDR) INSPECTION & TEST PLAN PROGRESS REPORT

YOUR DEDICATED

PROJECT MANAGER

slide-21
SLIDE 21

21 21

Furniture Installation Utilities Installation Unpacking Equipment

Planned Planned St Step eps to to Build Build a Productiv

  • ductive Lab

Lab

Fr From

  • m Building

ilding Re Readiness till till Accep Acceptance ance

GDS Installation

slide-22
SLIDE 22

400+ 400+ References nces Wo Worldwide 20+ 20+ Year ars of

  • f Experi

Experience ence 1250 1250 + It Items per per Pr Project

M&I M&I‐Lab Labtech ech B. B.V.

Tankhoofd 7‐8, 3196 KE Vondelingenplaat Rotterdam The Netherlands Jan van den Braak Tel: +31 10 26 307 77 Mob: +31 65 380 8484 Mail: j.vd.braak@mi‐labtech.com Web: www.mi‐labtech.com