m s supra vessels engineers pvt ltd
play

M/s Supra Vessels & Engineers Pvt. Ltd. Company Profile About - PowerPoint PPT Presentation

M/s Supra Vessels & Engineers Pvt. Ltd. Company Profile About Supra Established in 1999, the company have carved a niche for themselves for delivering high-quality products and services. Centrally located in Bharatpur, closer


  1. M/s Supra Vessels & Engineers Pvt. Ltd. Company Profile

  2. About Supra • Established in 1999, the company have carved a niche for themselves for delivering high-quality products and services. • Centrally located in Bharatpur, closer to the commercial hub of the country, New Delhi. • 80% of client retention rate • Delivered more than 70 + projects within a span of 19 years. • Employees’ strength of more than 100

  3. ̶ ̶ ̶ ̶ ̶ Why Supra? ▪ Remarkable expertise in project execution and service delivery A team of skilled and technically sound professionals ▪ Broad array of services & ability to deliver any kind of project We have the ability to deliver any kind of Fabrication Project. ▪ Strong and liquid balance sheet You can be assured about the quality of the product within the given time frame ▪ History of consistent growth Since inception, the company has grown multiple folds. The company has proven track record of delivering technically advanced projects ▪ Association with Renowned Brands We have an impressive clients’ list, which gives us an edge over competitors.

  4. What we do? Supra Vessels MECHANICAL FABRICATION

  5. About Supra ▪ Technological / Structural Steel Fabrication ▪ Material Handling Equipments for Cement/ Sugar/ Power ▪ Petrochemical Equipments (Reformer/ Heater Parts) ▪ Hydro Mechanical Equipments

  6. Our Respected Clientele

  7. Engineering important milestone’s identification

  8. A Glimpse of Similar Projects • Project Name: Modular Penex Unit • Client: Honeywell Uop • Owner: BORL Bina Refinery • Duration of Project: 6 Months • Tonnage of Project: 350 MT. • Material: IS:2062 E350 BR.

  9. • Challenges Faced & Key Highlights of Project: • Complete trial assembly of Pipe Rack Modules required as per Project done in Workshop with complete bolting arrangement. • All Welding done with FCAW Process. • No Site Mismatches Observed. • More than 30 types of Structural Steel Sections handled during fabrication .

  10. A Glimpse of Similar Projects • Project Name: IOCL – INDMAX Gasoline Desulphurization • Client: TechnipFmc • Owner : IOCL, Bongaigaon Refinery • Duration of Project: 10 Months • Tonnage of the Project: 650 MT. • Material: IS:2062 E250 BR.

  11. Challenges Faced & Key Highlights of Project: • Complete Trial Assembly of Pipe Rack Modules required as per Project done in Workshop with complete bolting arrangement. • All Welding done with FCAW Process. • More than 5000 holes bolted in one grid wise assembly in workshop • No Major Site Mismatches Observed. • More than 45 types of Structural Steel Sections handled during Fabrication .

  12. Result Oriented Approach: • Apart from Fabrication Shop one dedicated shop was allocated specially for trial assembly of Pipe Rack Modules. • In order to meet delivery time & quality requirements additional manpower & resources allocated resulting in timely completion of project.

  13. Pictures of Pipe Rack Module During Dispatch

  14. Pictures of Pipe Rack During Trial Assembly In Workshop

  15. Photographs of Bolting Arrangement

  16. Shop Presentation and Manufacturing Capacity

  17. A look at the Workshop • Covered / Shed Area 8000 Sq. Yard • Open Area 5000 Sq. Yard • Total Area 13000 Sq. Yard

  18. Day & Night View of Workshop Installed Annual Production Capacity - 2000-2500 MT

  19. Photographs of Recently Executed Fabrication Works

  20. Photographs of Recently Executed Fabrication Works

  21. Photographs of Recently Executed Fabrication Works

  22. Photographs of Recently Executed Fabrication Works

  23. Photographs of Recently Executed Fabrication Works

  24. In House Quality Assurance Process

  25. Quality Assurance Process Manufacturing Process Raw Material Procurement as per Material identification Marking, Cutting, Fit-up Inspection the requirement as per QAP Welding preparation & Review of WPS, WPQ & DT & NDT Test on Welding inspection Set-up Inspection PQR as applicable weld as applicable (Visual & Dimension) Inspection during & Fabrication Inspection as Review of various charts Mockup assembly after machining per QAP & reports as applicable check-up/ assembly operation if any inspection Contd

  26. Quality Assurance Process Mockup assembly check-up/assembly inspection Execution of additional Final inspection as per fabrication Checking of surface preparation & tests if applicable Drgs. / General guide line protection from corrosion of heat Final review of Job identification & Visual Inspection of Final Painted Material quality records as per match-make Painting process inspection QAP required verification Final clearance for job completion and for Delivery of the Product client inspection

  27. Thank You.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend