Looking to the Future of Fredericksburg Transportation May 23, 2018 - PowerPoint PPT Presentation

Looking to the Future of Fredericksburg Transportation May 23, 2018 Fastest Growing Region of Virginia GWRC Population for PDC 16 (2017): 360,000 Expected to double by 2045 2 Fredericksburg Region Commuting Overview Large Out Commuter


  1. Looking to the Future of Fredericksburg Transportation May 23, 2018

  2. Fastest Growing Region of Virginia GWRC Population for PDC 16 (2017): 360,000 Expected to double by 2045 2

  3. Fredericksburg Region Commuting Overview ➢ Large Out Commuter Population ▪ About 1 out of 6 Fredericksburg Area residents work outside of the region ▪ Over 61,000 commuters per weekday (2016 Commuter Skills Study) ▪ Over 48,000 per weekday along I-95 corridor to NoVA/DC ➢ High Demand for Park and Ride Lot spaces • 2045 LRTP calls for 9,000 additional spaces 3

  4. Multimodal Transportation Solutions 4

  5. Transit Projects ➢ Regional Support for High Speed Ground Transportation High Speed Rail (3 rd Track) ▪ ▪ MagLev and other innovative technologies ➢ Committed Virginia Railway Express Improvements • Stafford Station Capacity Expansion ‒ Brooke: 2 nd platform and a longer 1 st platform ‒ Leeland 2 nd platform and a longer 1 st platform with additional parking • Fredericksburg Station Platform Expansion • Fredericksburg line improvements will accommodate 8 car trains 5

  6. Top Regional Transportation Needs COST ID PRIMARY IMPROVEMENT TYPE ESTIMATE I-95 SB widening to 4 lanes from Mpt 128.7 to Exit 126, and 5th auxiliary off ramp lane at Exit A Highway $25 million 126 B Exit 126 STARS Study improvements Highway $25 million I-95 SB widening to 4 lanes from Mpt 128.7 to Exit 126, I-95 NB widening to 4 lanes from Exit C Highway $75 million 126 to Exit 130, and Exit 126 STARS Study improvements D US 17 Bus. STARS Study improvements and PNR lot improvements TDM $25 million E Exit 136 ramp improvement and Enon Rd intersection improvements Highway $23 million F Route 3 STARS Study improvements and I-95 NB to Rte 3 EB ramp improvement Highway $12.6 million Route 3 STARS Study improvements, I-95 NB to Rte 3 EB ramp improvement, and Gateway G Highway $35 million Blvd extension from Rte 3 to Cowan Blvd H SE Stafford County PNR lot improvements TDM $6.2 million 6

  7. Map of Regional Candidate Projects 7

  8. I-95 SB Widening from Mpt 128.7 to Exit 126 Study Support: I-95 Phase 2 Cost: $25 million (no leverage) Need: By 2030 8

  9. Exit 126 Interchange Improvement: US 1 to I-95 NB Study Support: Exit 126 STARS and I-95 Phase 2 Estimated Cost: $25 million (no leverage) Need: By 2030 9

  10. Widen I-95 to 8 Lanes from Exit 130 to Exit 126 + Exit 126 STARS Study Improvements Study Support: Exit 126 STARS and I-95 Phase 2 Cost: $75 million (no leverage) Need: By 2030 10

  11. Possible Multimodal Enhancements for I-95 Improvements Between Exit 130 and 126 1. Intelligent Transportation System (ITS) • Parking demand management system • Traffic operations cameras on I-95 2. Bike/Ped • Harrison Road shared-use path • Improvements to future Commonwealth Drive or existing Rte 208 PNR lots 3. TDM • PNR lot improvements • Marketing of TDM/transit 4. Transit • New transit service (FRED Caroline service to Spotsylvania VRE) 11

  12. Possible PNR Lot Enhancements 12

  13. US 17 Business STARS Improvements & PNR Lot Study Support: US 17 Business STARS and I-95 Phase 2 Estimated Cost: $25 million (no leverage) Need: By 2030 New PNR Lot 13

  14. Exit 136 Interchange + Enon Rd Improvements Study Support: I-95 Phase 2 Estimated Cost: $23 Million I-95 SB off ramp Need: By 2030 Leveraged Funding: $6 million New ramp from EB Centreport Pkwy to SB US 1 Enon Rd improvements 14

  15. EB Centreport Pkwy to SB US 1 Ramp 15

  16. Rte 3 STARS Study and NB I-95 Off Ramp Improvement Study Support: Rte 3 STARS Estimated Cost: $12.6 million Need: By 2030 Leveraged Funding: $1 million 16

  17. Rte 3 STARS Study + Gateway Blvd Extended Study Support: Rte 3 STARS Estimated Cost: $35 million Need: By 2030 Leveraged Funding: $11 million 17

  18. Gateway Blvd Extension Concept 18

  19. SE Stafford Potential PNR Lot Improvements Need for a permanent lot in this area. 1. Northside of Chatham Bridge (10 spaces) • Tourism, Recreational 2. Route 3 East: Washington Square (156 spaces) • Commuters to Dahlgren 19

  20. Questions? Paul Agnello, AICP FAMPO Administrator (540) 642-1564 agnello@gwregion.org 20

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend