Looking to the Future of Fredericksburg Transportation May 23, 2018 - - PowerPoint PPT Presentation
Looking to the Future of Fredericksburg Transportation May 23, 2018 - - PowerPoint PPT Presentation
Looking to the Future of Fredericksburg Transportation May 23, 2018 Fastest Growing Region of Virginia GWRC Population for PDC 16 (2017): 360,000 Expected to double by 2045 2 Fredericksburg Region Commuting Overview Large Out Commuter
Fastest Growing Region of Virginia
GWRC Population for PDC 16 (2017): 360,000 Expected to double by 2045
2
Fredericksburg Region Commuting Overview
➢ Large Out Commuter Population
▪ About 1 out of 6 Fredericksburg Area residents work outside of the region ▪ Over 61,000 commuters per weekday (2016 Commuter Skills Study) ▪ Over 48,000 per weekday along I-95 corridor to NoVA/DC ➢ High Demand for Park and Ride Lot spaces
- 2045 LRTP calls for 9,000 additional spaces
3
Multimodal Transportation Solutions
4
Transit Projects
➢ Regional Support for High Speed Ground Transportation
▪ High Speed Rail (3rd Track) ▪ MagLev and other innovative technologies
➢ Committed Virginia Railway Express Improvements
- Stafford Station Capacity Expansion
‒ Brooke: 2nd platform and a longer 1st platform ‒ Leeland 2nd platform and a longer 1st platform with additional parking
- Fredericksburg Station Platform Expansion
- Fredericksburg line improvements will accommodate 8 car trains
5
Top Regional Transportation Needs
6
ID PRIMARY IMPROVEMENT TYPE COST ESTIMATE
A I-95 SB widening to 4 lanes from Mpt 128.7 to Exit 126, and 5th auxiliary off ramp lane at Exit 126 Highway $25 million B Exit 126 STARS Study improvements Highway $25 million C I-95 SB widening to 4 lanes from Mpt 128.7 to Exit 126, I-95 NB widening to 4 lanes from Exit 126 to Exit 130, and Exit 126 STARS Study improvements Highway $75 million D US 17 Bus. STARS Study improvements and PNR lot improvements TDM $25 million E Exit 136 ramp improvement and Enon Rd intersection improvements Highway $23 million F Route 3 STARS Study improvements and I-95 NB to Rte 3 EB ramp improvement Highway $12.6 million G Route 3 STARS Study improvements, I-95 NB to Rte 3 EB ramp improvement, and Gateway Blvd extension from Rte 3 to Cowan Blvd Highway $35 million H SE Stafford County PNR lot improvements TDM $6.2 million
Map of Regional Candidate Projects
7
I-95 SB Widening from Mpt 128.7 to Exit 126
8
Study Support: I-95 Phase 2 Cost: $25 million (no leverage) Need: By 2030
Exit 126 Interchange Improvement: US 1 to I-95 NB
9
Study Support: Exit 126 STARS and I-95 Phase 2 Estimated Cost: $25 million (no leverage) Need: By 2030
Widen I-95 to 8 Lanes from Exit 130 to Exit 126 + Exit 126 STARS Study Improvements
10
Study Support: Exit 126 STARS and I-95 Phase 2 Cost: $75 million (no leverage) Need: By 2030
11
Possible Multimodal Enhancements for I-95 Improvements Between Exit 130 and 126
- 1. Intelligent Transportation System (ITS)
- Parking demand management system
- Traffic operations cameras on I-95
- 2. Bike/Ped
- Harrison Road shared-use path
- Improvements to future Commonwealth Drive or existing Rte 208 PNR lots
- 3. TDM
- PNR lot improvements
- Marketing of TDM/transit
- 4. Transit
- New transit service (FRED Caroline service to Spotsylvania VRE)
12
Possible PNR Lot Enhancements
US 17 Business STARS Improvements & PNR Lot
13
Study Support: US 17 Business STARS and I-95 Phase 2 Estimated Cost: $25 million (no leverage) Need: By 2030
New PNR Lot
14
Study Support: I-95 Phase 2 Estimated Cost: $23 Million Need: By 2030 Leveraged Funding: $6 million
Exit 136 Interchange + Enon Rd Improvements
Enon Rd improvements I-95 SB off ramp New ramp from EB Centreport Pkwy to SB US 1
EB Centreport Pkwy to SB US 1 Ramp
15
Rte 3 STARS Study and NB I-95 Off Ramp Improvement
16
Study Support: Rte 3 STARS Estimated Cost: $12.6 million Need: By 2030 Leveraged Funding: $1 million
Rte 3 STARS Study + Gateway Blvd Extended
17
Study Support: Rte 3 STARS Estimated Cost: $35 million Need: By 2030 Leveraged Funding: $11 million
Gateway Blvd Extension Concept
18
SE Stafford Potential PNR Lot Improvements
19
Need for a permanent lot in this area. 1. Northside of Chatham Bridge (10 spaces)
- Tourism, Recreational
2. Route 3 East: Washington Square (156 spaces)
- Commuters to Dahlgren
Questions?
20
Paul Agnello, AICP FAMPO Administrator (540) 642-1564 agnello@gwregion.org