List of BI Open Actions Gian Piero Di Giovanni, R. Jones, M. Meddahi, B. Mikulec, G. Rumolo, J. Tan, LIU-PSB WG Meeting 21 st May 2015 Open Actions (I) H0/H- Current Monitors Electronics: The proposal need to be reviewed with BE/OP (F.


  1. List of BI Open Actions Gian Piero Di Giovanni, R. Jones, M. Meddahi, B. Mikulec, G. Rumolo, J. Tan, LIU-PSB WG Meeting 21 st May 2015

  2. Open Actions (I) • H0/H- Current Monitors Electronics: • The proposal need to be reviewed with BE/OP (F. Roncarolo). Ongoing • H0/H- Current Monitors: • Check the need to order spares, 19 kCHF, to align with magnets spares (J. Tan). Ongoing • H- charge-exchange, Beam Profile and Foil Inspection: • Keep only the 2 spares foreseen (not 4). • Mechanics: to be checked that it is practical to remove old unit & re-install (J. Tan/S. Burger). • Yes: CF Flanges. • BI.SMV position measurement plates: • Positions now defined for outgoing beams - integration to be checked (B. Mikulec). • BI.BTV30: • ECR required (J. Tan): Ongoing . This will be issued in the shadow of the BI.SMV’s ECR • SEM for injection matching: • SRR & ECR required (J. Tan) . Ongoing • Decision taken to move installation to YETS 17-18, but with study of possibility for PPM device re-visited. (F. Roncarolo) . Ongoing • Decision on spare grids to be taken once cost of final design clear. Ongoing 2

  3. Open Actions (II) • BCTs - BR.TMD in 8L1: • Optimize the scheduled work in the radiation laboratory ( 20.8 man x days ) for the BCTs-BR.TMD currently installed in PSB section 8L1. (R. Froeschl/J. Tan). • Dose rate in Section 8L1 is reasonably low. Q3 2015 : BI will submit a Work Dose Planning • PSB-TMS: (J. Tan/L. Soby) Ongoing • BI needs to prioritize in 2015 on: • Demonstrating 200 m m resolution for low intensity. Ongoing • Demonstrating reliable operation with new firmware/software. • Electronics to be ready for deployment in EYETS 16-17. • Wideband BPM: • Design based on PS: Design started. Built at CERN: Yes Feasible for end 2016: Yes (L. Soby). • DIC submitted • SRR+ECR to be submitted (J. Tan). Ongoing • BLM: • PS specs needed to enable regrouping of electronics order (LIU Management). • ECR in 2015: include FLAT ionization chambers and ionization chambers to replace ACEMs (J. Tan) . • Ongoing • Wire Scanners: • Need to find specifications (B. Mikulec/J. Tan). • If Section 4L1 is used for SEM & WS then we may need re-sectorization of vacuum as it is also injection region vacuum. • What do we need to get out of critical path with this WU? (R. Jones/B Dehning). 3

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.