LEADING EXPLORATION IN JAMES BAY EASTMAIN RESOURCES INC. ER:TSX - PowerPoint PPT Presentation

LEADING EXPLORATION IN JAMES BAY EASTMAIN RESOURCES INC. ER:TSX CORPORATE PRESENTATION JUNE 2017 LEADING EXPLORATION IN JAMES BAY EASTMAIN RESOURCES INC. ER:TSX CORPORATE PRESENTATION JUNE 2017 FORWARD LOOKING STATEMENTS Certain


  1. LEADING EXPLORATION IN JAMES BAY EASTMAIN RESOURCES INC. ER:TSX CORPORATE PRESENTATION – JUNE 2017

  2. LEADING EXPLORATION IN JAMES BAY EASTMAIN RESOURCES INC. ER:TSX CORPORATE PRESENTATION – JUNE 2017

  3. FORWARD LOOKING STATEMENTS Certain information set forth in this presentation may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. Forward-looking statements consist of statements that are not purely historical, including statements regarding beliefs, plans, expectations or timing of future plans, and include, but not limited to, statements with respect to any potential director nominations, actions taken in respect of director nominations received by Eastmain, actual results of current and future exploration activities at the Company's properties, and the potential success of the Company’s future exploration and development strategies. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the control of Eastmain, including, but not limited to he results of matters to be considered at the upcoming annual and special meeting of shareholders of Eastmain, the impact of general economic conditions, industry conditions, dependence upon regulatory approvals, the availability of financing, timely completion of proposed studies and technical reports, and risks associated with the exploration, development and mining industry generally such as economic factors as they affect exploration, future commodity prices, changes in interest rates, safety and security, political, social or economic developments, environmental risks, insurance risks, capital expenditures, operating or technical difficulties in connection with development activities, personnel relations, the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of Mineral Resources, contests over property title, and changes in project parameters as plans continue to be refined. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. The Company assumes no obligation to update such information, except as may be required by law. 4 EASTMAIN INVESTOR PRESENTATION ER:TSX www.eastmain.com

  4. EASTMAIN RESOURCES AGGRESSIVE EXPLORATION IN JAMES BAY, QUEBEC MOST ACTIVE  Recognized board MANAGEMENT  1,320 sq km of JUNIOR IN JAMES BAY and management STRENGTH properties team  Archean greenstone  Track record of belt exploration,  Emerging gold camp development and production success TOP LAND POSITION; 3 KEY ASSETS DISTRICT POTENTIAL  2-7 active drill rigs  Testing the growth Clearwater : Advancing Towards Development; 1 potential of 3 key Resource Update 3Q 2017, PEA 1Q 2018 assets  Significant Eastmain Mine: Historic resources 255,000 oz @ 10 g/t Au; infrastructure nearby 2 New Julien Discovery Eleonore South JV : Targeted gold-system drilling; 3 JV partners Goldcorp and Azimut 5 EASTMAIN INVESTOR PRESENTATION ER:TSX www.eastmain.com

  5. EASTMAIN CAPITAL STRUCTURE TSX:ER ANALYST SUPPORT CAPITAL STRUCTURE June 8, 2017 Shares outstanding 192,829,814 Options (W Avg Life – 5.4 yrs, $0.69) 9,188,605 Warrants (expiry 11/10/18 , $0.50) 6,899,999 Fully-Diluted 208,918,418 Market Capitalization (20-day VWAP) $81 million Share Price (20-day VWAP) $0.42 Pending new analyst 52 Week High/Low $0.97 - $0.38 Daily Avg Vol (20-day avg) 656,074 ANALYST PT (CONS) : $1.04 CASH & MARKETABLE SECURITIES * C $15 M * Details as of June 8, 2017, upon closing of the bought deal private placement. 6 EASTMAIN INVESTOR PRESENTATION ER:TSX www.eastmain.com

  6. SHAREHOLDER SUPPORT 2016 → 2017 INSTITUTIONAL SHAREHOLDERS - 37% 46% Polygon ⇡ 17.1 million 9.7% Integra Gold (Eldorado) ⇣ 8.9 million 5.1% INCREASE TO Van Eck ⇡ 8.1 million 4.6% INSTITUTIONAL HOLDERS RBC Asset Management (new) 7.7 million 4.3% Gabelli & Company ⇡ 3.6 million 2.0% 40 Konwave Gold 2000 ⇡ 2.8 million 1.7% Caisse du Depot (Sodémex) ⇡ 2.6 million 1.5% 35 Mackenzie Investments (new) 2.0 million 1.1% US Global ⇡ 2.0 million 1.1% 30 Industrial Alliance Inv Mgmt (new) 1.5 million 0.9% 25 AGF (new) 1.6 million 0.9% Commodity Discovery Fund (new) 1.5 million 0.9% 20 Evanachan (same) 1.0 million 0.6% SIDEX ⇡ 0.9 million 0.5% 15 INSIDERS - 2% 10 Claude Lemasson 1.3 million 0.7% Blair Schultz 1.0 million 0.6% 5 Joe Fazzini 0.3 million 0.1% Mike Hoffman 0.2 million 0.1% 0 2016 2017 Laurie Curtis 0.1 million 0.1% 7 EASTMAIN INVESTOR PRESENTATION ER:TSX www.eastmain.com

  7. BOARD AND MANAGEMENT STRENGTH IN ENGINEERING, GEOLOGY & CAPITAL MARKETS WELL-ESTABLISHED Laurence (Laurie) Curtis Blair Schultz BOARD OF DIRECTORS Chairman Capital markets experience Michael Hoffman Hervé Thiboutot, Geological Engineer Mine Engineer & Executive Integra Senior VP (Quebec) Claude Lemasson President & CEO and Director Claude Lemasson, P.Eng, MBA MANAGEMENT TEAM Bill McGuinty, P.Geo President & CEO VP Exploration • Highly-skilled mining professional • 30 yrs experience in Canada and Latin • 30 yrs of mine dev’t & operational experience America, from exploration to environmental and feasibility studies • Direct experience with Goldcorp’s Éléonore project in northern Québec Manuel Ng-Lai, P.Eng Project Engineer Joe Fazzini, CPA, CFA, CA • 10+ yrs in the technical services sector CFO & VP Corporate Development • 10+ yrs advising and auditing global gold and Carl Corriveau, P.Geo, SEG base metal producers through PwC & Dundee Exploration Manager Capital Markets. • 15+ yrs industry experience, including project management and evaluation, Alison Dwoskin, CPIR advancing projects from exploration Manager, Investor Relations through economic studies • 10+ yrs in mining Investor Relations 8 EASTMAIN INVESTOR PRESENTATION ER:TSX www.eastmain.com

  8. CENTRAL JAMES BAY GOLD CAMP CANADA’S EMERGING GOLD DISTRICT Production Exploration Life Cycle Development The Canadian Shield has Potential for many more James Bay is one of the Improved infrastructure produced over 200 million discoveries as exploration youngest camps in the to speed up pace of ounces of gold advances Canadian shield exploration District First Gold Production & Reserves Pour (Year) (Millions of Ounces ) Central James Bay 2014 7 Rice Lake 2005 2 Casa Berardi 1988 3 Detour 1983 23 Hemlo 1981 21 Chibougamau 1952 7 Red Lake 1930 28 Rouyn-Noranda 1927 20 Val D’or 1923 30 Kirkland Lake 1915 45 Timmins 1909 74 1. The production and reserve figure for James Bay Central Camp includes Eastmain’s resources as there are currently no reser ves. 2. The Eastmain mine extracted 40,000 ounces in 1995. 3. Casa Berardi and Chibougamau are located in Southern James Bay Source: Company reports, government studies, and academic journals. Compiled in 2016. 9 EASTMAIN INVESTOR PRESENTATION ER:TSX www.eastmain.com

  9. AN EMERGING GOLD CAMP SUPERIOR INFRASTRUCTURE – HIGH QUALITY ASSETS Total property portfolio - 132,088 hectares Chisasibi Radisson Radisson Éléonore Mine Renard Mine Wemindji Goldcorp Stornoway Eléonore South JV 3 1 Eastmain Mine Clearwater 2 Lac Elmer Lac Lessard Eastmain James Ruby Hill Bay Lidge Nemaska Waskaganish Reservoir Troilus Mine Copper One Lac Hudson Temiscamie Lac Clarkie Route 167 Nord Mistissini All-season road JAMES BAY, QUEBEC 50KM Note: Clearwater is accessible via a commercial airport at Nemaska, located 80 kms south of the project. Route 167 Nord has been constructed from Temiscamie north to the Renard Project, providing permanent road access to the Eastmain Mine project. 10 EASTMAIN INVESTOR PRESENTATION ER:TSX www.eastmain.com

  10. GROWTH FOCUSED 2018 PLANNING 2H2017 EXPLORATION PROGRAMS TRANSFORMATION GROWTH 4Q16 1Q17 2Q17 3Q17 4Q17 1Q18 CLEARWATER Resource definition drill campaign (63,000m) 2017 Program PROJECT 1 Updated mineral resource estimate Perform other technical optimization work Optimize and complete PEA and study work MINE PROJECT IP Survey EASTMAIN Drilling (7,500m) 2017 Program 2 Historic to NI43-101 mineral resource conversion ÉLÉONORE SOUTH JV 3 Drilling (5,000m) 2017 Program TODAY 11 EASTMAIN INVESTOR PRESENTATION ER:TSX www.eastmain.com

  11. THE DEVELOPMENT PATH ACCELERATING THE MOMENTUM Clearwater’s Eau Claire Deposit ( 80% spend) 1  Updated mineral resource – 3Q 2017  Baseline environmental studies - 2H 2017  Growth-focused exploration around Eau Claire and surrounding satellite targets - 2H 2017  PEA – 1Q 2018 ADVANCED EXPLORATION DEVELOPMENT PRODUCTION EXPLORATION Eastmain Mine Project (15% spend) Eléonore South JV (5% spend) 2 3  High-grade gold, silver and copper  Exploration targeting a gold  Historic resource conversion to NI 43-101 system prospective corridor next compliance - 4Q 2017 to world-class producing mine  Exploration along 10 km mine trend, with  JV Partners: Goldcorp and Azimut focus around the New Julien Discovery 12 EASTMAIN INVESTOR PRESENTATION ER:TSX www.eastmain.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.