Lake Placid CSD Capital Project Why a Capital Project? Maintain the Infrastructure of our Facilities Improve Safety & Security for Students and Staff Provide Modest Enhancements to improve programs & services 2015 BCS - High


slide-1
SLIDE 1

Lake Placid CSD

Capital Project

slide-2
SLIDE 2

Why a Capital Project?

  • Maintain the Infrastructure of our Facilities
  • Improve Safety & Security for Students and Staff
  • Provide Modest Enhancements to improve programs & services

2015 BCS - High School | Mosaic Associates Architects

slide-3
SLIDE 3

Infrastructure

slide-4
SLIDE 4

Lake Placid Elementary School

slide-5
SLIDE 5

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Replace original 1975 windows and doors

slide-6
SLIDE 6

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Reconstruct exterior masonry columns near Cafeteria

slide-7
SLIDE 7

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Replace elevator cab, reuse existing shaft

slide-8
SLIDE 8

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Reconstruct asphalt paving from Boiler Room to parking lot (regrade)

slide-9
SLIDE 9

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Reconstruct loading dock columns and main beam/concrete slab

Photo of existing sign Picture or drawing of a digital sign

slide-10
SLIDE 10

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Add DDC control to all UVs

Photo of UV

slide-11
SLIDE 11

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Upgrade main electrical service

slide-12
SLIDE 12

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Roofing – overlay existing (approx. 30,000 sf)

slide-13
SLIDE 13

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Exterior lighting – building mounted, full perimeter

slide-14
SLIDE 14

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Replace original air handler

slide-15
SLIDE 15

Lake Placid Middle/High School

slide-16
SLIDE 16

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Replace auditorium air handling units

slide-17
SLIDE 17

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Replace remaining 1973 unit ventilators

slide-18
SLIDE 18

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Convert building from steam to HW. Upgrade heating system – building wide.

slide-19
SLIDE 19

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Add ventilation to rooms 316, 316A, 314, 305, and Rm 211 (SED required)

slide-20
SLIDE 20

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Replace domestic HW boiler

slide-21
SLIDE 21

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Reconstruct existing roofing, skylights, and roof access hatch over

  • riginal 1920’s portion of building
slide-22
SLIDE 22

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Reconstruct concrete retaining wall at School Street and adjacent to Olympic Oval

slide-23
SLIDE 23

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Replace 1970’s wing windows/insulation

slide-24
SLIDE 24

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Upgrade distribution (hallway panels 6ft AFF) and main distribution in basement

slide-25
SLIDE 25

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Reconstruct/overlay exterior stairs (front of building – south side)

slide-26
SLIDE 26

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Replace elevator cab (bay state), reuse existing shaft

slide-27
SLIDE 27

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Reconstruct stairs from Cummings Road to front of building (North Side)

slide-28
SLIDE 28

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Reconstruct ramp at 1970 entrance, add canopy & walls to enclose

slide-29
SLIDE 29

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Reconstruct concrete retaining/fencing adjacent to south entrance & loading dock

slide-30
SLIDE 30

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Reconstruct sloping retaining wall under 1970 addition

slide-31
SLIDE 31

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Replace original exhaust fans and roof vents

slide-32
SLIDE 32

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Roofing- re seam/overlay existing (approx. 34,400 sf)

slide-33
SLIDE 33

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Exterior lighting – building mounted, full perimeter

slide-34
SLIDE 34

2016 Pre-Referendum Study – Horse Show Grounds | Mosaic Associates Architects

Resurface track at Horse Show Grounds.

slide-35
SLIDE 35

Safety and Security

slide-36
SLIDE 36

Lake Placid Elementary School

slide-37
SLIDE 37

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Provide security vestibule (add roof and wall at elevated walk)

slide-38
SLIDE 38

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Provide impact resistant film on non-tempered doors/windows – building wide interior

slide-39
SLIDE 39

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Provide bullet resistant film on first floor exterior glass

slide-40
SLIDE 40

Lake Placid Middle/High School

slide-41
SLIDE 41

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Provide security vestibule addition (rear)

slide-42
SLIDE 42

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Provide impact resistant film on non-tempered doors/windows – building wide interior

slide-43
SLIDE 43

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Provide bullet resistant film on first floor exterior glass

slide-44
SLIDE 44

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Provide aisle lighting for auditorium (SED required)

slide-45
SLIDE 45

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Auditorium - Replace railing at balcony

slide-46
SLIDE 46

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Provide stairs at side of District Office

slide-47
SLIDE 47

Enhancements

slide-48
SLIDE 48

Lake Placid Elementary School

slide-49
SLIDE 49

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Signage and landscaping

Photo of existing sign

slide-50
SLIDE 50

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Original 1975 Building – Reconstruct restrooms, both floors

slide-51
SLIDE 51

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Glass enclosure, vestibule to loop entrance

Floor Plan

slide-52
SLIDE 52

2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

Main office reconstruction

slide-53
SLIDE 53

Lake Placid Middle/High School

slide-54
SLIDE 54

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Build storage under 1975 addition

slide-55
SLIDE 55

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Add road access to front of building (part of #16)

slide-56
SLIDE 56

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Gym storage addition

slide-57
SLIDE 57

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Signage and landscaping (location to be determined)

L ake Plac id Middle / High S c ho o l

slide-58
SLIDE 58

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Auditorium - Seating (includes ADA requirements)

slide-59
SLIDE 59

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Auditorium - Ceilings/lighting

slide-60
SLIDE 60

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Auditorium - Wings/storage area below

slide-61
SLIDE 61

2016 Pre-Referendum Study – High School | Mosaic Associates Architects

Auditorium - Sound system

slide-62
SLIDE 62

2016 Pre-Referendum Study – Shipman Youth Center | Mosaic Associates Architects

Provide (2) tennis courts at Shipman Site.

slide-63
SLIDE 63

2015 BCS - High School | Mosaic Associates Architects

Finances

49 Separate Items ≈ $21 Million NYS Building Aid of 30% ≈ $6 Million Total Cost after Building Aid ≈ $15 Million Annual Cost of Bonded Debt ≈ $1 Million Total Change to the Annual Budget After 2001 Bond Payoff ≈ $ 0

slide-64
SLIDE 64

2015 BCS - High School | Mosaic Associates Architects

slide-65
SLIDE 65

2015 BCS - High School | Mosaic Associates Architects

We Want Your ….

slide-66
SLIDE 66

2015 BCS - High School | Mosaic Associates Architects

Questions ?