  1. Lake Placid CSD Capital Project

  2. Why a Capital Project? • Maintain the Infrastructure of our Facilities • Improve Safety & Security for Students and Staff • Provide Modest Enhancements to improve programs & services 2015 BCS - High School | Mosaic Associates Architects

  3. Infrastructure

  4. Lake Placid Elementary School

  5. Replace original 1975 windows and doors 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  6. Reconstruct exterior masonry columns near Cafeteria 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  7. Replace elevator cab, reuse existing shaft 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  8. Reconstruct asphalt paving from Boiler Room to parking lot (regrade) 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  9. Photo of Picture or existing sign drawing of a digital sign Reconstruct loading dock columns and main beam/concrete slab 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  10. Photo of UV Add DDC control to all UVs 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  11. Upgrade main electrical service 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  12. Roofing – overlay existing (approx. 30,000 sf) 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  13. Exterior lighting – building mounted, full perimeter 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  14. Replace original air handler 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  15. Lake Placid Middle/High School

  16. Replace auditorium air handling units 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  17. Replace remaining 1973 unit ventilators 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  18. Convert building from steam to HW. Upgrade heating system – building wide. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  19. Add ventilation to rooms 316, 316A, 314, 305, and Rm 211 (SED required) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  20. Replace domestic HW boiler 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  21. Reconstruct existing roofing, skylights, and roof access hatch over original 1920’s portion of building 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  22. Reconstruct concrete retaining wall at School Street and adjacent to Olympic Oval 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  23. Replace 1970’s wing windows/insulation 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  24. Upgrade distribution (hallway panels 6ft AFF) and main distribution in basement 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  25. Reconstruct/overlay exterior stairs (front of building – south side) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  26. Replace elevator cab (bay state), reuse existing shaft 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  27. Reconstruct stairs from Cummings Road to front of building (North Side) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  28. Reconstruct ramp at 1970 entrance, add canopy & walls to enclose 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  29. Reconstruct concrete retaining/fencing adjacent to south entrance & loading dock 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  30. Reconstruct sloping retaining wall under 1970 addition 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  31. Replace original exhaust fans and roof vents 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  32. Roofing- re seam/overlay existing (approx. 34,400 sf) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  33. Exterior lighting – building mounted, full perimeter 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  34. Resurface track at Horse Show Grounds. 2016 Pre-Referendum Study – Horse Show Grounds | Mosaic Associates Architects

  35. Safety and Security

  36. Lake Placid Elementary School

  37. Provide security vestibule (add roof and wall at elevated walk) 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  38. Provide impact resistant film on non-tempered doors/windows – building wide interior 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  39. Provide bullet resistant film on first floor exterior glass 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  40. Lake Placid Middle/High School

  41. Provide security vestibule addition (rear) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  42. Provide impact resistant film on non-tempered doors/windows – building wide interior 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  43. Provide bullet resistant film on first floor exterior glass 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  44. Provide aisle lighting for auditorium (SED required) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  45. Auditorium - Replace railing at balcony 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  46. Provide stairs at side of District Office 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  47. Enhancements

  48. Lake Placid Elementary School

  49. Photo of existing sign Signage and landscaping 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  50. Original 1975 Building – Reconstruct restrooms, both floors 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  51. Floor Plan Glass enclosure, vestibule to loop entrance 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  52. Main office reconstruction 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects

  53. Lake Placid Middle/High School

  54. Build storage under 1975 addition 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  55. Add road access to front of building (part of #16) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  56. Gym storage addition 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  57. L ake Plac id Middle / High S c ho o l Signage and landscaping (location to be determined) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  58. Auditorium - Seating (includes ADA requirements) 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  59. Auditorium - Ceilings/lighting 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  60. Auditorium - Wings/storage area below 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  61. Auditorium - Sound system 2016 Pre-Referendum Study – High School | Mosaic Associates Architects

  62. Provide (2) tennis courts at Shipman Site. 2016 Pre-Referendum Study – Shipman Youth Center | Mosaic Associates Architects

  63. Finances 49 Separate Items ≈ $21 Million NYS Building Aid of 30% ≈ $6 Million Total Cost after Building Aid ≈ $15 Million Annual Cost of Bonded Debt ≈ $1 Million Total Change to the Annual Budget After 2001 Bond Payoff ≈ $ 0 2015 BCS - High School | Mosaic Associates Architects

  64. 2015 BCS - High School | Mosaic Associates Architects

  65. We Want Your …. 2015 BCS - High School | Mosaic Associates Architects

  66. Questions ? 2015 BCS - High School | Mosaic Associates Architects

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend