l e xing to n i i
play

L e xing to n I I Pre se nta tio n Outline a t Ma rke t Sq ua re - PDF document

L e xing to n I I Pre se nta tio n Outline a t Ma rke t Sq ua re No rth, Wa shing to n D.C. Building Summa ry E xisting Struc ture Pro po sa l Gra vity Syste m L a te ra l Syste m Othe r Struc tura l F a c to rs Co nstruc tio n Ma


  1. L e xing to n I I Pre se nta tio n Outline a t Ma rke t Sq ua re No rth, Wa shing to n D.C. Building Summa ry E xisting Struc ture Pro po sa l Gra vity Syste m L a te ra l Syste m Othe r Struc tura l F a c to rs Co nstruc tio n Ma na g e me nt Me c ha nic a l Co nc lusio n Ale xis Pa c e lla – Struc tural Optio n Building Summa ry Building Summa ry 12 Sto ry Re side ntia l T o we r Ma rke t Sq ua re No rth Co mple x 3 b e lo w g ra de le ve ls 72,000 sq ft 49 Apa rtme nt Units Co mple te d in 2002 Pre se nta tio n Outline E xisting Struc ture Building Summa ry Gra vity Syste m: E xisting Str uc tur e 2 Wa y F lat Plate Slab Pro po sa l 8 inc he s Gra vity Syste m I rre g ula r Co lumn L ayo ut Small Ba ys L a te ra l Syste m Othe r Struc tura l F a c to rs L a te ra l Syste m: Co nstruc tio n Ma na g e me nt She a r Wa lls Me c ha nic a l Co nc lusio n F o unda tio n: MAT 1

  2. Pre se nta tio n Outline Pro po sa l Building Summa ry E xisting Struc ture Cur r e nt de sign r e str ic te d by he ight limit: 130 fe e t (c ur r e nt he ight = 125 ft w/ pe nthouse ) Pr oposal Gra vity Syste m Only str uc tur e s with a thin floor sandwic h, suc h as flat L a te ra l Syste m plate and pr e -stre sse d we r e c onside r e d Othe r Struc tura l F a c to rs Whe n he ight r e str ic tion is not a fac tor , Co nstruc tio n Ma na g e me nt Can A More E c onomic Syste m be Me c ha nic a l F ound??? Co nc lusio n Pro po sa l Pre se nta tio n Outline Building Summa ry E xisting Struc ture Ho w will a ste e l struc tura l syste m e ffe c t… Pro po sa l Othe r b uilding syste ms Gr avity Syste m L a te ra l Syste m T ime Othe r Struc tura l F a c to rs COST Co nstruc tio n Ma na g e me nt Me c ha nic a l Co nc lusio n Gra vity Syste m Gra vity Syste m Composite : Ne w c olumn layout r e quir e d for ste e l syste m to be Ste e l c o mpo site de c k o n ste e l b e a ms a nd e c onomic al c o lumns Doe s not inte r fe r e Re la tive ly shallo w flo o r sa ndwic h w/ ar c hite c tur e No la rg e c ha ng e in stiffne ss a nd vib ra tio n Windows move d Ste e l is usually mo st c o st e ffe c tive One c lose t obstr uc te d Additio nal c o st a nd la b o r fo r fire pro o fing a nd c o nne c tio ns 2

  3. Gra vity Syste m Gra vity Syste m Be ams, c olumns, and she ar studs we r e de signe d for Composite De c king: gr avity loads using RAM softwar e . Spa n is to o lo ng , b ise c t e a c h b a y with a b e a m Unsho re d sa ve s o n la b o r a nd ma te ria l Unsho re d will use e xtra c o nc re te R e side ntial L e ve ls: 2” L OK floor de c k with 4.5” slab Public L e ve ls: 3” L OK de c k with 5.5”slab 3 rd E De c king c ho se n fro m USD c a ta lo g . RAM c rite ria se t to L RDF ditio n Gra vity Syste m Pre se nta tio n Outline Building Summa ry F inal De sig n: E xisting Struc ture Pro po sa l 4.5” de c k + slab Gra vity Syste m 12” b e a m L ate ral Syste m Othe r Struc tura l F a c to rs = 16.5” T otal floor sandwic h de pth Co nstruc tio n Ma na g e me nt Me c ha nic a l nc re a se o f 8.5” pe r flo o r � 8.5’ to ta l I Co nc lusio n Ne w He ig ht = 133.5’ > Allo wa ble 130’ L a te ra l Syste m L a te ra l Syste m 3 po ssible L a te ral Syste ms: She ar Walls: She a r Wa lls Che c k E xisting Walls Mo me nt F ra me s E T ABS Bra c e d F ra me s R e sults: L oc ate d ar High str Will not obstr e ngth and stiffne ss ound e le vator uc t bays shaft Sur r ound E le vator Shaft Ar c hite c tur Costly c onne c tions al F E asy to e r e atur e of the building e c t Ste e l � L We ight � L ighte r e ss Se ismic L oad e ase � Slightly Gre ate r 8.5’ he ight inc r Wind L oad 3

  4. L a te ra l Syste m L a te ra l Syste m Br ac e d F r ame s: ST AAD De sig n: F ind lo c a tio n in b uilding Distrib ute L o a ds b y Rig idity Che vro n Bra c e s Che c k ASCE 7 wind c a se s Me mb e r Stre sse s Co ntro lle d De sig n, c he c k o n ST AAD Size Ra ng e : W12x65 – W12X170 De sign was c ontrolle d by T o tal De fle c tio n < 3.6” a llo wa ble allowable str e ss L a te ra l Syste m Pre se nta tio n Outline F inal De sig n: Building Summa ry So me c o lumns c o ntro lle d E xisting Struc ture b y b ia xia l b e nding � Pro po sa l inc re a se d size Gra vity Syste m ⎛ ⎞ L a te ra l Syste m Pu Mux Muy ⎜ ⎟ + + ≤ ⎜ ⎟ 1 φ φ φ ⎝ ⎠ 2 Pn Mnx Mny Othe r Str uc tur al F ac tor s Co nstruc tio n Ma na g e me nt Size s: W12x65 – W14x342 Me c ha nic a l F ina l De fle c tio n = 2.7” Co nc lusio n < 3.6” a llo wa b le Othe r Struc tura l F a c to rs Othe r Struc tura l F a c to rs Be am to Column Conne c tions: Are the re o the r issue s with the struc ture to b e c o nside re d? Stiffe ne rs Re q uire d Co nne c tio ns Sub struc ture F o unda tio n ypic a l 7 th flo o r c o nne c tio n T 4

  5. Othe r Struc tura l F a c to rs Othe r Struc tura l F a c to rs He avy Br ac ing Conne c tion: T he Sub struc ture : Unifo rm F o rc e Me tho d Co nc re te is b e tte r in sub te rra ne a n Sa me b e a m to c o nditio ns c o lumn c o nne c tio n Additio na l b uilding we ig ht 27”x27”x1/ 2” g usse t Co nc re te is a mo re dura ble pa rking pla te struc ture 3”x3”x1/ 2” a ng le s ypic a l 7 th flo o r c o nne c tio n T Othe r Struc tura l F a c to rs Othe r Struc tura l F a c to rs Sub struc ture : Sub struc ture : Girde rs: 24”x15” One wa y jo ist flo o r ~e a sy to c o nstruc t to p ste e l = 7 # 9’ s ~wo rks with ne w b a y size s b o tto m ste e l = 4 # 8’ s Girde r Se c tio n 20” pa ns; 5” rib s; 25” o .c . Re info rc e me nt Cuto ffs Stirrup Pla c e me nt Othe r Struc tura l F a c to rs Othe r Struc tura l F a c to rs Sub struc ture : Sub struc ture : Co lumns: Be lo w the Bra c e d F ra me s: Co nne c tio ns ~ a b a se pla te sunk into flo o r sla b a t e a c h c o lumn She a r wa lls we re use d, she a r c o ntro lle d 5

  6. Pre se nta tio n Outline Othe r Struc tura l F a c to rs F o unda tio n: Building Summa ry E xisting MAT fo unda tio n E xisting Struc ture Pro po sa l Punc hing she a r Gra vity Syste m Ove rturning L a te ra l Syste m Othe r Struc tura l F a c to rs No Pr oble ms Constr uc tion Manage me nt Me c ha nic a l Co nc lusio n F o rc e s a ffe c ting o ve rturning Co nstruc tio n Ma na g e me nt Co nstruc tio n Ma na g e me nt Site L a yo ut: Co nstruc tio n Ma na g e me nt I ssue s: Ne e de d spa c e s: o ffic e s, c irc ula tio n Site L a yo ut pa ths, sto ra g e , e tc … Co st Ste e l De sig n ~ Cra ne Sc he duling ~ L a y Do wn Are a Co nstruc tio n Ma na g e me nt Co nstruc tio n Ma na g e me nt Co st : Co nc re te ......................................$1,526,000 Ste e l ………………………………...$1,455,600 Save s $70,000 Building Sc ale is no t la rg e e no ug h to T his do e s no t ho we ve r a c c o unt fo r c o st de ve lo p full e c o no my a sso c ia te d with a due to e xtra fa ç a de ma te rial o r ste e l struc ture fire pro o fing 6

  7. Pre se nta tio n Outline Co nstruc tio n Ma na g e me nt Building Summa ry Sc he duling : E xisting Struc ture E a c h le ve l is built in the se q ue nc e : Pro po sa l 1 da y fo r c o lumns a nd b e a ms Gra vity Syste m 2 da ys fo r de c k L a te ra l Syste m Ne xt le ve l is sta rte d Othe r Struc tura l F a c to rs Sla b s po ure d whe n b e a m, c o lumn, a nd de c k Co nstruc tio n Ma na g e me nt c o nstruc tio n is 3 sto rie s a he a d. Me c hanic al T o ta l: 18 we e ks Co nc lusio n Me c ha nic a l Me c ha nic a l HVAC: Me c ha nic al Co nside ra tio ns: F re sh a ir re q uire me nts a re me t b y windo ws HVAC Ac o ustic s Me c ha nic a l Me c ha nic a l HVAC: ME P Syste ms c a n b e mo ve d fro m so ffits into c e iling sa ndwic h. Be a ms sho uld no t b e inte rse c te d . E xha ust Supply 7

  8. Me c ha nic a l Me c ha nic a l Ac o ustic s: Ac o ustic s: Orig inal Syste m: Co nc re te c e iling s with Ac o ustic T ile s o n suspe nde d c e iling spra ye d a c o ustic a l se ala nt Asse mbly I ssue s NRF = .75 Ste e l Syste m: Suspe nde d c e iling with a c o ustic a l tile s NRF = .5 to .95 Pre se nta tio n Outline Co nc lusio ns Building Summa ry E xisting Struc ture Str uc tur al de sign was c ontr olle d by he ight r e str ic tion Pro po sa l Composite : Gra vity Syste m L ar ge r Bays L a te ra l Syste m Othe r Struc tura l F a c to rs Wor ks we ll with othe r inte grate d syste ms Co nstruc tio n Ma na g e me nt F ull E c onomy of Ste e l Savings was not ac hie ve d Me c ha nic a l Conc lusion Que stions? 8

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend