Kennington Park Community Liaison Group 25 July 2019 1 Kennington - - PowerPoint PPT Presentation

Northern Line Extension Kennington Park Community Liaison Group 25 July 2019 1 Kennington Park May to July 2 Kennington Park July to October 3 Kennington Park Works Timeline Activity Start Date End Date Construction of basement


slide-1
SLIDE 1

1

Northern Line Extension Kennington Park Community Liaison Group 25 July 2019

slide-2
SLIDE 2

2

Kennington Park – May to July

slide-3
SLIDE 3

3

Kennington Park – July to October

slide-4
SLIDE 4

4 Activity Start Date End Date

Construction of basement – roof, walls, staircases – additional time required due to sequencing of works May 2018 July 2019 Kennington Park Headhouse – Above Ground Structure additional time required due to sequencing of works – does not affect overall completion January 2019 July 2019 Kennington Park Headhouse - Brickwork Facade August 2019 November 2019 Excavation around perimeter of basement to enable waterproofing to be installed. August 2019 Sept 2019 Utility works scheduled to take place at the on Kennington Park Place and St Agnes Place – date change to align with UKPN and Thames Water works – provisional Sept 2019 October 2019 Mechanical & Electrical Installation of equipment inside the headhouse structure February 2019 Spring 2020 Hard and Soft Landscaping Kennington Green – removal of remaining foundations and concrete surface from site, removal of hoardings etc Commencement early Spring - Summer 2020 Actual planting dates will be reviewed with our specialist suppliers

Kennington Park – Works Timeline

slide-5
SLIDE 5

5

  • We continue to Work Related Road Risk (WRRR)

driver training awareness for vulnerable road users, IE cyclists.

  • 100% WRRR compliance is being maintained.
  • Once abnormal deliveries have been authorised

by the metropolitan police we alert the residents under section 61 explaining the reasons for either working early/late. In addition, there are no planned abnormal loads at present.

  • Montford Place continues to be the holding area

for deliveries for Ken Park and Ken Green sites

  • July to October will be mainly lorries with pipework,

ducting, electrical and mechanical equipment & light plant delivery lorries, visiting cranes will be required.

  • Approx. 5-6 deliveries per day.

Kennington Park – Site Deliveries

slide-6
SLIDE 6

6

Environmental Monitoring Locations

Monitoring stations and sensitive receptors

slide-7
SLIDE 7

7

Noise Monitoring; Daytime 10Hr Avg

slide-8
SLIDE 8

8

Noise Monitoring; Daytime 10Hr Avg

slide-9
SLIDE 9

9

Dust Monitoring – Glass Slides

slide-10
SLIDE 10

10 10 10

Air Quality

Dust slides results

slide-11
SLIDE 11

11

Complaints and enquiries summary

Stats for Kennington Park between 25 April and 24 July 2019 Case Status: Total: 4 cases Active: 0 (0%) Resolved: 2 (100%) Case Type: Total: 4 cases TfL enquiry: 2 (50%) Enquiry: 1 (25%) Complaint 1 (25%)

slide-12
SLIDE 12

12

Community Engagement and NLE Skills and Employment

School engagement events: Air pollution workshop - Sacred Heart (Southwark - pic) Engineering talk – St George’s Primary (Wandsworth) Women in STEM – Harris 6th form (Westminster) Careers networking – Graveney School (Wandsworth) Site tours at Battersea: 60 students from St Thomas the Apostle (Southwark) 70 students from Scared Heart (Southwark)

slide-13
SLIDE 13

13 13

  • It is important that calls are logged through

the NLE helpdesk on 0343 222 2424 (Option 1)

  • Email nle@tfl.gov.uk
  • Drop In sessions
  • Please visit:

https://tfl.gov.uk/northern-line-extension

Ways to contact