Kenilworth Parkside Recreation Center COMMUNITY WORKSHOP OCTOBER 02, 2014 Agenda Review Public Engagement Findings Selected Design Scheme Option D Design Program Updated Concept Design Detailed planning for major spaces


slide-1
SLIDE 1

Kenilworth Parkside Recreation Center

COMMUNITY WORKSHOP OCTOBER 02, 2014

slide-2
SLIDE 2

Agenda

 Review Public Engagement Findings

 Selected Design Scheme Option D  Design Program  Updated Concept Design  Detailed planning for major spaces

 Visual Preferences  Project Timeline  Next Steps

slide-3
SLIDE 3

Selected Design Scheme D

 Refurbished first floor  Gymnasium  Outdoor pool  No outdoor facilities

Site Plan

slide-4
SLIDE 4

Selected Design Scheme D

 Refurbished first floor

 Multipurpose room  Boxing area  Fitness area  Senior’s room  Teen’s room  Kitchen

 New Additions

 Gymnasium  Outdoor aquatics facility

 Limited Site

Improvements

 Parking  Entrance Plaza

First Floor Plan

slide-5
SLIDE 5

Selected Design Scheme D

Isometric View

slide-6
SLIDE 6

Selected Design Scheme D

 First Floor

 Recreation Center

 Second Floor

 DCPNI

 Third Floor

 DCPNI Exploded Axonometric

slide-7
SLIDE 7

Proposed Concept Design

 Outdoor Activities

 Entrance plaza as

event space such as farmer’s market.

 Entry courtyard

between pool and gymnasium.

 Outdoor sit-out around

pool.

 Other landscaping

elements in future.

Site Plan

slide-8
SLIDE 8

Summary of Spaces

Program Area as per Master Plan (SQ.FT) Area Provided (SQ.FT)

Recreation Center Gymnasium 9000 9700 Fitness Center 2200 2025 Multipurpose Room 2200 2025 Boxing 2200 2000 Senior’s Room 1200 1600 Teen’s Room 1200 1500 Kitchen 300 800 Computer Lab

  • 700

Locker Room 1400 750 Restroom 800 350 Family Change

  • 75

Office / Front Desk 600 500 Lobby 800 1500 General Storage 400 525 Electrical + Recycling

  • 400

Total 22,300 24,450 Pool House Lockers/ Restroom

  • 1000

Family Change

  • 200

First Aid/ Lifeguard room

  • 100

Pool Equipments + Mechanical

  • 750

Total

  • 2050
slide-9
SLIDE 9

Proposed Concept Design

 Design Considerations

 Pool house as separate

structure, can be shut during off-season.

 Corridor space between

gym and senior lounge to use the existing windows.

 Senior and teen lounge

separated by storage and kitchen.

 Outdoor access from

senior lounge.

 Skylights for spaces with

low roofs.

 Recycle room is shared

conveniently located with entry from site, recreation center and DCPNI.

First Floor Plan

slide-10
SLIDE 10

Detail Plan- Locker rooms

Existing Kitchen Image

slide-11
SLIDE 11

Detail Plan - Gymnasium

slide-12
SLIDE 12

Detail Plan - Kitchen

slide-13
SLIDE 13

Detail Plan- Pool House

slide-14
SLIDE 14

Existing

ORD STREET

slide-15
SLIDE 15

Proposed

ORD STREET

slide-16
SLIDE 16

Entrance Plaza as Parking Lot

ORD STREET

slide-17
SLIDE 17

Entrance Plaza for Community Events

ORD STREET

slide-18
SLIDE 18
  • C. Farmer’s Market
  • D. Outdoor Movie Screening

Entrance Plaza Activities Examples

  • A. Paved plaza with landscaping
  • B. Green walls at entrance
slide-19
SLIDE 19

Existing

ORD STREET ENTRANCE

slide-20
SLIDE 20

Proposed

ORD STREET ENTRANCE

slide-21
SLIDE 21

Trellis Pool House Pathway Examples

Ground Features Spray Features Tot Slides Zero Depth Pool E F G H

slide-22
SLIDE 22

Existing

PARKING LOT+ TOT LOT

slide-23
SLIDE 23

Proposed

GYMNASIUM

slide-24
SLIDE 24

Gymnasium Examples

I M L N K J

slide-25
SLIDE 25

Gymnasium Examples

O S R T Q P

slide-26
SLIDE 26

Pool Examples

Spray Features U V W X

slide-27
SLIDE 27

Sustainable Building Design- LEED Gold

 LEED certified buildings save money and resources

and have a positive impact on the health of

  • ccupants, while promoting renewable, clean energy.

OUR GOAL

slide-28
SLIDE 28

Shade and Shadow Study

 Solar Study helps to determine day lighting, location of

green roofs, and solar panels.

slide-29
SLIDE 29

Solar Opportunity Study

  • Y. Solar Panels
  • Z. Green Roofs
slide-30
SLIDE 30

Project Timeline

Concept Design Selection DESIGN CONSTRUCTION Recreation Center Opening Schematic Design Design Development Construction Documents Final Permits

MARCH 2014 APRIL 2016 FALL 2014 WINTER 2014 SUMMER 2015 SPRING 2014

slide-31
SLIDE 31

Next Steps

 Analyze preferences  Survey and investigation  Further Design and Preliminary Engineering  Preliminary Schematic Design  Next meeting: October 29th 2014 Evening