JUNE 20, 2017 1 DE DESIGN GN & C CON ONST STRU RUCT - - PowerPoint PPT Presentation

june 20 2017
SMART_READER_LITE
LIVE PREVIEW

JUNE 20, 2017 1 DE DESIGN GN & C CON ONST STRU RUCT - - PowerPoint PPT Presentation

JUNE 20, 2017 1 DE DESIGN GN & C CON ONST STRU RUCT CTION ION 2 PROJE OJECT CT DE DEVEL VELOPMENT OPMENT Ph Phase e 1, Segment ent 1- (Tunnel el Inle let to Houston Stree eet) t) 90% design plan submittal in February


slide-1
SLIDE 1

JUNE 20, 2017

1

slide-2
SLIDE 2

DE DESIGN GN & C CON ONST STRU RUCT CTION ION

2

slide-3
SLIDE 3

PROJE OJECT CT DE DEVEL VELOPMENT OPMENT

Ph Phase e 1, Segment ent 1- (Tunnel

el Inle let to Houston Stree eet) t)

  • 90% design plan submittal in February 2017
  • Progress of construction in Phase 1, Segment 1
  • n schedule for completion on May 5, 2018

3

slide-4
SLIDE 4

PROJE OJECT CT DE DEVEL VELOPMENT OPMENT

Ph Phase e 1, Segment ent 2- (Houston

  • n Stree

eet t to Cesar r Chavez ez Blvd) lvd)

  • 90% design plan submittal
  • Dependent upon final approval of art elements by

Commissioners Court

  • Additional art elements require revisions to the

design that will impact schedule for submittal

  • SDJV will submit an initial cost estimate for

Phase 1, Segment 2 in August and a full GMP eight weeks after 90% design submittal

4

slide-5
SLIDE 5

DE DESIGN SIGN DE DEVEL VELOPMENT OPMENT

Ph Phase e 2- (G (Guadalupe alupe Street eet to South uth Ala lamo

  • Street)

eet)

  • Design for Phase 2 will resume upon

completion of design for Phase 1

5

slide-6
SLIDE 6

CONST NSTRUCTION RUCTION ACT CTIVITIES VITIES

6

slide-7
SLIDE 7

CONST NSTRUCTION RUCTION ACT CTIVITIES VITIES

7

slide-8
SLIDE 8

CONST NSTRUCTION RUCTION ACT CTIVITIES VITIES

8

slide-9
SLIDE 9

CONST NSTRUCTION RUCTION ACT CTIVITIES VITIES

9

slide-10
SLIDE 10

Construction tours held for public, stakeholders, students, committee members, elected

  • fficials

10

CONSTRUCTION ACTIVITIES

slide-11
SLIDE 11

AR ART P T PROG OGRA RAM

11

slide-12
SLIDE 12

Tricentennial Plaza West Bank between Santa Rosa Street and Martin Street West Bank between Martin Street and Travis Street East Bank between Travis Street and Houston Street West Bank between Travis Street and Houston Street Bridges: Santa Rosa, Martin, Travis Tile Patterns and Word Art: multiple locations

Permanent rmanent Artwork

  • rk Over

Overview view

slide-13
SLIDE 13

Temp mporar

  • rary

y Artwor twork k Over Overview view

Deck Overlook Martin Street Crosswalk

slide-14
SLIDE 14

JO JORGE GE RODR DRIGUEZ IGUEZ-GERAD GERADA

Americ ican an artis ist t based d in Barcelona,

  • na, Spain

in

Tricentennial Plaza

slide-15
SLIDE 15

Co Concept ncept

Stain ainles less s ste teel l and alumin inum

“Plethora refers to the sustenance that San Pedro Creek represents to the San Antonio community. The title of the sculpture, phonetically understood in both Spanish and English, alludes to the great abundance of water and how it irrigates the social fabric that feeds, grows and recognizes itself through a collective outlook, just like the primordial path of the water.”

slide-16
SLIDE 16

Co Concept ncept

Stain ainles less s ste teel l and alumin inum

slide-17
SLIDE 17

DI DIANA ANA KERSEY RSEY

San Anto tonio,

  • , TX

Bridges: Santa Rosa, Martin, Travis

slide-18
SLIDE 18

Co Concept ncept

Ceram amic inserts ts at street t leve vel

slide-19
SLIDE 19

MIC ICHAEL HAEL MEN ENCHA CHACA CA JO JOHN HN PHILLIP HILLIP SA SANT NTOS OS

San Antonio nio, TX

Tile Patterns and Word Art: multiple locations

slide-20
SLIDE 20

ADR DRIANA IANA GARCIA CIA

San Anto tonio,

  • , TX

West Bank between Santa Rosa Street and Martin Street

slide-21
SLIDE 21

Th Theme me: : From m All Road ads, s, We Are One

slide-22
SLIDE 22

Co Concept ncept

Painted d mural l conve verted d to to ceramic ic tile

“The composition tells the story

  • f how the springs brought forth

growth in San Antonio. The left is to represent the west, the right is to represent the east.”

slide-23
SLIDE 23

KATIE TIE PELL ELL

San Anto tonio,

  • , TX

West Bank between Martin Street and Travis Street

slide-24
SLIDE 24

Th Theme: eme: Los

  • st

t Wildli ldlife fe

slide-25
SLIDE 25

Co Concept ncept

Painted d mural l conve verted d to to ceramic ic tile People rendered for scale

slide-26
SLIDE 26

ALEX X RUB UBIO IO

San n Antonio, io, TX

East Bank between Travis Street and Houston Street

slide-27
SLIDE 27

Th Theme: eme: Water er Fl Flow

  • w
slide-28
SLIDE 28

Co Concept ncept

Painted d mural l conve verted d to to ceramic ic tile

“The curvilinear line quality will depict flowing water in variations

  • f blue tones with an accent of

aqua blue and white.”

slide-29
SLIDE 29

JO JOE LOPEZ PEZ

San n Antonio, io, TX

West Bank between Travis Street and Houston Street

slide-30
SLIDE 30

Th Them eme: e: Alam ameda eda Th Thea eater er Com

  • mmu

munity nity

slide-31
SLIDE 31

Co Concept ncept

Painted d mural l conve verted d to to ceramic ic tile

“My work captures the vibrant community that once enlivened the Alameda Theater. The work depicts the ‘El Carazon,’ the heart of downtown San

  • Antonio. The Alameda was an escape

from the harsh reality of life.”

slide-32
SLIDE 32

PR PRE-QU QUALIF ALIFIED ED LIST T OF ARTI TISTS TS

  • Deadline: June 30, 2017
  • Applications via www.PublicArtist.org
  • Artwork Opportunities (permanent and temporary):
  • Large-scale murals
  • Light or sound based artwork
  • Integrated or functional artwork on bridges and pathways
  • Large and small-scale sculpture in landscape areas
  • Building facades adjacent to the creek
  • Interactive or performance-based artwork
  • Digital projections at bridge underpasses
  • Serving on a design team for future phases of the project
slide-33
SLIDE 33

ARTS TS & CUL CULTURE TURE ALLI LLIANCE ANCE

The San Pedro Creek Arts & Alliance is a collaboration of local arts organizations and artists who are interested in the development of cultural opportunities along the creek

slide-34
SLIDE 34

QU QUES ESTI TIONS? ONS?

slide-35
SLIDE 35

Westside Creeks Linear Creekway Trails Project and Elmendorf Lake Park

Dustin Moore June 20, 2017

slide-36
SLIDE 36

Elmendorf Lake Park

36

  • All punch list items have been

completed by contractor and the park has been turned over to CoSA Parks and Recreation Dept.

  • Park is currently under a

warranty period until January 2018.

slide-37
SLIDE 37

Trail Projects (Sales Tax Initiative)

Schedule

  • Alazan Creek (RESPEC)-Design in

progress and 40% Review & Public Meeting anticipated in November 2017.

  • Martinez/Zarzamora Creek (Pape-

Dawson)-Design in progress and 40% Review & Public Meeting anticipated in November 2017.

  • Anticipate design & permitting

complete by December 2018.

  • Anticipate construction start in

January 2019 & complete in December 2019.

Completed Trails or In Construction Other Proposed Trails

slide-38
SLIDE 38

Alamo Area MPO Grant

  • Alazan Creek was selected and

recommended for funding.

  • Recommended award was for

$2,500,000 for Alazan Creek.

  • Will award at June 26, 2017

meeting.

  • Additional funds will be utilized

for amenities and beautification along the proposed trail.

Alazan Creek Linear Hike and Bike Trail Completed Trails or In Construction Other Proposed Trails