JUNE 20, 2017 1 DE DESIGN GN & C CON ONST STRU RUCT - PowerPoint PPT Presentation

JUNE 20, 2017 1 DE DESIGN GN & C CON ONST STRU RUCT CTION ION 2 PROJE OJECT CT DE DEVEL VELOPMENT OPMENT Ph Phase e 1, Segment ent 1- (Tunnel el Inle let to Houston Stree eet) t) 90% design plan submittal in February


  1. JUNE 20, 2017 1

  2. DE DESIGN GN & C CON ONST STRU RUCT CTION ION 2

  3. PROJE OJECT CT DE DEVEL VELOPMENT OPMENT Ph Phase e 1, Segment ent 1- (Tunnel el Inle let to Houston Stree eet) t) • 90% design plan submittal in February 2017 • Progress of construction in Phase 1, Segment 1 on schedule for completion on May 5, 2018 3

  4. PROJE OJECT CT DE DEVEL VELOPMENT OPMENT Ph Phase e 1, Segment ent 2- (Houston on Stree eet t to Cesar r Chavez ez Blvd) lvd) • 90% design plan submittal • Dependent upon final approval of art elements by Commissioners Court • Additional art elements require revisions to the design that will impact schedule for submittal • SDJV will submit an initial cost estimate for Phase 1, Segment 2 in August and a full GMP eight weeks after 90% design submittal 4

  5. DE DESIGN SIGN DE DEVEL VELOPMENT OPMENT Ph Phase e 2- (G (Guadalupe alupe Street eet to South uth Ala lamo o Street) eet) • Design for Phase 2 will resume upon completion of design for Phase 1 5

  6. CONST NSTRUCTION RUCTION ACT CTIVITIES VITIES 6

  7. CONST NSTRUCTION RUCTION ACT CTIVITIES VITIES 7

  8. CONST NSTRUCTION RUCTION ACT CTIVITIES VITIES 8

  9. CONST NSTRUCTION RUCTION ACT CTIVITIES VITIES 9

  10. CONSTRUCTION ACTIVITIES Construction tours held for public, stakeholders, students, committee members, elected officials 10

  11. AR ART P T PROG OGRA RAM 11

  12. West Bank East Bank between between Travis Bridges: Santa Travis Street and Street and Rosa, Martin, Travis Houston Street Houston Street Tricentennial Plaza Tile Patterns and West Bank West Bank Word Art: multiple between Martin between Santa locations Street and Rosa Street and Travis Street Martin Street Permanent rmanent Artwork ork Over Overview view

  13. Deck Overlook Martin Street Crosswalk Temp mporar orary y Artwor twork k Over Overview view

  14. JO JORGE GE RODR DRIGUEZ IGUEZ-GERAD GERADA Americ ican an artis ist t based d in Barcelona, ona, Spain in Tricentennial Plaza

  15. Co Concept ncept Stain ainles less s ste teel l and alumin inum “ Plethora refers to the sustenance that San Pedro Creek represents to the San Antonio community. The title of the sculpture, phonetically understood in both Spanish and English, alludes to the great abundance of water and how it irrigates the social fabric that feeds, grows and recognizes itself through a collective outlook, just like the primordial path of the water.”

  16. Co Concept ncept Stain ainles less s ste teel l and alumin inum

  17. DI DIANA ANA KERSEY RSEY San Anto tonio, o, TX Bridges: Santa Rosa, Martin, Travis

  18. Co Concept ncept Ceram amic inserts ts at street t leve vel

  19. MIC ICHAEL HAEL MEN ENCHA CHACA CA JO JOHN HN PHILLIP HILLIP SA SANT NTOS OS San Antonio nio, TX Tile Patterns and Word Art: multiple locations

  20. ADR DRIANA IANA GARCIA CIA San Anto tonio, o, TX West Bank between Santa Rosa Street and Martin Street

  21. Th Theme me: : From m All Road ads, s, We Are One

  22. Co Concept ncept Painted d mural l conve verted d to to ceramic ic tile “The composition tells the story of how the springs brought forth growth in San Antonio. The left is to represent the west, the right is to represent the east .”

  23. KATIE TIE PELL ELL San Anto tonio, o, TX West Bank between Martin Street and Travis Street

  24. Th Theme: eme: Los ost t Wildli ldlife fe

  25. Co Concept ncept Painted d mural l conve verted d to to ceramic ic tile People rendered for scale

  26. ALEX X RUB UBIO IO San n Antonio, io, TX East Bank between Travis Street and Houston Street

  27. Th Theme: eme: Water er Fl Flow ow

  28. Co Concept ncept Painted d mural l conve verted d to to ceramic ic tile “The curvilinear line quality will depict flowing water in variations of blue tones with an accent of aqua blue and white.”

  29. JO JOE LOPEZ PEZ San n Antonio, io, TX West Bank between Travis Street and Houston Street

  30. Th Them eme: e: Alam ameda eda Th Thea eater er Com ommu munity nity

  31. Co Concept ncept Painted d mural l conve verted d to to ceramic ic tile “My work captures the vibrant community that once enlivened the Alameda Theater. The work depicts the ‘El Carazon ,’ the heart of downtown San Antonio. The Alameda was an escape from the harsh reality of life.”

  32. PR PRE-QU QUALIF ALIFIED ED LIST T OF ARTI TISTS TS • Deadline: June 30, 2017 • Applications via www.PublicArtist.org • Artwork Opportunities (permanent and temporary): • Large-scale murals • Light or sound based artwork • Integrated or functional artwork on bridges and pathways • Large and small-scale sculpture in landscape areas • Building facades adjacent to the creek • Interactive or performance-based artwork • Digital projections at bridge underpasses • Serving on a design team for future phases of the project

  33. ARTS TS & CUL CULTURE TURE ALLI LLIANCE ANCE The San Pedro Creek Arts & Alliance is a collaboration of local arts organizations and artists who are interested in the development of cultural opportunities along the creek

  34. QU QUES ESTI TIONS? ONS?

  35. Westside Creeks Linear Creekway Trails Project and Elmendorf Lake Park Dustin Moore June 20, 2017

  36. Elmendorf Lake Park • All punch list items have been completed by contractor and the park has been turned over to CoSA Parks and Recreation Dept. • Park is currently under a warranty period until January 2018. 36

  37. Trail Projects (Sales Tax Initiative) Schedule • Alazan Creek (RESPEC)-Design in progress and 40% Review & Public Meeting anticipated in November 2017. • Martinez/Zarzamora Creek (Pape- Dawson)-Design in progress and 40% Review & Public Meeting anticipated in November 2017. • Anticipate design & permitting complete by December 2018. • Anticipate construction start in January 2019 & complete in December 2019. Completed Trails or In Construction Other Proposed Trails

  38. Alamo Area MPO Grant • Alazan Creek was selected and recommended for funding. • Recommended award was for $2,500,000 for Alazan Creek. • Will award at June 26, 2017 meeting. • Additional funds will be utilized for amenities and beautification along the proposed trail. Alazan Creek Linear Hike and Bike Trail Completed Trails or In Construction Other Proposed Trails

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.