July 2009 Update This presentation (Presentation) has been prepared - - PowerPoint PPT Presentation

july 2009 update this presentation presentation has been
SMART_READER_LITE
LIVE PREVIEW

July 2009 Update This presentation (Presentation) has been prepared - - PowerPoint PPT Presentation

July 2009 Update This presentation (Presentation) has been prepared by Finders Resources Limited (Finders) based on information available to it and from third party sources. By retaining this Presentation, you (the Recipient) acknowledge and


slide-1
SLIDE 1

July 2009 Update

slide-2
SLIDE 2

This presentation (Presentation) has been prepared by Finders Resources Limited (Finders) based on information available to it and from third party sources. By retaining this Presentation, you (the Recipient) acknowledge and represent to Finders that you have read, understood and accepted the terms of this Important Notice. If you do not accept these terms, you should immediately destroy or delete this Presentation. This Presentation does not purport to contain all the information that a prospective investor may require in connection with any potential investment in Finders. You should not treat the contents of this Presentation, or any information provided in connection with it, as financial advice, financial product advice or advice relating to legal, taxation or investment matters. No representation or warranty is made by Finders or any of its advisers, agents or employees as to the accuracy, completeness or reasonableness of the information contained in this Presentation or provided in connection with it. No information contained in this Presentation or any other written or oral communication in connection with it is, or shall be relied upon as, a promise or representation and no representation or warranty is made as to the accuracy or attainability of any estimates, forecasts or projections set out in this Presentation. No liability will attach to Finders with respect to any such information, estimates, forecasts or projections. Finders does not accept responsibility or liability for any loss or damage suffered or incurred by you or any other person or entity however caused (including, without limitation, negligence) relating in any way to this Presentation including, without limitation, the information contained in or provided in connection with it, any errors or omissions from it however caused (including without limitation, where caused by third parties), lack of accuracy, completeness, currency or reliability, or you or any other person or entity placing any reliance on this Presentation, its accuracy, completeness, currency or reliability. Finders does not accept any responsibility to inform you of any matter arising or coming to Finders' notice after the date of this Presentation which may affect any matter referred to in this Presentation. Any liability of Finders, their advisers, agents and employees to you or to any other person or entity arising out of this Presentation including pursuant to the Australian Securities and Investments Commission Act 2001, Corporations Act 2001, Part IVA or V (including sections 51AA, 51AB, 51AC, 52 or 53) of the Trade Practices Act 1974 or any corresponding provision of any state or territory legislation, or similar provision under any applicable law is, to the maximum extent permitted by law, expressly disclaimed and excluded. The distribution of this Presentation may be restricted by law in certain jurisdictions. Recipients and any other persons who come into possession of this Presentation must inform themselves about, and observe any such restrictions. Future matters: This Presentation contains reference to certain intentions, expectations, future plans, strategy and prospects of Finders. Those intentions, expectations, future plans, strategy and prospects may or may not be achieved. They are based on certain assumptions, which may not be met or on which views may differ and may be affected by known and unknown risks. The performance and operations of Finders may be influenced by a number of factors, many of which are

  • utside the control of Finders. No representation or warranty, express or implied, is made by Finders, or any of its directors, officers, employees, advisers or

agents that any intentions, expectations or plans will be achieved either totally or partially or that any particular rate of return will be achieved Given the risks and uncertainties that may cause Finders' actual future results, performance or achievements to be materially different from those expected, planned or intended, Recipients should not place undue reliance on these intentions, expectations, future plans, strategy and prospects. Finders does not warrant or represent that the actual results, performance or achievements will be as expected, planned or intended.

slide-3
SLIDE 3

STATEMENTS

  • The info

e information rmation in this p in this pres esentatio entation that re that relates mineral resource estima s mineral resource estimation is based on work tion is based on work complet completed by Dr Philli d by Dr Phillip Hellman w p Hellman who i

  • is a f

a full ll time employee of Hellman a time employee of Hellman and Schofield Pty Ltd d Schofield Pty Ltd and a m and a member of the Australasia mber of the Australasian Insti Institute of Mi ute of Mini ning a and M d Metallurg

  • tallurgy. Dr Hellman ha

. Dr Hellman has s sufficient cient experience which is relevant experience which is relevant to the style of mi to the style of mineralisat neralisation

  • n and type of de

and type of deposit posit under under consideration and to the activity consideration and to the activity which he is undertaking to qu which he is undertaking to qualify as a Competent Person as alify as a Competent Person as defined in the 2004 Edition of the ‘Austra defined in the 2004 Edition of the ‘Australasia asian Code for Repor n Code for Reporting of E g of Exploration Result ploration Results, s, Mineral Resources and Ore Reserves’ Mineral Resources and Ore Reserves’ and as a Qu nd as a Qualified Person as defined in the AIM Ru alified Person as defined in the AIM Rules. les. Dr Hellman consents to the incl Dr Hellman consents to the inclusi usion i

  • n in the report

the report of the mat

  • f the matters based on h

ers based on his i s inform formation i ation in the form and context in which it the form and context in which it appears. Estimates for Kali

  • appears. Estimates for Kali Kuni

Kuning ng are based on a dat are based on a data set set from which some diamond drill ho from which some diamond drill holes have been les have been excluded due to poor excluded due to poor recovery of copper recovery of copper mi mineralisat neralisation as evidenced by nei

  • n as evidenced by neighbouri

hbouring RC holes. ng RC holes.

  • Geological i

Geological inform formation i ation in t this a announcement a nouncement and comments relatin d comments relating to to exp explor

  • ration potentia

ation potential l and the project in general is ba and the project in general is based on i sed on information compiled by formation compiled by Dr Russell Fountai Dr Russell Fountain, who also , who also accepts responsibility for the data accepts responsibility for the data on wh

  • n which the resource i

ich the resource is b

  • based. Dr Fountain i
  • sed. Dr Fountain is a Director of

a Director of Finders and a Fello Finders and a Fellow of th w of the Australasian Ins e Australasian Institute of Geoscien itute of Geoscientists. Dr Fountain has sufficient

  • tists. Dr Fountain has sufficient

experience that is relevant to the styles of experience that is relevant to the styles of mi mineralisat neralisation and types of deposit

  • n and types of deposits under

under consideration and to the activity that he is consideration and to the activity that he is undertaki undertaking to qualify a g to qualify as Com Competent Person as etent Person as defi defined i ned in the JORC Code. He consents to the the JORC Code. He consents to the inclusion in this announcement of the matters inclusion in this announcement of the matters based on his information in the form based on his information in the form and context in which they appear. and context in which they appear.

slide-4
SLIDE 4

Wetar Copper Project

Wetar Copper Project (94% and earning)

(94% and earning)

8.8 Mt @ 2.4% Cu, open pit heap leach Demonstration Phase Operating successfully since Feb 2009 Feasibility Study due end August 2009 Brownfield’s expansion to 20-25,000t cathode per year

from 2010

Ojolali Gold-Silver Project (72% with option)

Ojolali Gold-Silver Project (72% with option)

1m Oz Au eq. indicated/inferred resources, growth upside

slide-5
SLIDE 5

Capital Structure Capital Structure Ordinary shares (ASX + AIM) 115.5M Current Price (29July 2009) A$0.345 Market Capitalisation A$40M Options (Unlisted) 4,875,000 Convertible Notes (conversion 2012, 12%, $0.375 par value) US$1.5M Meridian Loan US$5.1M Cash (at 30 June 2009) *includes Forward Sales A$1.5M 12 month share price range (Low/High) $0.21/$0.94 Ow Owners nership ip Percentage (%) Owners Percentage (%) Ownership ip ACORN CAPITAL LTD 7.8 RESOURCE CAPITAL FUND IV L P 7.7 LUJETA PTY LTD 7.4 EXSOLUTIONS PTY LTD 6.4 DR CHRISTOPHER BEN FARMER 5.2 MR IAN DAVID NEUSS 4.9

slide-6
SLIDE 6

Rus Russell Fountain ell Fountain Non-E Non-Executive Cha ecutive Chairman rman Dr Fountain has 36 years of successful international experience in all aspects of mineral exploration, project feasibility and development of mining projects. Previous senior positions include President, Phelps Dodge Exploration Corporation; Exploration Manager, Nord Pacific Ltd and Chief Geologist, CSR Minerals. Chris F ris Farmer rmer Mana naging Director ging Director Dr Farmer has 18 years of international experience in all aspects of exploration, with an emphasis on international joint ventures and business development. Previous experience as Vice-President Australasia and Chief Geologist, Phelps Dodge Exploration Corporation, positions with Highlands Gold and Billiton . Dr Farmer worked at the Wetar gold mine in Indonesia and currently lives in Jakarta. Robert Thompson Robert Thompson Exec Executive Director, Development utive Director, Development Rob Thomson has 30+ years of Australian and international mining experience. Rob’s career achievements include development of 7 greenfield projects including Project Director/GM at Chatree (Kingsgate) and Sepon (Oxiana) and CEO roles at Climax and Asian Mineral Resources. He was also Project Manager at Girilambone, Australia’s first copper sulphide leach operation. Mi Michael S chael Stirz irzaker ker Finan Finance Dire e Director ctor Mike is a qualified Chartered Accountant and has worked for KPMG, Wardley James and Kleinwort Benson

  • Ltd. Mike then joined RFC and co-led the management buyout in 2001. He has experience in a broad range of

mining corporate finance and investment activity, including mergers and acquisitions, divestments and capital

  • raisings. In 2007, he joined Tennant Metals.

Grant Harding Grant Harding Opera Operations M ns Mana nager Mr Harding is a qualified extractive metallurgist with over 25 years experience in the mining industry. He has extensive operational, engineering and project management experience in Australia and in Indonesia. Grant was involved in the successful commissioning of Ivanhoe Copper’s Monywa Copper Heap Leach Project in Myanmar in 1998 and more recently as project manager at Avocet’s Bakan heap leach project in Indonesia

slide-7
SLIDE 7

Stephen de Belle ephen de Belle Non-E Non-Executive Di ecutive Director rector Mr de Belle is director of Mantle Mining and Granite Power. Previous roles include: Managing Director, Midwest; Chairman, Australian Superannuation Nominees Ltd, Head of Resources Finance, ABN AMRO Australia; Director, Structured Finance, Barclays Bank . Stephen has been closely involved with the start-up and operation

  • f iron ore, coal, base metals, gold and petroleum projects and companies, particularly the development and

financing of projects in the resources and infrastructure sectors both in Australia and overseas Quinn Rou nn Roussel Non-E Non-Executive Director ecutive Director

  • Mr. Roussel is a Principal with Resource Capital Funds (RCF). Prior to joining RCF in 2006, he worked in the

capacity of corporate development for Asian American Coal, Inc (AACI), one of RCF’s portfolio companies in

  • China. He holds MBA degrees from the University of South Carolina and Wirtschafts Universitat-Wien as well as

a Bachelor of Science degree in Mining Engineering from the Colorado School of Mines Steve Lonerga eve Lonergan Non-Executive Director Non-Executive Director Mr Lonergan specialises in corporate and commercial law as a private practitioner. He is currently General Counsel and Company Secretary of CBH Resources Ltd and Director and Company Secretary of Paradigm Gold Ltd and has held similar positions with Savage Resources and Pancontinental Mining. He has been involved in acquisitions and exploration arrangements in Canada, USA, Peru, Australia, South Asia and Africa Gerry Mba Gerry Mbatemooy emooy Director Banda Minerals, P Director Banda Minerals, PT Batu Batutua tua Temba embaga ga Ra Raya ,PT Batu ya ,PT Batutua Kharism harisma Perm ermai Mr Mbatemooy has over 30 years experience in the Indonesian mining sector and holds a Bachelor of Law

  • qualification. Notably, he was responsible for the permitting process for two new gold mines in Indonesia at

Lebong Tandai and Wetar, both in the capacity of Director of the Billiton owned operating company. Mr Mbatemooy is currently a Member of the Indonesian Mining Professionals Association (PERHAPI) and a former Vice Chairman of the General Mining Department of the Indonesian Chamber of Commerce (KADIN).

slide-8
SLIDE 8

Located in Maluku Barat Daya, Indonesia

Located in Maluku Barat Daya, Indonesia

MALUKU JAKARTA

W ETAR Cu Feasibility Study

8.8 Mt @ 2.4% Cu at 0.5% cut off

slide-9
SLIDE 9
slide-10
SLIDE 10

Same location as former Billiton gold mine

Same location as former Billiton gold mine

CoW terminated October 2004

2005-2007

2005-2007

Cooperation Agreement between BKP & BTR Drilling, Process test work Environmental baseline

2008-present

2008-present

Feasibility Study Demonstration Plant (5tpd) Brownfields expansion in 2010

slide-11
SLIDE 11
slide-12
SLIDE 12

Independent JORC

Independent JORC (Hellman & Schofield)

Potential for 10 year mine life

Potential for 10 year mine life

0.5% Cu cut‐off grade Category Tonnes (M) Cu%

  • Cont. Cu (KT)

Kali Kuning Measured 5.2 2.6 133 Indicated 0.9 2.5 22 Inferred 0.1 1.8 2 Total 6.1 2.5 156 Lerokis Measured 2.1 2.4 51 Indicated 0.5 2.1 10 Inferred 0.1 1.4 2 Total 2.7 2.3 62 Overall 8.8 2.4 218

NOTE: Resources on a 100% project basis, Finders has currently earned ~94% and continues to earn based on project expenditure All estimates are “forward looking statements” as defined in the Disclaimer

slide-13
SLIDE 13

Heap Leach

Heap Leach

Solvent Extraction,

Solvent Extraction, Electrowinning Electrowinning

Distinctive deposit

Distinctive deposit

High grade

copper

Pyrite Exothermic

slide-14
SLIDE 14
slide-15
SLIDE 15

Kali Kuning

Kali Kuning

Chalocite dominated Enargite, Chalcopyrite

Lerokis

Lerokis

Covellite Chalcopyrite

slide-16
SLIDE 16

To accurately measure copper recovery rates

To accurately measure copper recovery rates

To define opt

To define optimum operat mum operating cond ing condit itions ions

To de-risk the project for bank finance

To de-risk the project for bank finance

Timelines

Timelines

Permitting: Jan 2008 Design: Jan –July 2008 Construction: August 2008 – Feb 2009

slide-17
SLIDE 17

DEMONSTRATION PLANT LAYOUT DEMONSTRATION PLANT LAYOUT

slide-18
SLIDE 18
slide-19
SLIDE 19

Tonnes Stacked Cu % Contained Copper (tonnes) Leached Copper (tonnes) Recovery HEAP 1 20,037 2.8% 561 167 30% HEAP 2 23,380 3.6% 842 267 32% HEAP 3 19,129 4.9% 939 241 26%

80% 50% 20% 120 240 480 360 days Copper Recovery

slide-20
SLIDE 20
slide-21
SLIDE 21
slide-22
SLIDE 22

FIVE 9 FIVE 9’ ’S COPPER S COPPER

slide-23
SLIDE 23

Meron ~ 1mt @ 2.3% Cu (non JORC) Ilwaki 8 drill holes in gold cap only Batu Duri 9 drill holes, incl 10m @ 4.5% Cu Pantai Merah Identified Au‐barite sand One hole in copper

slide-24
SLIDE 24

Local employment priority

~125 people (almost 100% of workable age engaged)

Yayasan (social charity) for each village Initial focus: new supply businesses, sustainable

projects, health, skills training

slide-25
SLIDE 25

Lead Engineers : Ausenco

Lead Engineers : Ausenco

Support from SRK, AMDAD, H&S, AECOM Metallurgical consultants:

Randy Scheffel, Graeme Miller

Final review end August 2009

Final review end August 2009

Key aspects include:

Key aspects include:

Expansion of existing demo plant (~10tpd cathode) Brownfields expansion to +20,000 tpa cathode with minor

upgrade of Whim Creek plant

slide-26
SLIDE 26

Current capacity is ~18,500 tpa cathode.

slide-27
SLIDE 27

Final Pit HLP Stage 1 HLP Stage 2 + 3 Waste Dump Demo Area SX-EW Plant Topsoil Neutralisation Plant Stormwater Pond

slide-28
SLIDE 28

Complete Feasibility Study : August 2009 Full scale production : 2010

Subject to Permitting/Financing

Full support of Regent/Governor A very unique project…. Low new environmental impact High grade copper leaching Low capital

slide-29
SLIDE 29

Major new epithermal district (25 sq km) in Sumatra Gold Belt ~1 million Oz Au Equiv. in indicated and inferred resources New targets defined by soil geochemistry/geophysics High potential for additional discoveries

Tambang Tambang Way Way Neki Neki Supri Supri Wujun Wujun Batu Batu Kuning Kuning Tambang South Tambang South Lada Lada Chandra Chandra

slide-30
SLIDE 30

2.6MT at 1.3 g/t Au, 8 g/t Ag at a 0.7 g/t Au cutoff , +90% gold recovery Grade upside, tonnage upside : Open to north, south and west

slide-31
SLIDE 31

Bulk oxide potential

Jambi extensions Talang Harno & others Tambang silver

Bonanza Au/Ag

Batu Kuning Way Neki, Supri

Complex Ag-Au-Zn

Tambang

40m Oz Ag, 1-2 % Zn

Tambang Tambang Way Way Neki Neki Talang Talang Harno Harno Jambi Jambi Wujun Wujun Supri Supri Kencur Kencur Lada Lada Batu Batu Kuning Kuning Belida Belida

slide-32
SLIDE 32

Wetar Copper Project

Wetar Copper Project

High Grade near surface copper 2010 full scale production

Significantly de-risked

Current demonstration plant

proof of concept

Project delivery team in place Brownfields expansion using the

Whim Creek plant

Ojolali Gold-Silver

Ojolali Gold-Silver

25koz/yr with growth potential