JULY 2007 FORWARD LOOKI NG STATEMENTS This presentation contains - - PDF document

july 2007 forward looki ng statements
SMART_READER_LITE
LIVE PREVIEW

JULY 2007 FORWARD LOOKI NG STATEMENTS This presentation contains - - PDF document

JULY 2007 FORWARD LOOKI NG STATEMENTS This presentation contains forecasts and forward looking statements which are made in good faith and are believed to have reasonable basis. However, such forward looking statements are subject to risks,


slide-1
SLIDE 1

JULY 2007

slide-2
SLIDE 2

FORWARD LOOKI NG STATEMENTS

This presentation contains forecasts and forward looking statements which are made in good faith and are believed to have reasonable basis. However, such forward looking statements are subject to risks, uncertainties and other factors which could cause the actual results to differ materially from the future results expressed, projected or implied by forward looking statements.

slide-3
SLIDE 3

HI STORY

1984 beginning Aeromagnetic database second only to Rio Tinto Discoveries Magnetic Minerals listed 2000 Image listed July 2002 Meteoric listed July 2004 Magnetic listed April 2007

slide-4
SLIDE 4

DI RECTORS

  • George Sakalidis:

Managing Director, geophysicist, 29 yrs exp.

  • Roger Thomson:

Technical Director, geologist, 39 yrs exp.

  • Peter Thomas:

Chairman, lawyer, 25 yrs exp.

slide-5
SLIDE 5

COMPANY STRUCTURE AND ASSETS

IMAGE FPO1 SHARES 6,000,000 Directors: Peter Thomas - Chairman Bonus FPO Shares 1:9 to Image s/h 8,200,000 George Sakalidis – Managing Director IPO FPO Shares (20c per share) 25,000,000 Roger Thomson – Exploration Director Total FPO Shares 39,200,000 ACN 121 370 232 Partly Paid Contributing Shares (20c unpaid)2 IPO Raising: $5 million Bonus 1:6 to Image s/h 12,300,000

1 fully paid ordinary 2 Application for quotation of fully paid converting and partly paid

contributing shares will not to be made within the first 24 mon after the Company is admitted to ASX. Directors & Consultants 6,500,000 Options to acquire FPO shares at 25 cents each on or before 30 months from date of ASX listing – Stockbrokers and supporters. 5,500,000

slide-6
SLIDE 6

HI GHLI GHTS

  • Projects totalling 6,670sq km in the Yilgarn

Craton.

  • Some 330km of interpreted, under-explored

greenstone belt.

  • Ready to drill EM nickel targets at Binti and

Lake Percy.

  • 14 projects soil sampled .
  • 7 projects being RAB drilled
  • 4 projects with encouraging geochem results
  • Team members with histories of successful

project generation and discoveries.

  • Focus on gold, nickel and uranium.
slide-7
SLIDE 7

FORRESTANI A - RAVENSTHORPE

slide-8
SLIDE 8

FORRESTANI A – RAVENSTHORPE AEROMAGNETI CS

slide-9
SLIDE 9

NEPEAN – BOORABBI N AEROMAGNETI CS

slide-10
SLIDE 10

EMI LY ANN – FLYI NG FOX AEROMAGNETI CS

slide-11
SLIDE 11

RAVENSTHORPE –NEWDEGATE AEROMAGNETI CS

slide-12
SLIDE 12

MAGNETI C RESOURCES

Binti Bore Aeromagnetics

slide-13
SLIDE 13

MAGNETI C RESOURCES Binti Bore Summary

slide-14
SLIDE 14

MAGNETI C RESOURCES

Binti Bore - BBC1 EM Modelling

slide-15
SLIDE 15

MAGNETI C RESOURCES

Binti Bore – BBC2 EM Modelling

slide-16
SLIDE 16

MAGNETI C RESOURCES

Binti Bore – BBC3 EM Modelling

slide-17
SLIDE 17

MAGNETI C RESOURCES

BBC3

slide-18
SLIDE 18

MAGNETI C RESOURCES

BI NTI BORE

slide-19
SLIDE 19

MAGNETI C RESOURCES

BI NTI BORE

slide-20
SLIDE 20

2m @ 0.6% Ni 2m @ 0.7% Ni (incl. 1m @ 0.9% Ni)

MAGNETI C RESOURCES

LAKE PERCY – MAGNETI CS RAB AND RC DRI LL HOLES

slide-21
SLIDE 21

MAGNETI C RESOURCES

LAKE PERCY AEROMAGNETI CS

slide-22
SLIDE 22

MAGNETI C RESOURCES

LAKE PERCY EM CONDUCTOR

slide-23
SLIDE 23

MAGNETI C RESOURCES

slide-24
SLIDE 24

MAGNETI C RESOURCES

URANI UM PROJECTS

  • 5 Uranium targets selected from new

85,000km airborne survey

  • Strong isolated responses ranging

between 11 ppm to 41 ppm UEq

  • Occur in old drainage channels and salt

lake sediments

  • Similar response to Yeelirrie uranium

(30 – 70 ppm UEq)

  • Radiometric ground traverses and

sampling at Lake Seabrook and Yerritup

slide-25
SLIDE 25

MAGNETI C RESOURCES

URANI UM PROJECTS

slide-26
SLIDE 26

MAGNETI C RESOURCES

URANI UM TARGETS

THREE STAR LAKE LAKE SEABROOK

slide-27
SLIDE 27

MAGNETI C RESOURCES

URANI UM TARGETS

YERRI TUP BOYDELLS 26 MI LE ROCK

slide-28
SLIDE 28

SUMMARY

  • Aggressive start to float with sampling

programmes at 11 projects waiting for Ni and Au assays

  • Deep RC rigs being organised for Binti

and Lake Percy Ni sulphides EM targets

  • 4 projects with encouraging geochem
  • results. Two have old gold workings
  • RAB programme 10000m for 7 projects
  • Tight structure with 33 million shares

trading

  • 1.5M drilling and exploration in first year
slide-29
SLIDE 29

CONTACT DETAI LS

  • Level 2, 35 Outram Street, West Perth

WA 6005

  • PO Box 1388, West Perth WA 6872
  • Ph: 9226 1777
  • Fax: 9485 2840
  • Email: info@magres.com.au
  • Web: www.magres.com.au
  • ASX: MAU
slide-30
SLIDE 30