Joint Classroom Steering Committee Report Mark Oliver Presenting - - PowerPoint PPT Presentation

Joint Classroom Steering Committee Report Mark Oliver Presenting on behalf JCSC committee 04/18/2019 Audio/Visual Systems in General Assignment classrooms Information Technology Services General Items As of September 2018 - 107 total


slide-1
SLIDE 1

Joint Classroom Steering Committee Report

Mark Oliver

Presenting on behalf JCSC committee

04/18/2019 Audio/Visual Systems in General Assignment classrooms

Information Technology Services

slide-2
SLIDE 2
  • As of September 2018 - 107 total

general assignment classrooms (process began in 2010)

  • $300k allocated for AV equipment,

$300k allocated for furniture annually

  • FY18 AV increased to $400k annually

due to new Tech Fee

General Items

slide-3
SLIDE 3

Number of General Assignment Classrooms upgraded annually by JCSC

Year Classrooms Auditorium 2009 1 2010 3 3 2011 1 1 2012 2 2013 7 2 2014 9 2015 12 2016 8 2017 8 3 2018 43 4 Total 92 14

slide-4
SLIDE 4

JCSC Work During Summer 2018

  • 39 classrooms which were originally

installed in 2010 were upgraded

  • All parts purchased with JCSC funds
  • All physical installations performed by

CMA staff, saving URI an estimated $400k

  • All rooms have new document

camera and touch panel

slide-5
SLIDE 5
  • Uclub
  • Moved and re-installed three sets of

AV equipment from Bliss

  • White 205
  • Purchased new equipment (system,

monitors, speakers) using CMA repair funds

JCSC Work During Summer 2018

slide-6
SLIDE 6
  • Washburn 208
  • Purchased touch panel (using CMA

repair funds) and re-programmed entire system

  • Swan Auditorium
  • Project managed installation of new

AV system (by HB Communication)

JCSC Work During Summer 2018

slide-7
SLIDE 7
  • Quinn 104 and Rodman 109
  • New podiums and system upgrades

using CMA Repair funds

  • All installation done by CMA staff
  • College of Engineering
  • Installed audio and video setup for

large area in Schneider

  • Constant consultation regarding AV in

new Engineering Building

JCSC Work During Summer 2018

slide-8
SLIDE 8
  • Chafee 235 and 244; CBLS 252
  • New podiums and system upgrades

using CMA Repair funds

  • All installation done by CMA staff
  • Weaver Auditorium
  • Project managed installation of new

AV system (by HB Communication)

JCSC Work During Winter 2019

slide-9
SLIDE 9

Information Technology Services

  • Chafee Auditoriums
  • New internal AV equipment
  • New podiums, document cameras,

sound systems, computers in lecterns

  • 271 and 273 using FY19 funds
  • 275 and 277 using FY20 funds

JCSC Plans - Summer 2019

slide-10
SLIDE 10

Information Technology Services

  • 4 classrooms getting new internal AV

equipment

  • 26 classrooms being re-programmed
  • Goal is to have “all” classrooms to

have similar interfaces

  • Survey of instructors – general
  • pinions, room conditions, CMA staff

CMA Plans - Summer 2019

slide-11
SLIDE 11

Information Technology Services

  • Chafee Auditoriums
  • Physical reconstruction of front

walls

  • New laser projectors

JCSC Plans - Summer 2020

slide-12
SLIDE 12

Classroom Media Assistance Statistical Report

Information Technology Services

  • Top Seven Misbehaving Classrooms (9/3/18 to 4/16/19):

Count Room 10 Beaupre 100 10 Washburn 208 9 CBLS 100 9 Chafee 244 9 Chafee 271 8 Washburn 112 8 White 113

slide-13
SLIDE 13

Classroom Media Assistance Statistical Report

Information Technology Services

  • Classroom Equipment Issues (9/3/18 to 4/16/19):

Count Problem Type 80 Projector 80 Cables 68 System 40 Room Computer 28 Document Camera 20 Microphone/Speaker

slide-14
SLIDE 14

Classroom Media Assistance Statistical Report

Information Technology Services

  • September 2016 to mid-March 2017:
  • 336 problem tickets
  • September 2017 to mid-March 2018:
  • 274 problem tickets
  • September 2018 to mid-April 2019:
  • 348 problem tickets