Jinyu (Michelle) Chen Matt Curcuru Susanna Domosi Jennifer Gallino - - PowerPoint PPT Presentation

jinyu michelle chen matt curcuru susanna domosi jennifer
SMART_READER_LITE
LIVE PREVIEW

Jinyu (Michelle) Chen Matt Curcuru Susanna Domosi Jennifer Gallino - - PowerPoint PPT Presentation

Jinyu (Michelle) Chen Matt Curcuru Susanna Domosi Jennifer Gallino Romina Trieshi Collin Wittmann Project Objectives 2 Market Analysis 3 Project Overview


slide-1
SLIDE 1

Jinyu (Michelle) Chen Matt Curcuru Susanna Domosi Jennifer Gallino Romina Trieshi Collin Wittmann

slide-2
SLIDE 2

Project Objectives 2 Market Analysis 3 Project Overview 6 Phases 3 & 4 9 Financial Analysis 20 Traffic Infrastructure 25 Sustainability 27 Historic Preservation 29

1

slide-3
SLIDE 3

Environmental Sustainability Economic Growth Increase Employment Education Flexible Infrastructure Historic Preservation Improve Traffic Flow Weather Resiliency 1 8 7 6 5 4 3 2 2

Project Objectives

Project Objectives

slide-4
SLIDE 4

Market Analysis

Gap between supply and demand for retail in a 20-30 min. radius

Expected number of adults to visit restaurants in a 10 minute radius

Market Analysis

3

75,746

Expected number of adults to exercise in a 10 minute radius

$1.3 BN

Expected amount of money spent on health expenditures for the year in a 10 min. radius

$6.0 BN 233,858

ESRI Report: 10 mins, 20 mins, 30 mins drive ratio

slide-5
SLIDE 5

Market Analysis

Market Analysis

Population: 1,474,897 Expected Growth: 0.2% Household Income: $59,043 Expected Growth: 4.86% Employees: 723,785 Median Age: 36

4

32.95% 29.9% 24.6% 10.1% Hispanic White Black Asian

Data USA Report 2016

Kearny Point

Hudson & Essex County Demographics (2016)

slide-6
SLIDE 6

Comparable Analysis

Overview Property Location Total sf (M) Lot Size (Acres)

Brooklyn Navy Yard Brooklyn,NY 2.0 225 Industry City Brooklyn, NY 2.0 35 Brooklyn Army Terminal Brooklyn, NY 0.5 98 Philadelphia Navy Yard Philadelphia, PA 7.5 1200 Bell Works Holmdel, NJ 2.0 473 Ambler Yards Ambler, PA 0.3 26 Spring House Lower Gwynedd Township, PA 0.6 133

Urban Suburban

5

Market Analysis

slide-7
SLIDE 7

Qualified Opportunity Funds Job and Educational Opportunities Class A and LEED Gold certified Flood Prevention Industrial Architectural Design Integrated Historic Narrative

Project Overview

6 1 6 5 4 3 2

Project Overview

slide-8
SLIDE 8

Project Overview

  • Phase 3: 70% Floor Area Ratio

Building A: Grocery, General Merchandise, Wholesaler Building L: Medical Facilities, Fitness, Pharmacy, Healthfood

  • Phase 4: 25% Floor Area Ratio

Buildings 1-6 Office, Retail, Restaurants, Hotel

3 4

Project Overview

7

slide-9
SLIDE 9

Project Overview

8

Open layout Living walls Loft offices Tenant lounge areas Shared conference space Smart windows Common Spaces High Speed Internet Flex space (versatile space catered towards variety of different tenants) Large glass facade mixed with industrial design for maximum sunlight Access to outdoor roof deck Childcare Service oriented retail: Sweetgreen, Chipotle Vegan and vegetarian food options

Building Amenities

Project Overview

slide-10
SLIDE 10
  • High Demand in health sector
  • High proportion of women in industry

170,000 SF available land | 360,000 SF gross space

Building A: Medical and Fitness Hub 3 Stories | 60,000 SF | Trapezoid Layout Building L: Retail & Wholesalers 2 Stories | 300,000 SF | L-Shaped Structure

Phase 3: Building A and Building L

9 A L

  • Significant demand for retail
  • Job opportunities for underrepresented

population

  • Mixed-use diversifies development risk

Phase 3: Building A and Building L

slide-11
SLIDE 11

Phase 4 - Overview

10

Phase 4

Six Commercial Buildings Office Space

Size Option

Restaurant / Retail

High Demand Turnstyle Underground Marketplace Fast Casual, Casual Dining, Premium Casual

Hotel

Limited Service 250 Keys

slide-12
SLIDE 12

Stacking Plan - Phase 4

11

Phase 4

slide-13
SLIDE 13

12 12

Phase 4

slide-14
SLIDE 14

Phase 4 - Buildings 1 and 2

13

790,000 SF available land | 120,000 SF gross space

Building 2 2 Stories | 60,000 SF | Rooftop Recreation

2

  • Overlook Hackensack River
  • Versatile rooftops

2

Building 1 2 Stories | 60,000 SF | Rooftop Vineyard

1

Phase 4: Building 1 and Building 2

slide-15
SLIDE 15

14

Phase 4

slide-16
SLIDE 16

Phase 4 - Buildings 1 and 2

15

790,000 SF available land | 120,000 SF gross space

Building 2 2 Stories | 60,000 SF | Rooftop Recreation

2

  • Overlook Hackensack River
  • Versatile rooftops

2

Building 1 2 Stories | 60,000 SF | Rooftop Vineyard

1

Phase 4: Building 1 and Building 2

slide-17
SLIDE 17

16

Phase 4

slide-18
SLIDE 18

Phase 4 - Buildings 3 and 4

17

790,000 SF available land | 230,000 SF gross space

Building 3 4 Stories | 115,000 SF | Bee Apiary

3

Building 4 4 Stories | 115,000 SF | Vertical Farming

4

  • High demand for restaurant
  • High demand for retail
  • Brooklyn Grange

Phase 4: Building 3 and Building 4

slide-19
SLIDE 19

18

Phase 4

slide-20
SLIDE 20

Phase 4 - Buildings 5 and 6

19

790,000 SF available land | 250,000 SF gross space

Building 5 5 Stories | 170,000 SF | Hotel

5

Building 6 5 Stories | 80,000 SF | Fitness

6

  • Limited service
  • Number of Keys - 250
  • Multipurpose - bowling, rockwall, pool
  • Restaurant - health food
  • Daycare

Phase 4: Building 5 and Building 6

slide-21
SLIDE 21

Financial Analysis - Revenue Assumption Schedule

Calculation is based on LoopNet (online marketplace for commercial property website) and estimations

20

Financial Analysis

slide-22
SLIDE 22

Financial Analysis - Phase 3 Revenue Schedule

21

Financial Analysis

slide-23
SLIDE 23

Financial Analysis - Phase 4 Revenue Schedule

22

Financial Analysis

slide-24
SLIDE 24

Financial Analysis - Hard Cost Schedule

23

Financial Analysis

slide-25
SLIDE 25

Financial Analysis - Summary

Total Gross Rental Income/Revenue=$24,242,760 Total Hard Cost Schedule = $205,800,000 $205,800,000 $24,242,706

24

= 9 Years

Financial Analysis

slide-26
SLIDE 26

Transportation Infrastructure

25

Transportation Infrastructure

slide-27
SLIDE 27

Public bike rentals Pedestrian walking roads and green enjoyable space Road lights equipped with electric car chargers Electric minitrams or electric minibuses

Green Transportation Infrastructure

26

Transportation Infrastructure

slide-28
SLIDE 28

Green Infrastructure and Sustainability

Air Cleaning Facade SMART Windows Vertical Farming and Bee Apiaries Priority Parking for Hybrid and Electric Vehicles Smart Building Technology Visible Recycling Solar Panels Buildings will be LEED Gold Certified

27

Sustainability

slide-29
SLIDE 29

Water Resilience

Wetlands will absorb and gently release stormwater Wetlands that are low enough to fill with water twice a day during high tides Use bioswales to concentrate or remove debris and pollution out of surface runoff water

Hunter’s Point South Park, Long Island City

Sustainability

28

slide-30
SLIDE 30

Historic Preservation

29

Historic preservation as integrated narrative

2

Historic Preservation

1

Rehabilitation of existing infrastructure

Ship-shaped bronze plaques

  • n the building’s facades

Install “Links” across multiple locations

slide-31
SLIDE 31
slide-32
SLIDE 32
slide-33
SLIDE 33
slide-34
SLIDE 34
slide-35
SLIDE 35
slide-36
SLIDE 36
slide-37
SLIDE 37