Renco Spa
Renco Geneve Renco Angola Renco Tanzania Renco Zanzibar Renco Congo Renco Belgium Renco Colombia Renco Nigeria Renco Lybia Renco Iraq Renco Mozambique Renco Polska Renco Russia Interrenko Okner KAT Renco Sakhalin Renco Armenia Renco Qatar Renco Abu Dhabi Renco KAT Renco AK
Legenda Headquarter Legal Entity Branch
60 Mln €
Europe
60 Mln €
Russia, Armenia & Kazahstan
45 Mln €
Africa
8 Mln €
Middle East & Others
RENCO is certified
- ISO 9001
9001 Certificate
- OHSAS 1
18001 8001 Certificate
- ISO 1
14001 4001 Certificate
- Ach
chil illes es J Join int Qualif ifica icatio ion Syst ystem em for S Supplier iers to the O e Oil il Indu dustry y in in Norway ay an and D Denmar ark
Quality Environment and Safety
Divisions
Renco S.p.A. core activities
- Engineering and construction for Oil & Gas sector
- Engineering and construction for Power Generation sector
- Provision of technical staff.
Renco’s structure is presently subdivided into four main divisions :
Industrial Plants Services Infrastructures Asset Division
.
Client: FLUXYS, Belgium AE: Tractebel Engineering Scope: EPC & Commissioning of
4 compressors, electrical motor driven (6,4 MW) – SIEMENS. Flow per unit : 420.000 Nm³/h
Civil work Piping and valves Instrumentation Fire Fighting Electrical
ZELZATE COMPRESSOR STATION (2006 – 2008) WEELDE COMPRESSOR STATION (2008-2010) BERNEAU COMPRESSION STATION 2009- on going
Client: FLUXYS, Belgium AE: Tractebel Engineering Scope: EPC & Commissioning of
3 Turbo Compressors Taurus 70 (4,4 MW) – SOLAR Flow per unit : 400.000 Nm³/h
Civil work Piping and valves Instrumentation Fire Fighting Electrical
Client: FLUXYS, Belgium AE: Tractebel Engineering Scope: EPC & Commissioning of
RTR/VTN
N.4 compressors, electrical driven (6,3
MW) – General Electric SEGEO
N.2 compressors, electrical driven (4,9
MW) – General Electric
Civil work Piping and valves Instrumentation Fire Fighting Electrical
Compression Station BELGIUM
CROTONE ROSETO COMPRESSOR STATION
Compression Station ITALY
- SCOPE
OF WORK:Engineering and procurement of Solar turbocompressor Taurus 60 ( 6MW), process, skid, fuel gas skid and relevant auxiliaries
- CLIENT: ENI E&P
- YEAR : 2003-2004
- SCOPE
OF WORK: Engineering and procurement of Solar Centaur 40 ( 3,5MW) turbo compressor in a tandem configuration, process skids, fuel gas skid, gas coolers and relevant auxiliaries
- CLIENT: ENI E&P
- YEAR : 2005-2007
TERRANUOVA BRACCIOLINI COMPRESSOR STATION
- SCOPE OF WORK: Engineering, supply and
installation of a turbocompressor unit 12 MW, relevant auxiliaries and unit building
- CLIENT: SNAM RETE GAS
- YEAR : 2003-2005
POGGIO RENATICO COMPRESSOR STATION (on-going project)
Compression Station ITALY
- SCOPE OF WORK: Engineering, supply and
installation
- f
the BOP for n° 2 turbocompressors unit 12 MW (Solar Turbines Mars 100) and unit buildings.
- CLIENT: SNAM RETE GAS
- YEAR : 2005-2006
RUSWILL (Switzerland) COMPRESSOR STATION
SCOPE OF WORK: Engineering Procurement and Construction of auxiliary equipment for nos. 2 gas turbines including insonorization buildings, turbines air inlets, exhaust systems, lube oil coolers. Installation of turbines and auxiliary systems, commissioning and start up. Engineering, supply and installation of instrumentation controlled by DCS. CLIENT: SOLAR TURBINES EUROPE COUNTRY: Switzerland YEAR: 1997-1998
Compression Station EUROPE ONSHORE
SCOPE OF WORK: Engineering, procurement and construction for upgrade gas injection wells at clusters A-B-C, Gas station Cortemaggiore CLIENT: STOGIT S.P.A COUNTRY: Italy YEAR: 2007-2008