Investor Presentation September 2012 Bruce Kay Non-Executive - - PowerPoint PPT Presentation

investor
SMART_READER_LITE
LIVE PREVIEW

Investor Presentation September 2012 Bruce Kay Non-Executive - - PowerPoint PPT Presentation

Investor Presentation September 2012 Bruce Kay Non-Executive Director Steve Boston Non-Executive Chairman Co Comp mpan any y Ob Objecti tive ves Become a cash producing, dividend paying gold producer by 2015 Considerably


slide-1
SLIDE 1

Investor Presentation

September 2012

Bruce Kay

Non-Executive Director

Steve Boston

Non-Executive Chairman

slide-2
SLIDE 2

Slide 2

Co Comp mpan any y Ob Objecti tive ves

 Become a cash producing, dividend paying

gold producer by 2015

 Considerably enhance value by successful

exploration

Early cash flow is the priority

slide-3
SLIDE 3

Slide 3

Cu Curr rrent t Pro rojects ts

Four Eagles Gold Project Minnie Springs

Molybdenum Tungsten Project

Everton

Molybdenum Project

slide-4
SLIDE 4

Slide 4

Mak akin ing g Thin ings gs Ha Happen

 24,000 metres aircore, RC, diamond

drilling in 18 months

 Three high grade prospects defined  Large gold footprint / 5 Lines of Lode  Option on Unity Gold Plant at Bendigo

20 30 40 50 60

Cents Jul 11 Apr 11 Oct 11 Jan 12 Apr 12 Jul 12 Low 22 cents High 56 cents

Catalyst Share Price

slide-5
SLIDE 5

Slide 5

Be Bendig igo/Ba Ball llar arat at Gol

  • ld Zon
  • nes

DPI predicts 32 Mozs 60 Mozs Production

W h i t e l a w F a u l t Avoca Fault B a m b r a F a u l t Mount William F a u l t Governor Fault System

  • N. S. W.

V I C T O R I A Four Eagles Gold Project

Bendigo

NORTH

kilometres 100

Bendigo - Ballarat

Gold Zone

Total Gold Production

38º 36º 143º 145º

Ballarat

Stawell MELBOURNE

Concealed by Murray Basin Sediments

> 10 million ounces > 1 million ounces > 300,000 ounces

  

60 million ounces produced 2 Deposits > 10 million ounces 5 deposits > 1 million ounces

DPI p predicts ts 32 million ounces o

  • f Gold under Cove

ver

(source: e: Victo ctori rian an Departm rtment ent of Primary y Indus ustr tries ies, Gold Underco rcove ver Initiati ative ve)

Historic rical al Gold Product ction

  • n in Be

Bendigo go-Ba Balla llarat rat Re Region

slide-6
SLIDE 6

Slide 6

No Nort rth Be Bendig igo Gol

  • ld Be

Belt lt

 Major gold belt

emerging north of Bendigo

 Totally concealed by

Murray Basin sediments

 Whitelaw Fault

controls gold

 Catalyst has 25km of

strike length

 Option over Unity

Drummond Potential

slide-7
SLIDE 7

Slide 7

What t lies b s beneath th th the wheat t fi fields ds?

0.4m @ 152.0g/t Au (FEDD008) 6.0m @ 82.7g/t Au (FE328) 1.0m @ 18.3g/t Au (FERC002) 3.0m @ 31.3g/t Au (FE415) 1.0m @ 17.5g/t Au (FEDD001) 3.0m @ 19.5g/t Au (FE592) 3.0m @ 16.8g/t Au (FE608)

5mm

slide-8
SLIDE 8

Slide 8

Fou

  • ur Ea

Eagles – Ta Tandar arra Go Gold Tr Trend

 23 km prospective

strike length

 Alluvial cover

20m – 120m deep

 Large gold foot print

already defined

 Same structural position

as Tandarra

EL4897

Navarre Minerals

EL4525

Catalyst Metals

Whitelaw Fault Fault T a n d a r r a

Mitiamo

kilometres 5

NO R T H

EL5295

Railway

5,980,000mN 5,970,000mN 6,000,000mN 5,990,000mN 250,000mE 240,000mE

Drillholes 0.1 to 0.2 g/t Au 0.2 to 0.5 g/t Au 0.5 to 1.0 g/t Au 1.0 to 5.0 g/t Au > 5.0 g/t Au Gold Zone Arsenic Zone

East Tandarra Trend Tandarra Trend

Note: No Arsenic data available for Navarre

slide-9
SLIDE 9

Slide 9

Fo Four r Eag agle les s Gol

  • ld Zon
  • nes

Bendigo Pyramid Road

kilometre 1 NO R T H

Bendigo Pyramid Road

Whitelaw Fault Projected Tandarra Fault

242,000mE 244,000mE 246,000mE 5,992,000mN 5,990,000mN 5,988,000mN

EAGLE 1 TARGET EAGLE 2 EAGLE 4 ZONE EAGLE 3

343 380 328 D001

316 (3.85km north)

469 509 584 623 619 D008 D007

E 5 AGLE TARGET

Drillhole Intersections (>0.7g/t Au)

FEDD001 3.7m @ 4.7g/t Au from 170m inc. 0.8m @ 17.5g/t Au from 173m FEDD005 1m @ 1.2g/t Au from 99m FEDD007 0.4m @ 16.2g/t Au from 168m and 0.75m @ 15.3g/t Au from 170m FEDD008 0.4m @ 152g/t Au from 150m FERC002 2m @ 1.8g/t Au from 67m and 1m @ 18.3g/t Au from 127m FERC003 2m @ 6.2g/t Au from 49m FE328 6m @ 82.7g/t Au from 123m FE343 3m @ 3.34g/t Au from 111m FE380 3m @ 9.71g/t Au from 120m FE399 6.0m @ 1.0g/t Au from 66m FE402 3.0m @ 0.9g/t Au from 90m FE415 6.0m @ 2.4g/t Au from 45m and 3.0m @ 31.3g/t Au from 57m FE469 3.0m @ 1.16g/t Au from 36m FE471 3.0m @ 5.18g/t Au from 75m and 3.0m @ 1.19g/t Au from 81m FE472 3.0m @ 1.30g/t Au from 45m and 3.0m @ 1.27g/t Au from 63m FE492 3.0m @ 1.1g/t Au from 75m FE509 3.0m @ 0.7g/t Au from 84m FE572A 3.0m @ 2.04g/t Au from 51m FE575 3.0m @ 4.9g/t Au from 66m FE578 3.0m @ 1.23g/t Au from 60m FE579 9.0m @ 2.34g/t Au from 48m and 3.0m @ 1.58g/t Au from 78m FE584 3.0m @ 0.88g/t Au from 117m FE591 3.0m @ 11.1g/t Au from 87m FE592 3.0m @ 19.45g/t Au from 90m FE595 3.0m @ 1.23g/t Au from 126m FE608 3.0m @ 16.8g/t Au from 108m FE619 3.0m @ 0.8g/t Au from 45m FE623 3.0m @ 0.95g/t Au from 53m Drillholes 0.1 to 0.2 g/t Au 0.2 to 0.5 g/t Au 0.5 to 1.0 g/t Au 1.0 to 5.0 g/t Au > 5.0 g/t Au Drillhole grades Au Zone As Zone

Boyd’s Dam

See enlargement plan

Hayanmi

See enlargement plan

Discovery

See Cross Section

471 402 399 D005 595 608 492 592 591 R002 472 415 572A 579 578 R003 575

slide-10
SLIDE 10

Slide 10

Ha Haya yanmi mi Pro rosp spect

Cuneens Road

metres 200 NO R T H

N

  • r

t h B

  • u

n d a r y R

  • a

d

244,500mE 245,000mE 5,990,000mN 5,989,500mN

Hayanmi Prospect

471 399 592 593 591 594 595 596 599 602 604 492 608 607 606 402 D005

Drillhole Intersections (>0.5g/t Au)

FEDD005 1.0m @ 1.2g/t Au from 99m FE399 6.0m @ 1.0g/t Au from 66m FE402 3.0m @ 0.9g/t Au from 90m FE471 3.0m @ 5.2g/t Au from 75m and 3.0m @ 1.19g/t Au from 81m FE492 3.0m @ 1.1g/t Au from 75m and 3.0m @ 0.6g/t Au from 78m FE591 3.0m @ 11.1g/t Au from 87m and 3.0m @ 1.06g/t Au from 93m FE592 3.0m @ 19.45g/t Au from 90m and 3.0m @ 1.26g/t Au from 93m and 3.0m @ 0.86g/t Au from 126m FE595 3.0m @ 1.23g/t Au from 126m FE596 6.0m @ 0.6g/t Au from 72m FE599 3.0m @ 0.64g/t Au from 87m FE606 3.0m @ 0.47g/t Au from 102m FE608 3.0m @ 16.8g/t Au from 108m

Drillholes 0.1 to 0.2 g/t Au 0.2 to 0.5 g/t Au 0.5 to 1.0 g/t Au 1.0 to 5.0 g/t Au > 5.0 g/t Au Drillhole grades Au Zone As Zone

EAGLE 3 ZONE

slide-11
SLIDE 11

Slide 11

Boyd’s Dam Prospect

Cuneens Road

metres 200 NO R T H

B e n d i g

  • P

y r a m i d R

  • a

d

245,000mE 245,500mE 5,990,000mN 5,989,500mN 5,989,000mN

EAGLE 4 ZONE

Boyd’s Dam Prospect

535 549A 545 540 541 R002 472 415 537 533 532 571 572A 575 576 579 578 580 416 R003 D003

Drillhole Intersections (>0.5g/t Au)

Drillholes 0.1 to 0.2 g/t Au 0.2 to 0.5 g/t Au 0.5 to 1.0 g/t Au 1.0 to 5.0 g/t Au > 5.0 g/t Au Drillhole grades Au Zone As Zone

FEDD003 3m @ 0.92g/t Au from 56m FERC002 2m @ 1.8g/t Au from 67m and 1m @ 18.3g/t Au from 127m FERC003 2m @ 6.2g/t Au from 49m FE415 6.0m @ 2.4g/t Au from 45m and 3.0m @ 31.3g/t Au from 57m FE472 3.0m @ 1.30g/t Au from 45m and 3.0m @ 1.03g/t Au from 51m and 3.0m @ 1.27g/t Au from 63m FE532 3.0m @ 0.65g/t Au from 69m and 3.0m @ 0.73g/t Au from 96m FE535 3.0m @ 0.71g/t Au from 63m FE541 3.0m @ 0.93g/t Au from 54m FE572A 9.0m @ 0.85g/t Au from 48m inc 3.0m @ 2.04g/t Au from 51m FE575 3.0m @ 4.9g/t Au from 66m FE576 3.0m @ 0.58g/t Au from 78m FE578 9.0m @ 0.54g/t Au from 60m inc 3.0m @ 1.23g/t Au from 60m FE579 36.0m @ 0.92g/t Au from 48m inc 9.0m @ 2.34g/t Au from 48m and 3.0m @ 1.58g/t Au from 78m

slide-12
SLIDE 12

Slide 12

Fo Four r Eag agle les s Dri rill ll Cr Cros

  • ss

s Se Secti tion

  • n

Eagle 3 Trend Eagle 2 Trend

356m

D007 D008 D002 D001

FE300 FE299 0.4m @ 16.2g/t Au 0.75m@15.3g/tAu FE328 FE298 FE329 FE297 FE330 FE296 FE331 6m @ 82.7g/t Au 3m @ 0.51g/t Au 3m @ 0.59g/t Au 0.7m @ 4.83g/t Au 0.8m @ 17.5g/t Au 0.4m @ 152g/t Au

Four Eagles Cross Section

5988925mN

Clay - Shepparton Fm. Sand Carbonaceous Clay Saprolite Zone Potential Gold Zone Shale Sandstone Quartz Veins / Shearing Basement Castlemaine Gp.

244000mE 244250mE 244500mE

  • 250m

0m

F O L D A X I S

215.5m EOH 257.1m EOH

TANDARRA F.

Metres

100

slide-13
SLIDE 13

Slide 13

Be Bendig igo: : his

istoric ic go gold ld p produ ductio ion

Historical gold production indicates:

Estimated 50,000 ounces per vertical metre

Every 100 metres contains 5 million ounces

200 400 600 800 1,000

‘000 oz Au PRODUCTION BY YEAR

1850 1870 1890 1910 1930 1950

BENDIGO GOLDFIELD FIRST 11 YEARS

Alluvial ounces 4.0 Moz Reef ounces 18.0 Moz Total 22.0 Moz

Alluvial oz Au Lode oz Au TOTAL oz Au 300,000 700,000 980,000 620,000 650,000 880,000 750,000 730,000 690,000 570,000 410,000

TOTAL 3,570,000 3,710,000 7,280,000

slide-14
SLIDE 14

Slide 14

Be Bendig igo: : a

a world ld-cla lass go gold ld t tar arget

BENDIGO URBAN AREA

H i s a t

  • ric

l P r d

  • u

c t i

  • n

Zo n e

Hustlers Line

1.6mt @17.6g/t Au (918,000oz)

Garden Gully Line

10.8mt @15.0g/t Au (5,203,000oz)

New Chum Line

7.9mt @15.1g/t Au (3,850,000oz)

Deborah Line

0.46mt @14.7g/t Au (217,000oz)

Sheepshead Line

2.3mt @11.6g/t Au (852,000oz)

Nell Gwynne Line Napoleon Line

NORTH

kilometres 2

Bendigo Goldfield

Historical Gold Production from Lines of Lodes

18 million ounces of reef gold

4 million ounces of alluvial gold

Includes possibly 7 million

  • unces in top 200 metres

Large footprint (8kms x 3kms)

slide-15
SLIDE 15

Slide 15

2012/13: 2012/13: Te

Testin ing the Th Thir ird d Dim imensio ion

 Large gold footprint in oxidised zone with high grades

but little testing below

 Have confirmed three prospects with high grades  Need 10,000 metres angled diamond drilling /RC  Test other shallow areas with aircore

Objective: Minimum 150,000 ounces

  • f Inferred Gold Resource
slide-16
SLIDE 16

Slide 16

Heads of Agreement

Initial Phase

 $2,100,000 exploration spend by January 2014 to earn 50%

interest in project with approx. $1.9 million spent to date At Farm-in

 2,500,000 CYL shares

Future Farm-in

 $2,100,000 exploration spend to earn up to 75% interest in

project

 Providence Gold & Minerals free carried until decision to mine

Fo Four r Eag agle les s Fa Farm rm-in in Agr greeme ment

slide-17
SLIDE 17

Slide 17

Un Unit ity y Gol

  • ld Pla

lant

 600,000 tpa  Original cost

  • approx. $65M

 Built in 2006  Gravity/CIL  90% recovery  Exploration ground

slide-18
SLIDE 18

Slide 18

Option to Purchase Agreement

Pre exercise

 Option until 31 January, 2013  1 x $100,000 option payments remaining (November)  Unity to keep tenements in good standing and maintain plant and

equipment during option period

Post exercise (31 January 2013)

 2,000,000 CYL shares  $4,000,000 of CYL shares to a maximum of $10,000,000  Deferred royalty on future production with initial payment of

$2,000,000 after 50,000t, plus production royalty of $5/t up to maximum of $4,000,000

 Replace environmental bond of approximately $6,000,000

Un Unit ity y Gol

  • ld Pla

lant t Op Opti tion

  • n
slide-19
SLIDE 19

Slide 19

Ca Cata taly lyst st Ca Capit ital al Str Structu ture re

Capital Structure (ASX: CYL & CYLO)

 46,071,298 fully paid ordinary shares

– 5,758,988 listed 50 cent options expiring 15/01/2013 – 1,000,000 unlisted 20 cent options expiring 30/06/2014 – 1,000,000 unlisted 30 cent options expiring 30/06/2015 – 700,000 unlisted Performance Rights

 Top 20 control approximately 75% of issued capital

Cash in hand

 A$1.8 million (at 30 June 2012)

Market Capitalisation

 A$21 million (at 46 cents per share)

slide-20
SLIDE 20

Slide 20

Directors

 Bruce Kay – Technical  Stephen Boston – Chairman  Robin Scrimgeour – Non-executive  Gary Schwab – Non-executive

Officers/Advisors

 Frank Campagna – Company Secretary  John Arbuckle – Corporate Advisor

Co Corp rpor

  • rat

ate Str Structu ture re - Dir irecto tors rs

slide-21
SLIDE 21

Slide 21

Competent Person’s Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Bruce Kay, who is a Fellow of the Australasian Institute of Mining and Metallurgy and is a non-executive director of Catalyst Metals Limited. Mr Kay has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves’. Mr Kay consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Co Comp mpete tent t Pers rson

  • ns

s Sta State teme ment

slide-22
SLIDE 22

Slide 22

This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive or complete. Recipients should conduct their own investigations and perform their

  • wn analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and
  • pinions contained in this presentation.

This presentation is for information purposes only. Neither this presentation nor the information in it constitutes an

  • ffer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction.

This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdictions. Recipients should inform themselves of the restrictions that apply in their own

  • jurisdiction. A failure to do so may result in a violation of securities laws in such a jurisdiction.

This presentation does not constitute investment advice and has been prepared without taking into account the recipient’s investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments.

To the fullest extent permitted by law, Catalyst and its officers, employees, agents and advisers do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions, estimates, forecasts or other representations contained in this presentation. No responsibility for any errors or omissions from this presentation arising out of negligence or otherwise is accepted.

This presentation may include forward looking statements. Forward looking statements are only predictions and are subject to risks, uncertainties and assumptions which are outside the control of Catalyst. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward looking statements in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under any applicable law and the ASX Listing Rules, Catalyst does not undertake any obligation to update or revise any information or any of the forward looking statements in this presentation of any changes in events, conditions or circumstances on which any such forward looking statement is based.

Disc sclaimer an

and Fo

Forward Loo

  • oki

king g Statements

slide-23
SLIDE 23

Investor Presentation

September 2012

Bruce Kay

Non-Executive Director

Steve Boston

Non-Executive Chairman