Investment Analysts And Fund Investment Analysts And Fund Managers Visit Managers Visit Bafokeng Rasimone Plat latinum Mine inum Mine Bafokeng Rasimone P 11 March 2005 Agenda Agenda Salient Features Location & Mine
Agenda Agenda
Salient Features Location & Mine infrastructure layout Safety and Environment Resources and Reserves Mining Method Production Operating Cost Capital Programme Human Resources Key Business Issues Styldrift
Salient Features: 2004 Salient Features: 2004
Good safety performance Increase in immediately available ore reserves Increased understanding of orebody Tons from underground up 4% Conversion to breast mining accelerated (increased from 30% in
2003 to the current 80%)
Concentrator recoveries significantly increased (Ounces from
underground up 7%)
Wet screening plant commissioned Cost per ounce increased by 7.6% notwithstanding the wage
strike
JV fully operational from March 2004
Location Location
Styldrift Frisch-gewaagd Boschkoppie
BRPM JV lease area BRPM JV lease area
Mine infrastructure layout Mine infrastructure layout
SOUTH SHAFT
to BOSHOEK STATION 1km to GA- LUKA Existing Reservoir
ROBEGA RASIMONE
IMPALA PLATINUM LTD.
to RUSTENBURG U G 2 S U B
- O
U T C R O P to RUSTENBURG t
- D
E R D E P O O R T FARM SUB- DIVISION
W a s t e D u m p Waste Dump
BOSCHKOPPIE 104 JQ
NORTH SHAFT
RW DAM TAILINGS DAM M E R E N S K Y S U B O U T C R O P
TRUE NORTH
Servitude EASTERN EXTREMITY OF PROPOSED TOWNSHIP DEVELOPMENT ( V.K.E.) SEWAGE CONCENTRATOR OFFICES SOUTH D E x i s t i n g R a i l w a y L i n e to THABAZIMBI 74 Ktpm 98 Ktpm 44Ktpm
Safety Milestones Safety Milestones
One Million Fatality Free Shifts
= 4 Times
– Dates: • 23 September 2001
- 13 January 2003
- 8 December 2003
- 18 January 2005
North Shaft 2 Million Fatality free April 2004 South Shaft 1 Million Fatality free shifts April 2004 OHSAS 18001 Certification November 2004 Process plant 5 years without a lost time Injury Logistic`s 4 Years without a lost time Injury Opencast 3½ year project completed without a lost time injury Process awarded with MMMA for 4 years (last one October 2004) Cementation mining = 5 Star NOSA awards at both shafts ISO 14001 Certification Apr 2002 Won EMEM award in 2000 and again 2002
Safety
Lost Time Injury Frequency Rate
- 0.50
1.00 1.50 2.00 LTIFR 1.70 0.64 0.62 2002 2003 2004
Safety
Fatal Injury Frequency Rate
- 0.01
0.01 0.02 0.02 0.03 0.03 0.04 FIFR 0.03 0.01 0.01 2002 2003 2004
EMS Status
– Continued ISO14001 Certification confirmed in third CAV audit in 2004
Waste management
– Effective system with permitted landfill site on mine
Dust
– Dust fall out low except within plant area near ROM stockpile and crusher.
Public Participation
– Bi-annual environmental committee meeting held
Social Issues
– Transformation forum – Addicted to business program – Environmental awarness interventions at local schools – Aligned with minerals act and charter
Environment Environment
Resources and Reserves Resources and Reserves
Reserves and Resources (50%)*
Reserves Merensky Reef Mt 4E grade Proved 10,1 @ 4.90 g/t Probable 7.5 @ 4.84 g/t Total 17,6 @ 4.87 g/t Resources Merensky Reef UG2 Reef Mt 4E grade Mt 4E Grade Measured 1.7 @ 5.20 g/t Indicated 22.5 @ 5.69 g/t 7.9 @ 5.19 g/t Inferred 63.9 @ 6.39 g/t 95.1 @ 5.09 g/t Total 86.4 @ 6.20 g/t 104.7 @ 5.10 g/t The above reserves and resources are the 50% attributable to Anglo Platinum following finalisation
- f the JV
* At 31 December 2004, reserves are in addition to resources
Proved Reserve Probable Reserve Indicated Resource Inferred Resource
Boschkoppie
Schematic
Merensky reef: Merensky reef: resources and reserves resources and reserves
Boschkoppie Boschkoppie: : Merensky reef Strategy Merensky reef Strategy
North shaft 19 years South shaft 11 years South D 2 years Merensky Depletion
Immediately Available Ore Reserves
2 4 6 8 10 12 14 Months 3 7.3 6.7 10.3 11.7 2000 2001 2002 2003 2004
- Planned increase to 18 months in 2006
Stratigraphic Stratigraphic Section Section
75m – 90m
BASTARD REEF MERENSKY REEF UG2 CHROMITITE LAYER
18m – 25m 9m
UG1 CHROMITITE LAYER
BRPM BRPM – – Schematic section showing reef Schematic section showing reef variations variations
Contact reef Pegmatoidal reef
FW 2
FW 1 An FW 5
FW 4
FW 3
MID 2 Merensky pyroxenite POTHOLE REEF
FW 6
1 2 3 4
0.4m 5 m 1.6m 0.4m 0.2m 1.5m 1 m FW 1 FW 1 POTHOLE FAC POTHOLE FACIES ES FW 3 FW 3 POTHOLE FAC POTHOLE FACIES ES FW 6 FW 6 POTHOLE FAC POTHOLE FACIES ES
Mining Method Mining Method
Original Design 200 ktpm Merensky Operation 2 Twin Decline Shaft Clusters
– North and South Shafts
Dip Mining Conveyor Manriding Flatter Structures English Literate Employees Team Concept Multiskilling Total Package Remuneration
Original Design Original Design
Opencast Merensky - Complete Opencast UG2 - Complete South D Mechanised Section Commenced 2001
– Initially XLP bord and pillar section – Converting to hybrid mechanised mining – Depletion early 2007
Additional Projects Additional Projects
Planned Steady State Production Increased To 220 ktpm
– Mitigate Lower Grade
Converting To Breast Mining From Dip Mining
– Currently 80% breast mining from 30% in 2003 – Results in reduced development requirements
Chairlifts Planned For Phase 2 Deepening Reverting To Single Skilled Operators
Changes to Original Design Changes to Original Design
BREAST LAYOUT
Down dip cross-cuts No boxes in haulage No SPD’s
Up Up-
- Dip To Breast Conversion
Dip To Breast Conversion Schematic Schematic
Boxfront Haulage Double SPD
UP-DIP LAYOUT
Down dip cross-cuts No boxes in haulage Travelling Way
Not Pre-Raised
Cross Cut
Direction OF Mining
Boxfront Haulage Travelling Way Raise Cross Cut
Open Up X-Cut Spacing
Direction OF Mining Direction OF Mining
Production Production
Stoping – Centare Profile
BRPM Total Square Metres
10 20 30 40 50 60 Square Metres (000's)
Actual/Fcast 1 1 3 8 10 11 12 11 14 14 12 11 18 18 16 23 23 24 23 15 24 27 29 33 36 31 32 36 36 42 44 29 45 38 39 41 44 42 55 50 48 51 46 37 48 45 48 45 51 53 54 51 45 36 50 41 2000 Avg 5 5 5 5 5 5 5 5 5 5 5 5 2001 Avg 18 18 18 18 18 18 18 18 18 18 18 18 2002 Avg 33 33 33 33 33 33 33 33 33 33 33 33 2003 Avg 45 45 45 45 45 45 45 45 45 45 45 45 2004 Avg 47 47 47 47 47 47 47 47 47 47 47 47 2005 Avg YTD Plan J-00 F- 00 M- 00 A- 00 M- 00 J-00 J-00 A- 00 S- 00 O- 00 N- 00 D- 00 J-01 F- 01 M- 01 A- 01 M- 01 J-01 J-01 A- 01 S- 01 O- 01 N- 01 D- 01 J-02 F- 02 M- 02 A- 02 M- 02 J-02 J-02 A- 02 S- 02 O- 02 N- 02 D- 02 J-03 F- 03 M- 03 A- 03 M- 03 J-03 J-03 A- 03 S- 03 O- 03 N- 03 D- 03 J-04 F- 04 M- 04 A- 04 M- 04 J-04 J-04 A- 04 S- 04 O- 04 N- 04 D- 04
Strike
BRPM Development Metres (Excluding Sinking)
- 500
1,000 1,500 2,000 2,500 3,000 3,500 Metres
Actual 849 946 1,5 42 1,3 04 1,7 83 1,8 29 1,6 64 1,4 76 1,6 09 1,3 89 840 939 1,5 01 1,3 68 1,9 68 1,4 13 2,2 23 2,0 66 1,9 89 2,0 22 2,0 80 2,3 88 2,1 85 1,4 86 1,9 02 2,1 20 2,8 25 2,4 79 2,8 34 2,1 27 2,8 25 2,8 65 2,6 12 2,9 31 2,9 33 2,1 64 2,8 62 2,4 28 2,5 42 2,0 42 2,5 36 2,7 57 3,0 91 2,6 00 2,6 44 2,9 02 2,6 51 2,0 32 2,4 79 2,0 44 2,7 62 2,0 24 2,6 83 2,9 61 2,8 67 3,0 23 2,6 23 1,9 16 2,9 87 2,5 76 2000 Avg 1,3 47 1,3 47 1,3 47 1,3 47 1,3 47 1,3 47 1,3 47 1,3 47 1,3 47 1,3 47 1,3 47 1,3 47 2001 Avg 1,8 91 1,8 91 1,8 91 1,8 91 1,8 91 1,8 91 1,8 91 1,8 91 1,8 91 1,8 91 1,8 91 1,8 91 2002 Avg 2,5 51 2,5 51 2,5 51 2,5 51 2,5 51 2,5 51 2,5 51 2,5 51 2,5 51 2,5 51 2,5 51 2,5 51 2003 Avg 2,5 91 2,5 91 2,5 91 2,5 91 2,5 91 2,5 91 2,5 91 2,5 91 2,5 91 2,5 91 2,5 91 2,5 91 2004 Avg YTD 2,5 79 2,5 79 2,5 79 2,5 79 2,5 79 2,5 79 2,5 79 2,5 79 2,5 79 2,5 79 2,5 79 2,5 79 Plan J- 00 F- 00 M- 00 A- 00 M- 00 J- 00 J- 00 A- 00 S- 00 O- 00 N- 00 D- 00 J- 01 F- 01 M- 01 A- 01 M- 01 J- 01 J- 01 A- 01 S- 01 O- 01 N- 01 D- 01 J- 02 F- 02 M- 02 A- 02 M- 02 J- 02 J- 02 A- 02 S- 02 O- 02 N- 02 D- 02 J- 03 F- 03 M- 03 A- 03 M- 03 J- 03 J- 03 A- 03 S- 03 O- 03 N- 03 D- 03 J- 04 F- 04 M- 04 A- 04 M- 04 J- 04 J- 04 A- 04 S- 04 O- 04 N- 04 D- 04
Development (excl sinking)
Strike
Tons Milled Tons Milled
- 500
1,000 1,500 2,000 2,500 3,000 Tons Milled (000's)
Tons Milled Surface 101 1,191 970 633 198 4 Tons Milled U/G 342 921 1,858 2,283 2,377 Total Tons Milled 101 1,533 1,892 2,491 2,481 2,381 1999 2000 2001 2002 2003 2004
- Build up to 220ktpm in H2 2005
Grade Grade
- 1.00
2.00 3.00 4.00 5.00 g/t 4E Built Up Grade 4.61 4.42 4.22 4.50 4.47 2000 2001 2002 2003 2004
- Expect grade improvement to 4.7 g/t by 2006
Plant 4E Recovery Plant 4E Recovery
0.00% 20.00% 40.00% 60.00% 80.00% 100.00% % Recovery 4E 4E Recovery 65.86% 71.97% 77.82% 80.71% 85.83% 2000 2001 2002 2003 2004
- No further significant short-term increase expected
Process Process
Wet screening modification completed to achieve 220ktpm Planned recovery increases have been realised
- No UG2 from February 2004
- Expert systems in place
- Process optimisation
Equivalent Refined Pt Ounces* Equivalent Refined Pt Ounces*
*Mines Production of metal in concentrate converted to refined production
- 20.0
40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 200.0 Pt Oz's (000's)
Pt Oz U/G Pt Oz Surface Pt Oz Surface 3.4 87.3 51.3 29.4 10.7 Pt Oz U/G 24.9 75.1 132.1 172.8 185 Total Pt Oz 3.4 112.2 126.4 161.5 183.5 185 1999 2000 2001 2002 2003 2004
6 000 Ounces lost due to strike
- 200 000 refined platinum ounces planned for 2005
- Volume of 220 000 refined platinum ounces pa from 2006
Operating Costs Operating Costs
Costs Costs
Cash on mine cost per equivalent refined Pt Oz
- 1,000
2,000 3,000 4,000 5,000 6,000
R /Eqv ref Oz
R/Pt Oz 4,266 4,382 4,456 4,795 % Increase 2.7% 1.7% 7.6% 2001 2002 2003 2004
- 2004 increase without strike: 4.2%
- Underground unit costs likely to remain constant in real terms
Costs Costs
Cash on mine cost per ton milled
- 100
200 300 400 Rand/Ton R/Ton 285 284 329 372 2001 2002 2003 2004
- Increase due to reduction in low cost surface tons
Capital Capital Programmes Programmes
Capital Progammes
Average capital expenditure R200m pa over life of mine Phase 2 Extensions
– Ongoing capital for the replacement of current production. – Additional R100m p.a. for next 4 years
Wet Screening
– Plant was commissioned in 2004 to ensure sustainable throughput of 220 ktpm.
Human Resources Human Resources
Human Resource Development
BRPM has both underground and surface training centres. The training department is IS09001 compliant. FOG competent A and B.
– On schedule to meet exemption requirements
Full accreditation as national training provider
– Twice audited by MQA, Anglo platinum full accreditation ratified by committee
Mining Charter Compliance
– Social plan approved – Talent management strategy in place
Key Business Issues Key Business Issues
Key Business Issues
Create Flexibility Achieve planned grade Improve underground crew efficiencies Reduce costs Achieve charter compliance
Cost Cost Optimisation Optimisation
Restructuring commenced during 2004
– Cost effective and efficient management structure in place – Changing to single skilled operators
Supply chain initiative
– Wider implementation
Efficiency and grade improvements
– Reduced dilution – Improved in-stope team efficiency
Styldrift
Styldrift Styldrift
Geological resource modeling
initially (pre 2002) targeted the thick merensky value zone in the South west of the farm Styldrift.
3D seismic completed 2002 on this
portion of the property.
Further drilling to commence in 2005
to increase resource confidence of both Merensky and UG2.
Pre-feasibility commenced with
further investigation of several mine designs identified from the OME in
- rder to confirm mine design for full
feasibility in 2006.
The life of mine exploitation strategy
- f Merensky and UG2 reefs is being