Integrated Mission Completion Acquisition Site Tour Handout Aerial View of Savannah River Site Liquid Waste System Liquid Waste System Information Composite Waste Inventories Liquid Waste System Disposition Paths


slide-1
SLIDE 1
  • Aerial View of Savannah River Site Liquid Waste System
  • Liquid Waste System Information
  • Composite Waste Inventories
  • Liquid Waste System Disposition Paths
  • Liquid Waste System Gear Chart
  • F-Tank Farm Layout
  • F-Tank Farm Aerial Photo with Labels
  • H-Tank Farm Layout
  • H-Tank Farm Aerial Photo with Labels
  • Effluent Treatment Facility Aerial Photo with Labels
  • Saltstone Mixer and Grout Pump
  • Saltstone Disposal Unit (SDU) Location Map
  • SDU Aerial Progress Photo

Integrated Mission Completion Acquisition Site Tour Handout

slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7

F-Area Tank Farm

slide-8
SLIDE 8
slide-9
SLIDE 9

H-Area Tank Farm

slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12

Critical Saltstone Production Facility Equipment

Grout Pump Grout Mixer

slide-13
SLIDE 13

SDUs – Planned Layout and Statistics

Tank Dimensions 375’ diameter x 43’ high Volume 32.8 million gallons (41’) Mud Mat Concrete 4,252 cubic yards Tank Concrete ~16,872 cubic yards Wall Panels 25 total, 24” thick at base, 12” thick at top Floor Area 110,000 sq. ft. Columns 208 – 24” diameter Roof Coating System to reflect solar absorption and minimize thermal stress 425 post tensioning rods in walls 7 layers of prestress cables (341 miles) Liner panels >7,000 pieces, 11’x41’x3mm thick Piping 2,400 linear feet and 17 valves