INTEGRAL Revolutionary Engineering trust | nurture | inspire JOHN McDonald, PE, LEED AP Principal : Mechanical Engineer MECHANICAL + ELECTRICAL ENGINEERS ENERGY + WATER EFFICIENCY CONSULTANTS SUSTAINABILITY + LEED CONSULTANTS 350+ STAFF IN


slide-1
SLIDE 1

INTEGRAL

Revolutionary Engineering

trust | nurture | inspire

JOHN McDonald, PE, LEED AP

Principal : Mechanical Engineer

slide-2
SLIDE 2

INTEGRAL GROUP ZERO NET ENERGY RENOVATION PROJECTS

MECHANICAL + ELECTRICAL ENGINEERS ENERGY + WATER EFFICIENCY CONSULTANTS SUSTAINABILITY + LEED CONSULTANTS 350+ STAFF IN SIXTEEN OFFICES 35+ LEED PLATINUM CERTIFIED 8+ LIVING BUILDING PROJECTS 15+ AIA COTE TOP TEN BUILDINGS 60+ NET ZERO ENERGY PROJECTS…1M SF OCCUPIED

slide-3
SLIDE 3

NET ZERO ENERGY EXPERTS

slide-4
SLIDE 4

OUR APPROACH :: MEASURED. METERED. VERIFIED. REAL.

slide-5
SLIDE 5

ZERO NET ENERGY RENOVATIONS

slide-6
SLIDE 6

‘00 ‘10 ‘05 ‘20

INTEGRAL GROUP SAN JOSE OFFICE

slide-7
SLIDE 7

CLIF BAR HEADQUARTERS

slide-8
SLIDE 8

CA LOTTERY SANTA FE SPRINGS OFFICE :: LPAS ARCHITECTURE

slide-9
SLIDE 9

LINKEDIN MAUDE AVENUE :: STUDIOS ARCHITECTS

slide-10
SLIDE 10

EXPLORATORIUM MUSEUM :: EHDD

slide-11
SLIDE 11
slide-12
SLIDE 12

SILICON VALLEY ZNE RETROFITS

slide-13
SLIDE 13

INDIO BUILDING :: RMW ARCHITECTS

slide-14
SLIDE 14
  • 30,000 SF square one-story office warehouse circa 1970
  • Uninsulated concrete walls, wood roof and single pane windows
  • DARK, DINGY, DERELICT and UNRENTABLE!
slide-15
SLIDE 15
slide-16
SLIDE 16

INDIO BUILDING :: RMW ARCHITECTS

slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19

20 40 60 80 100 120

Existing Standard 415 Indio

Tons

TONS 20 40 60 80 100 120 415 Indo Standard Existing

slide-20
SLIDE 20

Indio Building – November 2015 Max OSA Temp Max Space Temp Max Mass Temp

slide-21
SLIDE 21
slide-22
SLIDE 22

BUSINESS CASE FOR ZERO NET ENERGY

  • ADDITIONAL COST TO RENOVATE SUSTAINABLY VS. LESS EXPENSIVE

STANDARD METHOD OF RENOVATING => ($49.84 / SF)

  • ADDITIONAL VALUE CREATED DUE TO A REDUCTION IN OPERATING

EXPENSES AND RESERVE REQUIREMENTS => $52.94 / SF

  • ADDITIONAL VALUE DUE TO ACCELERATED LEASE-UP TIME VS. AVERAGE

MARKET DOWNTIME => $22.81 / SF

  • ADDITIONAL VALUE DUE TO RECEIVING A PREMIUM IN RENT OVER THE

TOP OF THE MARKET RENTS => $34.47 / SF

slide-23
SLIDE 23

ACCELERATE

Taking Net Zero Energy from Replication to Production

slide-24
SLIDE 24

MATHILDA BUILDING

slide-25
SLIDE 25

MATHILDA BUILDING :: STUDIO G ARCHITECTS

slide-26
SLIDE 26
slide-27
SLIDE 27

PASTORIA BUILDING

slide-28
SLIDE 28

PASTORIA BUILDING : WRNS STUDIO

slide-29
SLIDE 29
slide-30
SLIDE 30

Slide Title

slide-31
SLIDE 31

Wellness

Human-centric Electric Light

slide-32
SLIDE 32

URBAN ZNE RETROFIT

slide-33
SLIDE 33
slide-34
SLIDE 34
slide-35
SLIDE 35

DPR CONSTRUCTION SAN FRANCISCO :: FORM 4 ARCHITECTS

slide-36
SLIDE 36
slide-37
SLIDE 37

Front End Building Dashboard

slide-38
SLIDE 38

Actual Monthly Energy

slide-39
SLIDE 39

Don’t Install an ICE MACHINE! Smart plug strips can be a little complicated. Getting data out of a BMS is a pain – cloud based is ideal Right Size the PV The earlier you complete Cx - the better Popularity Curse of Net Positive Submeters for subtenants too.

1 2 3 4 5 6 7

Lessons Learned

slide-40
SLIDE 40